Uncategorized pages

Jump to navigation Jump to search

Showing below up to 500 results in range #21 to #520.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 05/10/2011
  2. 05/10/2011 source test continue
  3. 05/11/2011
  4. 05/11/2011 n's detector threshold calibration
  5. 05/11/2011 neutron detector threshold calibration
  6. 05/12/2011
  7. 05/12/2011 2n correlation test
  8. 05/12/2011 random coincidence cosmic test
  9. 05/13/2011 PS1 (Tiana) detector threshold calibration
  10. 05/13/2011 coincidence rate test (PS1+PS2 and PS1+PS2+Det1)
  11. 05/13/2011 coincidence test
  12. 05/13/2011 timing test
  13. 05/16/2011 coincidence test
  14. 05/19/2011 n's detector threshold calibration source/(w/source)
  15. 071213
  16. 08/21-22/13
  17. 09-07-2016
  18. 09-07-2017
  19. 09-08-2016
  20. 09-08-2017
  21. 09-09-2016
  22. 09-09-2017
  23. 09-10-2017
  24. 09-11-2017
  25. 09-14-2017
  26. 09-15-2017
  27. 09-16-2017
  28. 09-17-2017
  29. 09-18-2017
  30. 09/23-27/2013
  31. 09122012 JlabShipment
  32. 1-2-07 Tuning
  33. 1-8-08 PrelimResults
  34. 10-29-08 GEM HRRL Photon Runs
  35. 10-30-08 GEM HRRL Photon Runs
  36. 10-31-08 GEM HRRL Photon Runs
  37. 10/30/13 Mayir
  38. 1000 Events per degree in the range 5 to 40 degrees for Lab Frame
  39. 100mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  40. 100mA, 100ns pulse width, 25cm from beam pipe
  41. 10312013 TestRun
  42. 10mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  43. 11-10-2016
  44. 11-11-2016
  45. 11/21/2013 Be source
  46. 12-23-2016
  47. 12-GeV NSTAR
  48. 12/09/2013
  49. 12 10 2012 HRRL DetectorTests
  50. 137Cs Shot Log
  51. 170047 50% Se Soil Mixture Analysis
  52. 170048 10% Se Soil Mixture Analysis
  53. 170049 1% Se Soil Mixture Analysis
  54. 170050 0.1% Se Soil Mixture Analysis
  55. 1938:D2O Beam-down
  56. 1938:D2O Beam-down ND TOF
  57. 1938:D2O Beam-down ND TOF calibration
  58. 1938:D2O Beam-down ND energy
  59. 1938:D2O Beam-down ND energy neutronsOnly
  60. 1939:D2O Beam-down
  61. 1939:D2O Beam-down ND TOF
  62. 1939:D2O Beam-down ND TOF calibration
  63. 1939:D2O Beam-down ND energy
  64. 1939:D2O Beam-down ND energy neutronsOnly
  65. 1940:D2O Beam-down
  66. 1940:D2O Beam-down ND TOF
  67. 1940:D2O Beam-down ND TOF calibration
  68. 1940:D2O Beam-down ND energy
  69. 1940:D2O Beam-down ND energy neutronsOnly
  70. 1941:D2O Beam-up
  71. 1941:D2O Beam-up ND TOF
  72. 1941:D2O Beam-up ND TOF calibration
  73. 1941:D2O Beam-up ND energy
  74. 1941:D2O Beam-up ND energy neutronsOnly
  75. 1944:D2O Beam-down
  76. 1944:D2O Beam-down ND TOF
  77. 1944:D2O Beam-down ND TOF calibration
  78. 1944:D2O Beam-down ND energy
  79. 1944:D2O Beam-down ND energy neutronsOnly
  80. 1945:D2O Beam-up
  81. 1945:D2O Beam-up ND TOF
  82. 1945:D2O Beam-up ND TOF calibration
  83. 1945:D2O Beam-up ND energy
  84. 1945:D2O Beam-up ND energy neutronsOnly
  85. 1946:D2O Beam-up Rad-out
  86. 1946:D2O Beam-up Rad-out ND TOF
  87. 1946:D2O Beam-up Rad-out ND TOF calibration
  88. 1946:D2O Beam-up Rad-out ND energy
