Beamline Drawing 2011 J.Ellis
Jump to navigation
Jump to search
Below is the Beamline sketch
File:HRRL BeamLine 03302011.pdf
Label | Beam Line Element | Z location from Gate Valve center of element | Dimensions of Element |
T1 | Torroid 1 | -0.05 m | |
G1 | Fast Gate Valve | 0.000 m | |
STXY1 | X-Y steerers 1 | want to locate before Q1! | |
Q1 | First Quad | 0.195 m | (was moved from 0.175 to 0.195) |
Q2 | Second Quad | 0.435 m | (was moved from 0.425 to 0.435) (24 cm to Q1) |
Q3 | Third Quad | 0.675 m | (24 cm to Q2) |
STXY2 | X-Y steerers 2 | ||
Targ1 | positron production target | 1.175 m | |
Q4 | Fourth Quad | 1.635 m | (was 1.4 now 1.635) |
Q5 | Fifth Quad | 1.659 m | was 1.650 drawing has 1.899 we want it at 1.659 (want distance to Q4 to be 24 cm) |
Q6 | Sixth Quad | 1.683 | was at 1.8 drawing has it at 2.163 we want it at 1.683 (want distance to Q5 to be 24 cm) |
STXY3 | X-Y steerers 3 | ||
F1 | OTR Flag | ||
FC1 | Faraday Cup 1 | ||
D1 | First Kiwi Dipole | 2.702 m | was 2.525 now it is 2.702 |
S1 | Energy Slits | 3.076 m | was 2.851 now at 3.076 |
STXY4 | X-Y steerers 4 | ||
Q7 | Seventh Quad | 3.317 m | was at 3.026 now at 3.317 |
F2 | Yag SCREEN | m | attach directly to Dipole D2 and put bellows upstream, drawing has it backwards |
D2 | Second Kiwi Dipole | 4.019 m | was at 3.617 now at 4.019 |
Q8 | Eigth Quad | 4.616 m | |
STXY5 | X-Y steerers 5 | ||
Q9 | Quad | 5.026 m | |
Q10 | Quad | 5.436 m | |
T2 | Torroid 2 | ||
F3 | Third Flag | 5.976 m | |
Targ2 | Brehm target ladder | m | |
HOLE@WALL | 6.412 m |