Oldest pages
Jump to navigation
Jump to search
Showing below up to 500 results in range #1 to #500.
View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)
- Simulation of Particle Interactions with Matter (16:40, 7 June 2007)
- June, 6, 2007 Scintillator Signals from source (17:01, 7 June 2007)
- Fission Fragment (22:42, 7 June 2007)
- Taking Scope Pictures (23:02, 8 June 2007)
- Fission Chamber (21:45, 15 June 2007)
- June, 11, 2007 Cosmic Ray measurements using HpGe Detector (22:09, 19 June 2007)
- June, 18, 2007 Background measurements using HpGe detector (00:22, 20 June 2007)
- June 15,2007 Cf-252 measurements with HpGe & neutron sensitive scintillators in coincidence (19:22, 20 June 2007)
- June,18,2007 Teachers in lab (02:09, 22 June 2007)
- List of Programs IAC is liscensed to Use (18:52, 22 June 2007)
- June, 21, Cosmic background BC408 on top of HpGe (01:10, 24 June 2007)
- Scan Mode (01:55, 28 June 2007)
- June, 7, 2007 Cf rate measurements using Photonics PMT (18:49, 29 June 2007)
- Results and Discussion (21:42, 5 July 2007)
- Jule 3,2007 Cf-252 without lead container measurements with HpGe & fast plastic scintillators in coincidence (16:57, 6 July 2007)
- HS Interns (21:49, 6 July 2007)
- July, 6, 2007 Investigations of Geometry Influence on the Fission Fragments Behaviour (00:13, 9 July 2007)
- Spectra of neutrons and gamma-rays from Cf-252 source (16:56, 15 July 2007)
- Background (23:15, 16 July 2007)
- Nerd Group Meeting (22:41, 18 July 2007)
- Neutron Electric Form Factor (23:15, 19 July 2007)
- 2007 Interns (20:32, 20 July 2007)
- ReadoutBoardGerberFiles (17:53, 21 July 2007)
- July 6, 2007 Neutron Capture in lead (14:20, 26 July 2007)
- Origin licensing (22:28, 26 July 2007)
- NWChem (18:55, 27 July 2007)
- Qweak GEANT3 Monte Carlo (14:51, 13 August 2007)
- Cosmic Ray Tests (20:57, 14 August 2007)
- Qual Problems (22:13, 14 August 2007)
- Quantum Qual Problems (21:13, 17 August 2007)
- Qal QuantP1S (03:50, 19 August 2007)
- August 14, 2007 - Cosmic Telescope (20:20, 19 August 2007)
- Lecroy Quad discriminator Model 821 (21:49, 20 August 2007)
- CAEN TDC V 775 (21:05, 21 August 2007)
- Mechanics Qual Problems (20:46, 22 August 2007)
- E & M Qual Problems (20:58, 22 August 2007)
- August 15, 2007 - Cosmic Telescope (19:55, 23 August 2007)
- August 16, 2007 - Cosmic Telescope (20:29, 23 August 2007)
- August 23, 2007 - Cosmic Telescope (00:04, 25 August 2007)
- August 24, 2007 - Cosmic Telescope (00:18, 25 August 2007)
- AccApp07 (18:28, 30 August 2007)
- CHIPS (18:28, 4 September 2007)
- The Cebaf High Intensity Positron Source (Chips) (18:30, 4 September 2007)
- August 30, 2007 - Cosmic Telescope (22:15, 4 September 2007)
- CI Model 1416 Amplifier (21:31, 6 September 2007)
- Ortec Amplifier Model 485 (21:39, 6 September 2007)
- Ortec Quad Fast Amp Model 535 (21:39, 6 September 2007)
- PAD Model 814A Amplifier (21:43, 6 September 2007)
- Taget3001 GerberFileProblem (17:27, 10 September 2007)
- August 27, 2007 - Cosmic Telescope (20:04, 12 September 2007)
- August 28, 2007 - Cosmic Telescope (20:04, 12 September 2007)
- August 29, 2007 - Cosmic Telescope (20:04, 12 September 2007)
- August 31, 2007 - Cosmic Telescope (20:04, 12 September 2007)
- September 6, 2007 - Cosmic Telescope (20:06, 12 September 2007)