  89. 1946:D2O Beam-up Rad-out ND energy neutronsOnly
  90. 1947:H2O Beam-up
  91. 1947:H2O Beam-up ND TOF
  92. 1947:H2O Beam-up ND TOF calibration
  93. 1947:H2O Beam-up ND energy
  94. 1947:H2O Beam-up ND energy neutronsOnly
  95. 1948:H2O Beam-down
  96. 1948:H2O Beam-down ND TOF
  97. 1948:H2O Beam-down ND TOF calibration
  98. 1948:H2O Beam-down ND energy
  99. 1948:H2O Beam-down ND energy neutronsOnly
  100. 1949:DU
  101. 1949:DU ND TOF
  102. 1949:DU ND TOF calibration
  103. 1949:DU ND energy
  104. 1949:DU ND energy neutronsOnly
  105. 1 credit vs 9 credits
  106. 2-LTD-brick x-pinch driver
  107. 2-LTD-brick x-pinch driver notes
  108. 2-Neutron Correlation
  109. 2-Neutron Correlation Setup Stuff
  110. 2007 Interns
  111. 2007 Proposal
  112. 2008 NSF Proposal
  113. 2009
  114. 2010
  115. 20101019 BlackRockCanyon
  116. 2011
  117. 20110131 OxfordPeak
  118. 20110626 MirriamLakeIdaho
  119. 201109 R1ProgressRep
  120. 201110 R1ProgressRep
  121. 201111 R1ProgressRep
  122. 201112 R1ProgressRep
  123. 2011 44MeV Analysis 2011
  124. 2011 NSF Proposal
  125. 2012
  126. 201201 R1ProgressRep
  127. 201202 R1ProgressRep
  128. 201203 R1ProgressRep
  129. 201204 R1ProgressRep
  130. 201205 R1ProgressRep
  131. 201206 R1ProgressRep
  132. 201207 R1ProgressRep
  133. 201208 R1ProgressRep
  134. 201209 R1ProgressRep
  135. 201210 R1ProgressRep
  136. 201211 R1ProgressRep
  137. 201212 R1ProgressRep
  138. 2012AnnihCountrRateEstimate
  139. 2012 NSF Proposal
  140. 2012 run DAQ malfunction
  141. 201301 R1ProgressRep
  142. 201302 R1ProgressRep
  143. 201303 R1ProgressRep
  144. 201304 R1ProgressRep
  145. 201305 R1ProgressRep
  146. 201306 R1ProgressRep
  147. 201307 R1ProgressRep
  148. 201308 R1ProgressRep
  149. 201309 R1ProgressRep
  150. 201310 R1ProgressRep
  151. 201311 R1ProgressRep
  152. 201312 R1ProgressRep
  153. 2013 MRI CLAS12 LeveL2Trig
  154. 201401 R1ProgressRep
  155. 201402 R1ProgressRep
  156. 201403 R1ProgressRep
  157. 2015 NSF Proposal
  158. 2018 NSF Proposal
  159. 2020 NSF Proposal
  160. 20min run peak sensing histograms
  161. 252CF
  162. 25MeV Neutron Detector Set-up
  163. 25MeV Neutron Detector Setup
  164. 25mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  165. 25mA, 100ns pulse width, 25cm from beam pipe
  166. 25mA, 100ns pulse width, 50cm from beam pipe
  167. 25mA, 100ns pulse width, 50cm from beam pipe, tungsten target with aluminum beamstop
  168. 2D Faraday Cup Data Analysis
  169. 2NCorr E1 E2 correlations VS theta abs
  170. 2NCorr Forward Detectors
  171. 2NCorr Photon flux estimate
  172. 2NCorr Rates 2017
  173. 2NCorr SPDP Introduction
  174. 2NCorr SP DP analysis
  175. 2NCorr neutron ToF cut
  176. 2 Bricks Fabrication
  177. 2 LTD bricks driver progress
  178. 2cm XLineTarg 270 Degree Rotation 09/23/16
  179. 2cm XLineTarg 90 Degree Rotation 09/23/16
  180. 2cm XYTarg Z=0 Vx and Vy Differences 09/23/16
  181. 2cm XZTarg Y=0 Vx and Vz Differences 09/23/16
  182. 2cm YLineTarg 0 Degree Rotation 09/23/16
  183. 2cm YLineTarg 180 Degree Rotation 09/23/16
  184. 2cm YLineTarg 210 Degree Rotation 09/23/16
