Uncategorized pages

Jump to navigation Jump to search

Showing below up to 500 results in range #51 to #550.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 09122012 JlabShipment
  2. 1-2-07 Tuning
  3. 1-8-08 PrelimResults
  4. 10-29-08 GEM HRRL Photon Runs
  5. 10-30-08 GEM HRRL Photon Runs
  6. 10-31-08 GEM HRRL Photon Runs
  7. 10/30/13 Mayir
  8. 1000 Events per degree in the range 5 to 40 degrees for Lab Frame
  9. 100mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  10. 100mA, 100ns pulse width, 25cm from beam pipe
  11. 10312013 TestRun
  12. 10mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  13. 11-10-2016
  14. 11-11-2016
  15. 11/21/2013 Be source
  16. 12-23-2016
  17. 12-GeV NSTAR
  18. 12/09/2013
  19. 12 10 2012 HRRL DetectorTests
  20. 137Cs Shot Log
  21. 170047 50% Se Soil Mixture Analysis
  22. 170048 10% Se Soil Mixture Analysis
  23. 170049 1% Se Soil Mixture Analysis
  24. 170050 0.1% Se Soil Mixture Analysis
  25. 1938:D2O Beam-down
  26. 1938:D2O Beam-down ND TOF
  27. 1938:D2O Beam-down ND TOF calibration
  28. 1938:D2O Beam-down ND energy
  29. 1938:D2O Beam-down ND energy neutronsOnly
  30. 1939:D2O Beam-down
  31. 1939:D2O Beam-down ND TOF
  32. 1939:D2O Beam-down ND TOF calibration
  33. 1939:D2O Beam-down ND energy
  34. 1939:D2O Beam-down ND energy neutronsOnly
  35. 1940:D2O Beam-down
  36. 1940:D2O Beam-down ND TOF
  37. 1940:D2O Beam-down ND TOF calibration
  38. 1940:D2O Beam-down ND energy
  39. 1940:D2O Beam-down ND energy neutronsOnly
  40. 1941:D2O Beam-up
  41. 1941:D2O Beam-up ND TOF
  42. 1941:D2O Beam-up ND TOF calibration
  43. 1941:D2O Beam-up ND energy
  44. 1941:D2O Beam-up ND energy neutronsOnly
  45. 1944:D2O Beam-down
  46. 1944:D2O Beam-down ND TOF
  47. 1944:D2O Beam-down ND TOF calibration
  48. 1944:D2O Beam-down ND energy
  49. 1944:D2O Beam-down ND energy neutronsOnly
  50. 1945:D2O Beam-up
  51. 1945:D2O Beam-up ND TOF
  52. 1945:D2O Beam-up ND TOF calibration
  53. 1945:D2O Beam-up ND energy
  54. 1945:D2O Beam-up ND energy neutronsOnly
  55. 1946:D2O Beam-up Rad-out
  56. 1946:D2O Beam-up Rad-out ND TOF
  57. 1946:D2O Beam-up Rad-out ND TOF calibration
  58. 1946:D2O Beam-up Rad-out ND energy
  59. 1946:D2O Beam-up Rad-out ND energy neutronsOnly
  60. 1947:H2O Beam-up
  61. 1947:H2O Beam-up ND TOF
  62. 1947:H2O Beam-up ND TOF calibration
  63. 1947:H2O Beam-up ND energy
  64. 1947:H2O Beam-up ND energy neutronsOnly
  65. 1948:H2O Beam-down
  66. 1948:H2O Beam-down ND TOF
  67. 1948:H2O Beam-down ND TOF calibration
  68. 1948:H2O Beam-down ND energy
  69. 1948:H2O Beam-down ND energy neutronsOnly
  70. 1949:DU
  71. 1949:DU ND TOF
  72. 1949:DU ND TOF calibration
  73. 1949:DU ND energy
  74. 1949:DU ND energy neutronsOnly
  75. 1 credit vs 9 credits
  76. 2-LTD-brick x-pinch driver
  77. 2-LTD-brick x-pinch driver notes
  78. 2-Neutron Correlation
  79. 2-Neutron Correlation Setup Stuff
  80. 2007 Interns
  81. 2007 Proposal
  82. 2008 NSF Proposal
  83. 2009
  84. 2010
  85. 20101019 BlackRockCanyon
  86. 2011
  87. 20110131 OxfordPeak
  88. 20110626 MirriamLakeIdaho