- CLAS12 R1 Prototype 9-16-07 (21:23, 16 September 2007)
- I2C expander chip (21:32, 18 September 2007)
- September 4, 2007 - Cosmic Telescope (21:42, 19 September 2007)
- September 7, 2007 - Cosmic Telescope (21:45, 19 September 2007)
- September 5, 2007 - Cosmic Telescope (20:50, 20 September 2007)
- Statistics for Experimenters (21:26, 20 September 2007)
- References (15:57, 26 September 2007)
- CLAS CED (18:15, 26 September 2007)
- Qweak GEANT 4 Monte Carlo (17:19, 28 September 2007)
- ForestLinuxPenDrives (16:41, 10 October 2007)
- October 6, 2007 - Cosmic Telescope (20:34, 10 October 2007)
- October 7, 2007 - Cosmic Telescope (20:34, 10 October 2007)
- Thresholding of Paddles (21:14, 10 October 2007)
- September 29, 2007 - Cosmic Telescope (21:23, 11 October 2007)
- October 1, 2007 - Cosmic Telescope (21:29, 11 October 2007)
- October 4, 2007 - Cosmic Telescope (21:37, 12 October 2007)
- August 17, 2007 - Cosmic Telescope (20:00, 16 October 2007)
- Scintillators (21:20, 16 October 2007)
- PVC pipe (21:20, 16 October 2007)
- Quad Linear Fan In-Fan Out module (21:35, 16 October 2007)
- Quad Discriminator (21:36, 16 October 2007)
- Logic Unit (21:37, 16 October 2007)
- Constant Franction Disc. (21:37, 16 October 2007)
- Counter (21:38, 16 October 2007)
- Singles Counter. (21:41, 16 October 2007)
- Coincidence Counter. (21:41, 16 October 2007)
- Other Images of the apparatus and equipment (21:42, 16 October 2007)
- High Voltage Units (21:44, 16 October 2007)
- Nim bin (21:45, 16 October 2007)
- MiniDC PreampOutput 10 10 07 (04:59, 17 October 2007)
- Data of Thresholding of Paddles (20:18, 17 October 2007)
- October 11, 2007 - Cosmic Telescope2 (20:37, 17 October 2007)
- Description of Fission chamber (23:07, 18 October 2007)
- Energy spectra (fiss frag) (23:12, 18 October 2007)
- June 19,2007 Cf-252 measurements with HpGe & neutron sensitive scintillators in coincidence (00:45, 23 October 2007)
- June 19,2007 Cf-252 measurements of gamma-spectrum using HpGe ungated (00:46, 23 October 2007)
- June 19, gamma-singles spectra of a Cf-252 source (00:47, 23 October 2007)
- June 25,2007 Cf-252 measurements of gamma-spectrum using HpGe ungated (00:48, 23 October 2007)
- June 25,2007 Cf-252 measurements of total gamma-spectrum using HpGe ungated (00:50, 23 October 2007)
- June 27,2007 Cf-252 measurements with HpGe detector and BC408 (00:50, 23 October 2007)
- July 3,2007 Cf-252 without lead container measurements with HpGe & fast plastic scintillators in coincidence (00:51, 23 October 2007)
- July 10, 2007 Division of gated to ungated spectra of Cf-252 (00:53, 23 October 2007)
- July 11, 2007 Experimental setup (00:54, 23 October 2007)
- MiniDC Signals 10-0-07 (19:50, 23 October 2007)
- MINIDC MinVoltageStudy (15:43, 24 October 2007)
- September 10, 2007 - Cosmic Telescope (20:04, 25 October 2007)
- September 11, 2007 - Cosmic Telescope (20:06, 25 October 2007)
- September 12, 2007 - Cosmic Telescope (20:07, 25 October 2007)
- September 13, 2007 - Cosmic Telescope (20:07, 25 October 2007)
- September 14, 2007 - Cosmic Telescope (20:08, 25 October 2007)
- September 17, 2007 - Cosmic Telescope (20:09, 25 October 2007)
- September 18, 2007 - Cosmic Telescope (20:09, 25 October 2007)