  185. 2cm YLineTarg 30 Degree Rotation 09/23/16
  186. 2cm YZTarg X=0 Vz and Vy Difference 09/23/16
  187. 2nCor 44
  188. 2nCor Equipment
  189. 2n ASCII files
  190. 2n BKG data
  191. 2n Corr JeffsPlots
  192. 2n D2O/H2O/Empty target data
  193. 2n DU data
  194. 2n Detector efficiency test
  195. 2n Equipment
  196. 2n Neutron signal attenuation
  197. 2n Position resolution
  198. 2n TDC map
  199. 2n corr theta VS n-n energies
  200. 2n corr theta VS n-n energies (1)
  201. 2n corr theta VS n-n energies (2)
  202. 2n corr theta VS n-n energies (3)
  203. 2n corr theta VS n-n energies (4)
  204. 2n correlations
  205. 2n correlations in Photofission
  206. 2n geometry of the setup
  207. 2n opening angle
  208. 2n preliminary data analysis
  209. 2n run list
  210. 3N Corr
  211. 4-gradient
  212. 4-momenta
  213. 4-vectors
  214. 40MeV BeamLineInstall 10252013
  215. 44 Linac Exit Geometry
  216. 44 MeV Beam Line Optimization
  217. 44 Setup
  218. 5-19-08
  219. 511 keV photon attenuation in tungsten
  220. 5252017 Anal
  221. 52x48 Steel Table
  222. 5mA, 100ns pulse width, 100cm from beam pipe with Titanium window
  223. 6cm ZLineTarg 0 Degree Rotation 09/23/16
  224. 6cm ZLineTarg 270 Degree Rotation 09/23/16
  225. 6cm ZLineTarg 90 Degree Rotation 09/23/16
  226. 8-07-2017
  227. 8-08-2017
  228. 8-09-2017
  229. 8-10-2017
  230. 8-11-2017
  231. 8-14-2017
  232. 8-15-2017
  233. 8-16-2017
  234. 8-18-2017
  235. 8 Channel CFD
  236. 90 degree beamline extension
  237. ACCAPP 09 PhotFis Poster
  238. ADBcrate CLAS12
  239. ADC
  240. ADC 3 Histogram Table
  241. ADC 7 Histogram Table
  242. ADS
  243. ASCII data files
  244. AW ADC 3 Histogram
  245. AW ADC 7 Histogram
  246. AW CLAS12R1
  247. AW Singles Prob Y88 2015
  248. A W CAA apparatus
  249. A W thesis
  250. A W thesis old
  251. A kind of analysis
  252. Absorbed Dose Information
  253. Abstract
  254. AccApp07
  255. Accelerator-Driven System
  256. Accelerator Driven Nuclear Reactor
  257. Accelerators Physics
  258. Accelerators Physics. Dr Kim Fall 2010
  259. Actinium Production
  260. Adding Apache Shares
  261. Admin Server
  262. Airline internet booking
  263. Airport Network Infrastructure
  264. Aka kaka
  265. Al subtracted ToF/Energy specrta
  266. All 3 detectors working
  267. All D2O Beam-down
  268. All D2O Beam-up
  269. Alpha Ionization
  270. Alpha particle simulation related
  271. Alter Phi Angles
  272. Altering Phi Angles
  273. Aluminum Converter
  274. Amex Promotion
  275. Analysis
  276. Analysis.groovy
  277. Analysis 03-26-2015
  278. Analysis of evio files
  279. Analysis of may 2017 runs
  280. Analysis scripts
  281. Angular distribution of neutrons from the photodisintegration of deuterium
  282. Anisotropic n's vs. isotropic ones
  283. Apartment
  284. Apex
  285. Api PubCLAS2000
  286. Apparatus Layout
  287. Apply, due: Jan 15 2014
  288. April
  289. April: Threshold Study
  290. April 17th 2017
  291. April 17th 2017 (PAA)
  292. Apt-Proxy
  293. ArCO2 IonizationPhysics
  294. Attenuation Measurements