  89. 201109 R1ProgressRep
  90. 201110 R1ProgressRep
  91. 201111 R1ProgressRep
  92. 201112 R1ProgressRep
  93. 2011 44MeV Analysis 2011
  94. 2011 NSF Proposal
  95. 2012
  96. 201201 R1ProgressRep
  97. 201202 R1ProgressRep
  98. 201203 R1ProgressRep
  99. 201204 R1ProgressRep
  100. 201205 R1ProgressRep
  101. 201206 R1ProgressRep
  102. 201207 R1ProgressRep
  103. 201208 R1ProgressRep
  104. 201209 R1ProgressRep
  105. 201210 R1ProgressRep
  106. 201211 R1ProgressRep
  107. 201212 R1ProgressRep
  108. 2012AnnihCountrRateEstimate
  109. 2012 NSF Proposal
  110. 2012 run DAQ malfunction
  111. 201301 R1ProgressRep
  112. 201302 R1ProgressRep
  113. 201303 R1ProgressRep
  114. 201304 R1ProgressRep
  115. 201305 R1ProgressRep
  116. 201306 R1ProgressRep
  117. 201307 R1ProgressRep
  118. 201308 R1ProgressRep
  119. 201309 R1ProgressRep
  120. 201310 R1ProgressRep
  121. 201311 R1ProgressRep
  122. 201312 R1ProgressRep
  123. 2013 MRI CLAS12 LeveL2Trig
  124. 201401 R1ProgressRep
  125. 201402 R1ProgressRep
  126. 201403 R1ProgressRep
  127. 2015 NSF Proposal
  128. 2018 NSF Proposal
  129. 2020 NSF Proposal
  130. 20min run peak sensing histograms
  131. 252CF
  132. 25MeV Neutron Detector Set-up
  133. 25MeV Neutron Detector Setup
  134. 25mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  135. 25mA, 100ns pulse width, 25cm from beam pipe
  136. 25mA, 100ns pulse width, 50cm from beam pipe
  137. 25mA, 100ns pulse width, 50cm from beam pipe, tungsten target with aluminum beamstop
  138. 2D Faraday Cup Data Analysis
  139. 2NCorr E1 E2 correlations VS theta abs
  140. 2NCorr Forward Detectors
  141. 2NCorr Photon flux estimate
  142. 2NCorr Rates 2017
  143. 2NCorr SPDP Introduction
  144. 2NCorr SP DP analysis
  145. 2NCorr neutron ToF cut
  146. 2 Bricks Fabrication
  147. 2 LTD bricks driver progress
  148. 2cm XLineTarg 270 Degree Rotation 09/23/16
  149. 2cm XLineTarg 90 Degree Rotation 09/23/16
  150. 2cm XYTarg Z=0 Vx and Vy Differences 09/23/16
  151. 2cm XZTarg Y=0 Vx and Vz Differences 09/23/16
  152. 2cm YLineTarg 0 Degree Rotation 09/23/16
  153. 2cm YLineTarg 180 Degree Rotation 09/23/16
  154. 2cm YLineTarg 210 Degree Rotation 09/23/16
  155. 2cm YLineTarg 30 Degree Rotation 09/23/16
  156. 2cm YZTarg X=0 Vz and Vy Difference 09/23/16
  157. 2nCor 44
  158. 2nCor Equipment
  159. 2n ASCII files
  160. 2n BKG data
  161. 2n Corr JeffsPlots
  162. 2n D2O/H2O/Empty target data
  163. 2n DU data
  164. 2n Detector efficiency test
  165. 2n Equipment
  166. 2n Neutron signal attenuation
  167. 2n Position resolution
  168. 2n TDC map
  169. 2n corr theta VS n-n energies
  170. 2n corr theta VS n-n energies (1)
  171. 2n corr theta VS n-n energies (2)
  172. 2n corr theta VS n-n energies (3)
  173. 2n corr theta VS n-n energies (4)
  174. 2n correlations
  175. 2n correlations in Photofission
  176. 2n geometry of the setup
  177. 2n opening angle
  178. 2n preliminary data analysis
  179. 2n run list
  180. 3N Corr
  181. 4-gradient
  182. 4-momenta
  183. 4-vectors
  184. 40MeV BeamLineInstall 10252013
  185. 44 Linac Exit Geometry
  186. 44 MeV Beam Line Optimization