- September 19, 2007 - Cosmic Telescope (21:04, 25 October 2007)
- September 20, 2007 - Cosmic Telescope (21:06, 25 October 2007)
- September 21, 2007 - Cosmic Telescope (21:07, 25 October 2007)
- September 24, 2007 - Cosmic Telescope (21:08, 25 October 2007)
- September 26, 2007 - Cosmic Telescope (21:09, 25 October 2007)
- September 27, 2007 - Cosmic Telescope (21:10, 25 October 2007)
- September 28, 2007 - Cosmic Telescope (21:10, 25 October 2007)
- October 2, 2007 - Cosmic Telescope (21:18, 25 October 2007)
- October 3, 2007 - Cosmic Telescope (21:19, 25 October 2007)
- October 5, 2007 - Cosmic Telescope (21:21, 25 October 2007)
- October 8, 2007 - Cosmic Telescope (21:22, 25 October 2007)
- October 9, 2007 - Cosmic Telescope (21:22, 25 October 2007)
- October 11, 2007 - Cosmic Telescope (21:48, 25 October 2007)
- October 12, 2007 - Cosmic Telescope (21:48, 25 October 2007)
- October 15, 2007 - Cosmic Telescope (21:49, 25 October 2007)
- October 16, 2007 - Cosmic Telescope (21:50, 25 October 2007)
- October 17, 2007 - Cosmic Telescope (21:59, 25 October 2007)
- October 18, 2007 - Cosmic Telescope (20:12, 26 October 2007)
- October 23, 2007 - Cosmic Telescope (19:49, 29 October 2007)
- October 24, 2007 - Cosmic Telescope (20:02, 29 October 2007)
- October 25, 2007 - Cosmic Telescope (20:20, 29 October 2007)
- October 26, 2007 - Cosmic Telescope (20:29, 29 October 2007)
- October 19, 2007 - Cosmic Telescope (20:59, 29 October 2007)
- October 22, 2007 - Cosmic Telescope (22:44, 6 November 2007)
- October 10, 2007 - Cosmic Telescope (22:47, 6 November 2007)
- October 31, 2007 - Cosmic Telescope (22:59, 7 November 2007)
- Minicom (21:26, 9 November 2007)
- Spi bus (07:36, 20 November 2007)
- November 4, 2007 - Cosmic Telescope (21:07, 27 November 2007)
- November 7, 2007 - Cosmic Telescope (21:08, 27 November 2007)
- November 6, 2007 - Cosmic Telescope (21:09, 27 November 2007)
- November 13, 2007 - Cosmic Telescope (21:10, 27 November 2007)
- November 14, 2007 - Cosmic Telescope (21:10, 27 November 2007)
- November 19, 2007 - Cosmic Telescope (21:10, 27 November 2007)
- September 25, 2007 - Cosmic Telescope (21:29, 27 November 2007)
- 8 Channel CFD (22:12, 27 November 2007)
- CAEN QDC V792 (22:13, 27 November 2007)
- November 1, 2007 - Cosmic Telescope (22:33, 27 November 2007)
- November 2, 2007 - Cosmic Telescope (23:02, 27 November 2007)
- November 20, 2007 - Cosmic Telescope (21:35, 30 November 2007)
- ROOT 4 DataMonitoring (00:23, 2 December 2007)
- PbF2 CrystalNumber55 (19:55, 2 December 2007)
- PbF2 CrystalNumber69 (19:55, 2 December 2007)
- PbF2 CrystalNumber87 (19:56, 2 December 2007)
- PbF2 CrystalNumber120R7 (19:56, 2 December 2007)
- November 5, 2007 - Cosmic Telescope (20:41, 3 December 2007)
- November 15, 2007 - Cosmic Telescope (20:51, 3 December 2007)
- November 16, 2007 - Cosmic Telescope (20:56, 3 December 2007)
- Sample data table (21:00, 3 December 2007)
- PbF2pierrebertin (22:07, 3 December 2007)
- Original Links to Days (22:19, 4 December 2007)
- Cosmic Telescope Logbook (22:24, 4 December 2007)
- November 8, 2007 - Cosmic Telescope (22:29, 4 December 2007)
- November 9, 2007 - Cosmic Telescope (22:30, 4 December 2007)
- November 12, 2007 - Cosmic Telescope (22:30, 4 December 2007)