  295. Attenuation Measurements NaI
  296. Au-196 5-08-22-13
  297. Au-196 Foil-08-22-13
  298. Aug 2017 ChkList
  299. August 10th 2017
  300. August 11th 2017
  301. August 14, 2007 - Cosmic Telescope
  302. August 14th 2017
  303. August 15, 2007 - Cosmic Telescope
  304. August 15th 2017
  305. August 16, 2007 - Cosmic Telescope
  306. August 17, 2007 - Cosmic Telescope
  307. August 23, 2007 - Cosmic Telescope
  308. August 24, 2007 - Cosmic Telescope
  309. August 27, 2007 - Cosmic Telescope
  310. August 28, 2007 - Cosmic Telescope
  311. August 29, 2007 - Cosmic Telescope
  312. August 30, 2007 - Cosmic Telescope
  313. August 31, 2007 - Cosmic Telescope
  314. August 8th 2017
  315. August 9th 2017
  316. B-field calculation
  317. BO-08-22-13
  318. BUILD GEMC SIMULATION.sh
  319. Back of the envelope calculation for e+/e- ratio
  320. Background
  321. BackupPC Notes
  322. Bayesian Nonparametrics
  323. BeamPipeHeating 4mmthick PbBi PositronTarget
  324. Beam Position Monitor Tests in HRRL
  325. Beam Test Apr 24 2012
  326. Beam Test Apr 26 2012
  327. Beam Test Jul 11 2012
  328. Beam Test Jul 12 2012
  329. Beam Test Jul 16 2012
  330. Beam Test Jul 17 2012
  331. Beam Test Jul 18 2012
  332. Beam Test Jul 19 2012
  333. Beam Test Jul 20 2012
  334. Beam Test Jul 23 2012
  335. Beam Test Jul 24 2012
  336. Beam Test Jul 25 2012
  337. Beam Test Jul 26 2012
  338. Beam Test Jul 27 2012
  339. Beam Test Jul 5 2012
  340. Beam Text May 17 2012
  341. Beam dump and sweep magnet G4 model
  342. Beam spot with a fancy Dan's screen
  343. Beamline Drawing 2011 J.Ellis
  344. Beamline Parts
  345. Beamline design (G. Stancari)
  346. Beamline design (Y. Kim)
  347. Beamline design drawing
  348. Benchmark GEMC Occupancy Prediction for 11GeV Electron Beam with 0T Solenoid for LH2
  349. Beta Transmission and Ionization
  350. BeulaLakeWY
  351. Bibliography
  352. Big Red
  353. Bin Shapes
  354. Bin Test
  355. Boise
  356. Books
  357. BoratedAluminum
  358. BoreShield
  359. Breakout Board Design
  360. Brem converter optimization
  361. Brems
  362. Brems Intensity Spectrum (with Collimation Factors) Plots
  363. Brems Intensity Spectrum (without Collimation Factors) Plots
  364. Bremsstrahlung lineshape for E0 = 16 MeV, Ti radiator
  365. Bremsstrahlung radiation properties, Ee=25 MeV
  366. BrianMuchilwa HW12
  367. Brian Articles
  368. Brian ToDo
  369. Brian mingw
  370. BriansRanLogbook
  371. Bubbl, Online Flowchart Too
  372. Bubbl, Online Flowchart Tool
  373. Bull
  374. Burg jeff E1 E2.py
  375. C++
  376. C-19
  377. CAA NaI HpGe CoinSetup
  378. CAD Components
  379. CAEN QDC V792
  380. CAEN TDC V 775
  381. CAEN V1290A TDC
  382. CAEN V1495 ADC
  383. CAEN V1495 IO
  384. CAEN V260 Scalr
  385. CAEN V488 TDC
  386. CAEN V775 TDC
  387. CAEN V785N ADC
  388. CAEN V792 ADC
  389. CAEN VX1190A TDC
  390. CAPSDAQ
  391. CED Verification of DC Angle Theta and Wire Correspondance
  392. CHIPS
  393. CHIPS IAC Run 5-27-08
  394. CHIPS IAC Run 5-28-08
  395. CHIPS IAC Run 5-29-08
  396. CHIPS IAC Run 5-30-08
