CH Clean Room Renovations

From New IAC Wiki
Jump to navigation Jump to search

Initial Pictures (May 2020)

Clean Room

Left hand side of clean room before cleaning.
Cross view of clean room before cleaning.
Right hand side of clean room before cleaning.
Right hand side of clean room, outside of the clean room barrier before cleaning.


Balcony

View from back right corner of the balcony before cleaning.
View from middle right wall of the balcony before cleaning.
Random assortment of equipment in the front right corner before cleaning.
View from back left corner (by stairs to The Pit) of the balcony before cleaning.
View from entrance of the balcony before cleaning.

















Control Room

View of back wall of the control room from front left corner.
View of right hand wall of the control room from back left corner.
View of front wall of the control room from back left corner.












CaGaS Phase I (PAS Experiment, May 2021)

May 2021: Right hand side of clean room with initial preparations for CaGaS Phase I.
May 2021: Cross view of clean room after cleaning.
May 2021: Cross view of clean room after cleaning.












DAQ System

May 2021: DAQ2 and the data acquisition rack



















Previous Page

PAS Experiment