- PbFl RadTests-12-3-07 (17:25, 5 December 2007)
- PbF2 CrystalNumber39 (19:55, 5 December 2007)
- PbF2 CrystalNumber18 (22:39, 5 December 2007)
- PbF2 CrystalNumber33 (23:59, 5 December 2007)
- PbFl RadTests-12-4-07 (01:42, 7 December 2007)
- PbFl RadTests-12-5-07 (01:43, 7 December 2007)
- PbF2 CrystalNumber16 (01:44, 7 December 2007)
- Rotator (16:26, 11 December 2007)
- MiniPrototype CAEN V792 Calibration (16:55, 20 December 2007)
- Metalica TestPulseoutput 12-20-07 (17:27, 21 December 2007)
- Metalica TestPulseoutput 12-21-07 (00:02, 22 December 2007)
- RUN (22:40, 22 December 2007)
- Run (00:06, 23 December 2007)
- RUN 53 (00:40, 23 December 2007)
- RUN 54 (01:23, 23 December 2007)
- RUN 55 (17:27, 24 December 2007)
- BrianMuchilwa HW12 (17:39, 24 December 2007)
- RUN 56 (17:59, 24 December 2007)
- RUN 57 (18:41, 24 December 2007)
- Reading CODA data (21:03, 31 December 2007)
- 1-2-07 Tuning (22:24, 3 January 2008)
- Experimental Cell Electron Beam (18:10, 5 January 2008)
- Run Plan (20:06, 5 January 2008)
- IAC 1-7-08 (02:20, 8 January 2008)
- 1-8-08 PrelimResults (05:11, 10 January 2008)
- RUN 58 (18:13, 13 January 2008)
- RUN 60 (19:14, 13 January 2008)
- RUN 61 (20:02, 13 January 2008)
- RUN 62 (23:53, 13 January 2008)
- Timing spectra (00:02, 14 January 2008)
- RUN 63 (00:10, 14 January 2008)
- Collimator (16:36, 14 January 2008)
- Syllabus (18:00, 18 January 2008)
- Quad3A (22:14, 24 January 2008)
- Q1A (00:48, 26 January 2008)
- Q1C (00:48, 26 January 2008)
- Q1B (00:50, 26 January 2008)
- IAC 1-8-08 (01:49, 3 February 2008)
- IAC 1-4-08 (16:45, 18 February 2008)
- IAC 2-28-08 (15:17, 29 February 2008)
- CLAS12 R1 Prototype 2-20-08 (23:11, 3 March 2008)
- ForestSolarCells (22:35, 9 March 2008)
- CHIPS Run Feb-2008 (20:29, 5 April 2008)
- IAC Network Configurations (07:10, 9 April 2008)
- Detector description (20:55, 17 April 2008)
- Group Meetings (16:48, 18 April 2008)
- MiniDC Signals 4-22-08 (17:33, 24 April 2008)
- Goals (19:57, 24 April 2008)
- MiniDC Signals 4-25-08 (20:33, 25 April 2008)
- K 4-25-08 (21:25, 25 April 2008)
- Remaining pictures of Case 5 (21:45, 25 April 2008)
- Remaining pictures of Case 4 (21:45, 25 April 2008)
- Remaining pictures of Case 3 (21:46, 25 April 2008)
- Remaining pictures of Case 2 (21:46, 25 April 2008)
- Remaining pictures of Case 1 (21:47, 25 April 2008)
- IAC 2-29-08 (13:37, 29 April 2008)
- Spontaneous fission rate for sample of U-235 (1mg/cm^2) (15:37, 30 April 2008)
- MiniPrototype CosmicRuns (04:48, 1 May 2008)
- Fission Fragment Tests (19:10, 5 May 2008)
- Photon yield (19:11, 8 May 2008)
- R3DC Report 2-08 (11:10, 9 May 2008)
- Calculation of radiation yield (16:14, 10 May 2008)
- C program for neutron efficiency (16:58, 13 May 2008)
- Kalyan 23 may 08 (22:08, 16 May 2008)
- Kalyan 16 may 08 (22:17, 16 May 2008)
- Kalyan 23 May 08 (10:23, 20 May 2008)
- Kalyan 23 May 08 2.1 (10:49, 20 May 2008)
- Kalyan 23 May 08 2.2 (10:59, 20 May 2008)
- Kalyan 23 May 08 2.3 (16:50, 20 May 2008)
- CHIPS IAC Run 5-27-08 (11:12, 28 May 2008)
- Kalyan 30 May 08 (05:50, 30 May 2008)
- CHIPS IAC Run 5-29-08 (15:11, 30 May 2008)
- HRRL/Egamma (16:21, 4 June 2008)
- Eγ vs probability of D20 (11:24, 5 June 2008)
- HRRL/EgammaVsD20Probability5cm (11:37, 5 June 2008)