  397. CHIPS Run Feb-2008
  398. CHIPS Run May-2008
  399. CHIPS collaboration
  400. CH 3D Printing
  401. CH 785NADC
  402. CH Calibration Sources
  403. CH Cf252 Sources
  404. CH Clean Room Renovations
  405. CH Code Repository
  406. CH DAQ2 Energy Calibration
  407. CH DD Ga
  408. CH Discriminator Dual Pulsing
  409. CH Gd Holders
  410. CH Gd Spectra
  411. CH HPGe Detector
  412. CH HPGe Efficiency
  413. CH HPGe Electronics Chain
  414. CH HPGe Log
  415. CH HPGe Work
  416. CH He3 Attenuation Measurements
  417. CH He3 Attenuation Measurements: 3 Different Cf252 Sources
  418. CH He3 Attenuation Measurements Repeated
  419. CH He3 Attenuation Measurements Revisited
  420. CH He3 Background Measurements
  421. CH He3 Pre-amp Noise Investigation
  422. CH He3 w/BorAl Gd In/Out
  423. CH High Activity Cf252
  424. CH Isotope Table
  425. CH Low Activity Cf252
  426. CH Meeting Notes
  427. CH NIM Bin Repair
  428. CH Outline
  429. CH PAS HPGe Amp Adjustment
  430. CH PAS He3 BorAl Attenuation Study
  431. CH PAS He3 Poly Boration Study
  432. CH PAS Master Logbook
  433. CH PAS Master Timeline
  434. CH PhD
  435. CH Phase II Run Plan
  436. CH Physics Questions
  437. CH Poly Density
  438. CH Preliminary Examination
  439. CH ROOT Nonuniform Binning
  440. CH Starting CODA & Reading CODA Data
  441. CH Task List
  442. CH Thesis
  443. CH Thesis Revision 1
  444. CH UNCL
  445. CH Weekly Reports
  446. CI Model 1416 Amplifier
  447. CLARA
  448. CLAS12DC ProjFactoids
  449. CLAS12R1ReadinessReview2011
  450. CLAS12R1 CosmicTestStand
  451. CLAS12R1 WireQualPic
  452. CLAS12 CleaRoomPrep 2011
  453. CLAS12 FastMC
  454. CLAS12 GEMC
  455. CLAS12 InclusiveRateEst4EG12
  456. CLAS12 MollerDataTable 12-16-2018
  457. CLAS12 R1
  458. CLAS12 R1 Progress Reports
  459. CLAS12 R1 Prototype 2-20-08
  460. CLAS12 R1 Prototype 9-16-07
  461. CLAS12 R1 S1 QA
  462. CLAS12 R1 S2 PrePotTensErr
  463. CLAS12 R1 S2 QA
  464. CLAS12 R1 S3 PrePotTensErr
  465. CLAS12 R1 S3 QA
  466. CLAS12 R1 S5 QA
  467. CLAS12 R1 S6 QA
  468. CLAS12 R1 SOW
  469. CLAS12 R1 Stringing Manual
  470. CLAS12 RateEst byWA
  471. CLAS12 SIDISpionRateEst4EG12
  472. CLAS12 Software
  473. CLAS12 r4135
  474. CLAS12 r4136
  475. CLAS12 r4139
  476. CLAS12 r4141
  477. CLAS6 Software
  478. CLAS CED
  479. CLAS apparatus
  480. CMsg
  481. CODA
  482. CODA REMEX
  483. CPAA DNDO NSF ARi-2013
  484. CPAA r5691-5693
  485. CZT gamma spec
  486. C 20
  487. C program for neutron efficiency
  488. CaGaS Phase I
  489. CaGaS Phase II
  490. CaGaS Phase II Physical Parameters
  491. CaGaS Phase I Cadmium
  492. CaGaS Phase I Expansion
  493. CaGaS Phase I Gadolinium
  494. CadBeamline
  495. Caen775Lib.c Code
  496. Calculating the differential cross-sections for the different materials, and placing them as well as the theoretical differential cross-section into a plot:
  497. Calculation of radiation yield
  498. Calculations of 4-momentum components
  499. Calgary, Canada
  500. Calibrating GEM detector

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)