  187. 44 Setup
  188. 5-19-08
  189. 511 keV photon attenuation in tungsten
  190. 5252017 Anal
  191. 52x48 Steel Table
  192. 5mA, 100ns pulse width, 100cm from beam pipe with Titanium window
  193. 6cm ZLineTarg 0 Degree Rotation 09/23/16
  194. 6cm ZLineTarg 270 Degree Rotation 09/23/16
  195. 6cm ZLineTarg 90 Degree Rotation 09/23/16
  196. 8-07-2017
  197. 8-08-2017
  198. 8-09-2017
  199. 8-10-2017
  200. 8-11-2017
  201. 8-14-2017
  202. 8-15-2017
  203. 8-16-2017
  204. 8-18-2017
  205. 8 Channel CFD
  206. 90 degree beamline extension
  207. ACCAPP 09 PhotFis Poster
  208. ADBcrate CLAS12
  209. ADC
  210. ADC 3 Histogram Table
  211. ADC 7 Histogram Table
  212. ADS
  213. ASCII data files
  214. AW ADC 3 Histogram
  215. AW ADC 7 Histogram
  216. AW CLAS12R1
  217. AW Singles Prob Y88 2015
  218. A W CAA apparatus
  219. A W thesis
  220. A W thesis old
  221. A kind of analysis
  222. Absorbed Dose Information
  223. Abstract
  224. AccApp07
  225. Accelerator-Driven System
  226. Accelerator Driven Nuclear Reactor
  227. Accelerators Physics
  228. Accelerators Physics. Dr Kim Fall 2010
  229. Actinium Production
  230. Adding Apache Shares
  231. Admin Server
  232. Airline internet booking
  233. Airport Network Infrastructure
  234. Aka kaka
  235. Al subtracted ToF/Energy specrta
  236. All 3 detectors working
  237. All D2O Beam-down
  238. All D2O Beam-up
  239. Alpha Ionization
  240. Alpha particle simulation related
  241. Alter Phi Angles
  242. Altering Phi Angles
  243. Aluminum Converter
  244. Amex Promotion
  245. Analysis
  246. Analysis.groovy
  247. Analysis 03-26-2015
  248. Analysis of evio files
  249. Analysis of may 2017 runs
  250. Analysis scripts
  251. Angular distribution of neutrons from the photodisintegration of deuterium
  252. Anisotropic n's vs. isotropic ones
  253. Apartment
  254. Apex
  255. Api PubCLAS2000
  256. Apparatus Layout
  257. Apply, due: Jan 15 2014
  258. April
  259. April: Threshold Study
  260. April 17th 2017
  261. April 17th 2017 (PAA)
  262. Apt-Proxy
  263. ArCO2 IonizationPhysics
  264. Attenuation Measurements
  265. Attenuation Measurements NaI
  266. Au-196 5-08-22-13
  267. Au-196 Foil-08-22-13
  268. Aug 2017 ChkList
  269. August 10th 2017
  270. August 11th 2017
  271. August 14, 2007 - Cosmic Telescope
  272. August 14th 2017
  273. August 15, 2007 - Cosmic Telescope
  274. August 15th 2017
  275. August 16, 2007 - Cosmic Telescope
  276. August 17, 2007 - Cosmic Telescope
  277. August 23, 2007 - Cosmic Telescope
  278. August 24, 2007 - Cosmic Telescope
  279. August 27, 2007 - Cosmic Telescope
  280. August 28, 2007 - Cosmic Telescope
  281. August 29, 2007 - Cosmic Telescope
  282. August 30, 2007 - Cosmic Telescope
  283. August 31, 2007 - Cosmic Telescope
  284. August 8th 2017
  285. August 9th 2017
  286. B-field calculation
  287. BO-08-22-13
  288. BUILD GEMC SIMULATION.sh
  289. Back of the envelope calculation for e+/e- ratio
  290. Background
  291. BackupPC Notes
  292. Bayesian Nonparametrics
  293. BeamPipeHeating 4mmthick PbBi PositronTarget