- Mylar Linear Small Deflection (12:04, 9 June 2008)
- Large Deflection Membrane Stiffened Static Analysis (12:22, 9 June 2008)
- Normal and Membrane Stresses approach (12:42, 9 June 2008)
- Normal and Membrane Stress approach (12:43, 9 June 2008)
- Forest IonizationChambers (18:50, 9 June 2008)
- Deformation with both Normal and Membrane Stress approach (19:32, 9 June 2008)
- HRRL/RadiatorLocation (12:50, 10 June 2008)
- VFAT powered on and responding to I2C (12:25, 8 July 2008)
- CHIPS IAC Run 5-28-08 (17:22, 9 July 2008)
- Interim Report 5-18-08 AwardNum0653570 (11:46, 14 July 2008)
- Kalyan 4-25-08 (09:36, 17 July 2008)
- MiniPrototype CoincidenceCosmicRuns 2008 (01:26, 19 July 2008)
- Radiator foil link (09:32, 23 July 2008)
- Qweak Chamber machining (17:55, 28 July 2008)
- REU Projects (19:24, 4 August 2008)
- Phi angle in CM frame for different runs (14:21, 13 August 2008)
- Experimental setup (10:38, 25 August 2008)
- Software (14:55, 31 August 2008)
- Quality Checks (10:58, 19 September 2008)
- Verifying Neutron Detection (15:11, 19 September 2008)
- Forest NSF BioSketch (11:43, 20 September 2008)
- NSF Proposal 2007 AwardNum0653570 (16:29, 20 September 2008)
- Forest Water Consumption (20:19, 12 October 2008)
- DDP:Detailed Design Phase: Drawing and Assembly Package (08:48, 14 October 2008)
- PFD:Production of Fabrication Drawings (14:36, 16 October 2008)
- Progress reports (23:26, 25 October 2008)
- MiniPrototype SinglesCosmicRuns 2008 (00:44, 26 October 2008)
- Greatfit.m (Matlab program fot fitting) (04:53, 30 October 2008)
- 10-29-08 GEM HRRL Photon Runs (22:29, 30 October 2008)
- 10-30-08 GEM HRRL Photon Runs (23:04, 30 October 2008)
- Cross Sections of Pb,Si,N,O (08:50, 1 November 2008)
- Transition Form Factors (18:03, 5 November 2008)
- DOE 2008 Proposal (23:20, 8 November 2008)
- Qweak PAC2008 Writeup (15:46, 11 November 2008)
- Qweak Related documents (15:48, 11 November 2008)
- Theory Input (18:28, 15 November 2008)
- Papers (18:34, 15 November 2008)
- Talks (22:51, 15 November 2008)
- Lang (03:27, 1 December 2008)
- Ruskim (08:30, 3 December 2008)
- Figures (00:33, 4 December 2008)
- Doppler Broadening (07:48, 7 December 2008)
- 10-31-08 GEM HRRL Photon Runs (07:52, 7 December 2008)
- GEM HRRL Photons (07:57, 7 December 2008)
- 12-GeV NSTAR (00:26, 13 December 2008)
- New Proposal (03:24, 15 December 2008)
- MiniPrototype Operation Regions 2008 (23:34, 16 December 2008)
- GEM Cosmic V792 Measurements (03:11, 19 December 2008)
- Plagiarism (23:13, 25 December 2008)
- October Fission HRRL Measurements 2008 (04:07, 9 January 2009)
- Analysis (18:49, 13 January 2009)
- LCS Experiment.C (23:34, 14 January 2009)
- Caen775Lib.c Code (18:32, 16 January 2009)
- CAEN V1495 ADC (18:53, 16 January 2009)
- NucPhys I Syllabus (16:55, 21 January 2009)
- Gasket Design (15:32, 22 January 2009)
- TF Management (04:08, 26 January 2009)
- Detector.pdf (23:45, 27 January 2009)
- PLX (21:11, 28 January 2009)
- Gumstix Crapola (06:04, 5 February 2009)
- Plot (06:17, 5 February 2009)
- B-field calculation (06:17, 5 February 2009)
- TDC Calibration (06:18, 5 February 2009)
- Conversion TDC to Energy (06:18, 5 February 2009)
- Peaks fitting (06:19, 5 February 2009)
- PhotoFis.C (ROOT program to analyse data) (06:22, 5 February 2009)
