201306 R1ProgressRep

From New IAC Wiki
Jump to navigation Jump to search

6/3/13

Dion: String S3 with Debbie

Haitham: String S2 with David

David: String S2 with Haitham

Debbie: string S3 with Dion

Carlos: analyze cosmic data


6/4/13

Dion: Look for S5 signals then String S3 with Debbie in the afternoon

Haitham: String S2 with David

David: String S2 with Haitham then look for S5 signals

Debbie: Organize work area in the morning string S3 with Dion in the afternoon

Carlos: analyze cosmic data

Changed flow rate from 30 down to 50.

6/5/13

Dion: bring shipping crates from airport then String S3 with Debbie in the afternoon

Haitham: String S2 with David

David: String S2 with Haitham (left early)

Debbie: bring shipping crates from airport in the morning string S3 with Dion in the afternoon

Carlos: analyze cosmic data


6/6/13

Dion: String S3 with Debbie

Haitham: String S2 with David

David: String S2 with Haitham

Debbie: string S3 with Dion

Carlos: analyze cosmic data

6/10/13

Dion: String S2 & S3 with Debbie

Haitham: DC pictures

David: sick day

Debbie: String S2 & S3 with Dion

Carlos: Tension measurements & analyze cosmic data

S3: on Field row 154

S2: on Field row 161

6/11/13

Dion: String S3 with Debbie

Haitham: String S2 with David

David: String S2 with Haitham

Debbie: String S3 with Dion

Carlos: Tension measurements & analyze cosmic data


S2: on Field row 169 S3: on Field row 160

6/12/13

Dion: String S3 with Debbie

Haitham: String S2 with David

David: String S2 with Haitham

Debbie: String S3 with Dion

Carlos: Tension measurements & analyze cosmic data


6/13/13

Dion: String S3 with Debbie

Haitham: String S2 with David

David: String S2 with Haitham, took time off between 11am and 6pm

Debbie: String S3 with Dion

Carlos: Tension measurements & analyze cosmic data


S2: on Field row S3: on Field row

6/17/13

Dion: String S3 with Debbie

Haitham: taking scope pictures

David: day off

Debbie: String S3 with Dion

Carlos: Tension measurements & analyze cosmic data

6/18/13

Dion: String S3 with Debbie

Haitham: investigate high S5 high current draw

David: day off

Debbie: String with Dion

S2: on Field row 203

S3: on Field row 211

6/19/13

Dion: String S3 with Debbie

Haitham: String S2 with David

David: String S2 with Haitham, tension measurements in the afternoon

Debbie: String S3 with Dion

S2: on Field row 202

S3: on Sense wire 1

Carlos: work on analyzing data to determine efficiency

HV is off on S5. We will purge it with another gas bottle to see if the current decreases. Signals are still present even though the current is high.

6/20/13

Dion: String S3 with Debbie

Haitham: String S2 with David

David: String S2 with Haitham, install the HV on SL1 for one board , Dont use the kraken.

Debbie: String S3 with Dion

Carlos: work on analyzing data to determine efficiency


S2: on Field wire row 213

S3: on Sense wire row 23

6/24/13

Dion: String S3 with Debbie, taking the afternoon off

Haitham: String S2 with David, turn on S5 and check current draw

David: String S2 with Haitham, arrives at 9am; doctor's appointment

Debbie: String S3 with Dion

Carlos: wire tension measurments, work on analyzing data to determine efficiency


S2: on Field wire row 224

S3: on Sense wire row 46


6/25/13

Dion: String S3 with Debbie

Haitham: String S2 with David

David: String S2 with Haitham, install octopus on S5 SL2 and start HV burn in

Debbie: String S3 with Dion

Carlos: wire tension measurments, work on analyzing data to determine efficiency


S2: on Sense wire row 6

S3: on Sense wire row 66


CLAS12_R1_Progress_Reports