  294. Beam Position Monitor Tests in HRRL
  295. Beam Test Apr 24 2012
  296. Beam Test Apr 26 2012
  297. Beam Test Jul 11 2012
  298. Beam Test Jul 12 2012
  299. Beam Test Jul 16 2012
  300. Beam Test Jul 17 2012
  301. Beam Test Jul 18 2012
  302. Beam Test Jul 19 2012
  303. Beam Test Jul 20 2012
  304. Beam Test Jul 23 2012
  305. Beam Test Jul 24 2012
  306. Beam Test Jul 25 2012
  307. Beam Test Jul 26 2012
  308. Beam Test Jul 27 2012
  309. Beam Test Jul 5 2012
  310. Beam Text May 17 2012
  311. Beam dump and sweep magnet G4 model
  312. Beam spot with a fancy Dan's screen
  313. Beamline Drawing 2011 J.Ellis
  314. Beamline Parts
  315. Beamline design (G. Stancari)
  316. Beamline design (Y. Kim)
  317. Beamline design drawing
  318. Benchmark GEMC Occupancy Prediction for 11GeV Electron Beam with 0T Solenoid for LH2
  319. Beta Transmission and Ionization
  320. BeulaLakeWY
  321. Bibliography
  322. Big Red
  323. Bin Shapes
  324. Bin Test
  325. Boise
  326. Books
  327. BoratedAluminum
  328. BoreShield
  329. Breakout Board Design
  330. Brem converter optimization
  331. Brems
  332. Brems Intensity Spectrum (with Collimation Factors) Plots
  333. Brems Intensity Spectrum (without Collimation Factors) Plots
  334. Bremsstrahlung lineshape for E0 = 16 MeV, Ti radiator
  335. Bremsstrahlung radiation properties, Ee=25 MeV
  336. BrianMuchilwa HW12
  337. Brian Articles
  338. Brian ToDo
  339. Brian mingw
  340. BriansRanLogbook
  341. Bubbl, Online Flowchart Too
  342. Bubbl, Online Flowchart Tool
  343. Bull
  344. Burg jeff E1 E2.py
  345. C++
  346. C-19
  347. CAA NaI HpGe CoinSetup
  348. CAD Components
  349. CAEN QDC V792
  350. CAEN TDC V 775
  351. CAEN V1290A TDC
  352. CAEN V1495 ADC
  353. CAEN V1495 IO
  354. CAEN V260 Scalr
  355. CAEN V488 TDC
  356. CAEN V775 TDC
  357. CAEN V785N ADC
  358. CAEN V792 ADC
  359. CAEN VX1190A TDC
  360. CAPSDAQ
  361. CED Verification of DC Angle Theta and Wire Correspondance
  362. CHIPS
  363. CHIPS IAC Run 5-27-08
  364. CHIPS IAC Run 5-28-08
  365. CHIPS IAC Run 5-29-08
  366. CHIPS IAC Run 5-30-08
  367. CHIPS Run Feb-2008
  368. CHIPS Run May-2008
  369. CHIPS collaboration
  370. CH 3D Printing
  371. CH 785NADC
  372. CH Calibration Sources
  373. CH Cf252 Sources
  374. CH Clean Room Renovations
  375. CH Code Repository
  376. CH DAQ2 Energy Calibration
  377. CH DD Ga
  378. CH Discriminator Dual Pulsing
  379. CH Gd Holders
  380. CH Gd Spectra
  381. CH HPGe Detector
  382. CH HPGe Efficiency
  383. CH HPGe Electronics Chain
  384. CH HPGe Log
  385. CH HPGe Work
  386. CH He3 Attenuation Measurements
  387. CH He3 Attenuation Measurements: 3 Different Cf252 Sources
  388. CH He3 Attenuation Measurements Repeated
  389. CH He3 Attenuation Measurements Revisited
  390. CH He3 Background Measurements
  391. CH He3 Pre-amp Noise Investigation
  392. CH He3 w/BorAl Gd In/Out
  393. CH High Activity Cf252
  394. CH Isotope Table
  395. CH Low Activity Cf252
  396. CH Meeting Notes
  397. CH NIM Bin Repair
  398. CH Outline
  399. CH PAS HPGe Amp Adjustment
  400. CH PAS He3 BorAl Attenuation Study
