CH DD Ga

From New IAC Wiki
Jump to navigation Jump to search

First gallium sample deposited into source vault at 1:34pm, 9/1/22.

Background run for sample 1: r7229

First gallium sample removed from source vault at 4:00pm, 9/4/22. Inserted into shielded HPGe tunnel at 4:01pm and covered. -> Run number: r7231.

  • 3.1 days (267960 seconds) spent with surface contact with Cf252 source.

Go Back

User:Harpconn