40MeV BeamLineInstall 10252013

From New IAC Wiki
Jump to navigation Jump to search

Beam Line Budget

3 week lead time on flanges

goal will be to run on Dec 2 or Dec 9.

Without 6 cross

Cost ($) Description
318 Bellows
158 Hardware (nuts & bolts)
290 5 rotatable flanges
335 non-rotatable flanges
329+282+141 7' + 6' + 3' SS pipe lengths
250 turning pipe on lathe
2400 2 days of labor building beam line components and 1 day installation

With 6 cross

Cost ($) Description
0 5 mil exit window
0 338 cube for 6 cross (2" pipe max diameter)
221 glass exit window for beam view screen
232 4 rotatable flanges
268 4 non-rotatable flanges
47 6 " SS beam pipe
800 1 day of labor building 6 way cross


Positrons_Using_40Mev_Linac#10.2F14.2F13