  401. CH PAS He3 Poly Boration Study
  402. CH PAS Master Logbook
  403. CH PAS Master Timeline
  404. CH PhD
  405. CH Phase II Run Plan
  406. CH Physics Questions
  407. CH Poly Density
  408. CH Preliminary Examination
  409. CH ROOT Nonuniform Binning
  410. CH Starting CODA & Reading CODA Data
  411. CH Task List
  412. CH Thesis
  413. CH Thesis Revision 1
  414. CH UNCL
  415. CH Weekly Reports
  416. CI Model 1416 Amplifier
  417. CLARA
  418. CLAS12DC ProjFactoids
  419. CLAS12R1ReadinessReview2011
  420. CLAS12R1 CosmicTestStand
  421. CLAS12R1 WireQualPic
  422. CLAS12 CleaRoomPrep 2011
  423. CLAS12 FastMC
  424. CLAS12 GEMC
  425. CLAS12 InclusiveRateEst4EG12
  426. CLAS12 MollerDataTable 12-16-2018
  427. CLAS12 R1
  428. CLAS12 R1 Progress Reports
  429. CLAS12 R1 Prototype 2-20-08
  430. CLAS12 R1 Prototype 9-16-07
  431. CLAS12 R1 S1 QA
  432. CLAS12 R1 S2 PrePotTensErr
  433. CLAS12 R1 S2 QA
  434. CLAS12 R1 S3 PrePotTensErr
  435. CLAS12 R1 S3 QA
  436. CLAS12 R1 S5 QA
  437. CLAS12 R1 S6 QA
  438. CLAS12 R1 SOW
  439. CLAS12 R1 Stringing Manual
  440. CLAS12 RateEst byWA
  441. CLAS12 SIDISpionRateEst4EG12
  442. CLAS12 Software
  443. CLAS12 r4135
  444. CLAS12 r4136
  445. CLAS12 r4139
  446. CLAS12 r4141
  447. CLAS6 Software
  448. CLAS CED
  449. CLAS apparatus
  450. CMsg
  451. CODA
  452. CODA REMEX
  453. CPAA DNDO NSF ARi-2013
  454. CPAA r5691-5693
  455. CZT gamma spec
  456. C 20
  457. C program for neutron efficiency
  458. CaGaS Phase I
  459. CaGaS Phase II
  460. CaGaS Phase II Physical Parameters
  461. CaGaS Phase I Cadmium
  462. CaGaS Phase I Expansion
  463. CaGaS Phase I Gadolinium
  464. CadBeamline
  465. Caen775Lib.c Code
  466. Calculating the differential cross-sections for the different materials, and placing them as well as the theoretical differential cross-section into a plot:
  467. Calculation of radiation yield
  468. Calculations of 4-momentum components
  469. Calgary, Canada
  470. Calibrating GEM detector
  471. Calibration 10-21-16 Det D
  472. Calibration 10-28-16 Det A
  473. Calibration February 2017
  474. Calibration Info
  475. Canberra HpGe preamp 2002C
  476. Canned Talks
  477. Cannon Beach, Oregon
  478. Car
  479. CarbonNanoTube X-raySource
  480. CargoScanner
  481. Cathode Profile
  482. Cathode drift 1-1.1k potential and count rate runs for 2.87kV GEM
  483. Cathode drift potential and count rate runs for 2.82kV GEM
  484. Cathode drift potential and count rate runs for 2.97kV GEM
  485. Cathode drift potential and count rate runs for 2.9kV GEM
  486. CenterTube
  487. Center of Mass for Stationary Target
  488. Cf-252 FTC-CFZ-431
  489. Cf-252 rates table
  490. Cf252 2017
  491. Cf252 NaI detector test. 12 Apr 2012
  492. Cf252 NaI detector test. Apr 2012
  493. Cf252 runs with HPGe
  494. CfFF Equipment
  495. Change in Wire Bin Number
  496. Changing Solenoid Field Rates in Sector 1
  497. Charge Collector Design
  498. Check Differential Cross-Section
  499. Chriss' Work Page
  500. Circular Cross Sections

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)