- Neutron Time of Flight Test (06:22, 5 February 2009)
- Cosmic Ray Shielding Test (06:22, 5 February 2009)
- Matching Detectors (06:23, 5 February 2009)
- Current Conceptual Design of Beamline (06:23, 5 February 2009)
- Notes from July 22nd, 2008 Meeting (06:24, 5 February 2009)
- Magnet Calculations (06:25, 5 February 2009)
- Constant Fraction Discriminator Details (06:25, 5 February 2009)
- Compton Scattering (06:25, 5 February 2009)
- Electronics We Need to Collect (06:25, 5 February 2009)
- Finding the Space Between Lead Shots (06:26, 5 February 2009)
- Column of Water Length (06:26, 5 February 2009)
- Notes for the July 11th, 2008 Meeting (06:26, 5 February 2009)
- Brems Intensity Spectrum (without Collimation Factors) Plots (06:26, 5 February 2009)
- Brems Intensity Spectrum (with Collimation Factors) Plots (06:26, 5 February 2009)
- Notes from July 2nd, 2008 Meeting (06:26, 5 February 2009)
- Things That Still Need to Get Done (06:27, 5 February 2009)
- Where does the radiator need to be? (06:27, 5 February 2009)
- Thickness of Lead to block photons (06:27, 5 February 2009)
- Using Carbon or Aluminum to block photons (06:28, 5 February 2009)
- Radiator Foil (06:28, 5 February 2009)
- PhotoFissionOctoberAnalysis (06:29, 5 February 2009)
- October 22, 2008 (06:30, 5 February 2009)
- October 20, 2008 (06:30, 5 February 2009)
- Uranium target test (06:30, 5 February 2009)
- October 17, 2008 (06:31, 5 February 2009)
- October 16, 2008 (06:31, 5 February 2009)
- October 15, 2008 (06:31, 5 February 2009)
- All 3 detectors working (06:32, 5 February 2009)
- Faraday Cup Current and Gamma from NaI detector (06:32, 5 February 2009)
- October 14, 2008 Double peak problem (06:32, 5 February 2009)
- October 10, 2008 Run-day one (06:32, 5 February 2009)
- Apparatus Layout (06:33, 5 February 2009)
- HRRL room dimensions (06:33, 5 February 2009)
- HRRL Simulations (06:34, 5 February 2009)
- Radiators Temperature (06:34, 5 February 2009)
- Detector Tests Using HRRL (06:36, 5 February 2009)
- Beam Position Monitor Tests in HRRL (06:36, 5 February 2009)
- 5-19-08 (06:36, 5 February 2009)
- HRRL OSA Docs (06:37, 5 February 2009)
- HRRL OSA SAMPLE (06:38, 5 February 2009)
- Plastic Scintillator Calculation (18:11, 5 February 2009)
- Qweak Chamber Assembly (08:57, 8 February 2009)
- Cross Sections of C,N,O,Si,Pb (00:06, 10 February 2009)
- Qweak Qsqrd Error Code 2Trackers (00:57, 14 February 2009)
- Radius of Curvature Calculation (08:57, 17 February 2009)
- ThoriumPlatingTGEMproposal (18:37, 20 February 2009)
- The Heavy Magnet (22:24, 26 February 2009)
- New Magnet (22:55, 26 February 2009)
- Coils (23:34, 26 February 2009)
- TF DestinationImagination (05:10, 4 March 2009)
- GEM preamp Design (05:11, 4 March 2009)
- I2C (17:08, 7 March 2009)
- LVDS (17:09, 7 March 2009)
- NEUP 2009 V1 (04:54, 11 March 2009)
- JLAB PLX LVDS (01:32, 18 March 2009)
- NucPhys I HomeworkProblems (17:48, 18 March 2009)
- HRRL Run 4-13-09 (20:44, 21 March 2009)
- Data bank (20:21, 27 March 2009)
- VFAT DefaultTestPattern 3-31-09 (22:56, 31 March 2009)
- SIS3600 Trigger Supervisor (16:48, 3 April 2009)
- Pictures of experimental setup (22:09, 3 April 2009)
- Electric QuadrupoleMoment Forest NuclPhys I (06:23, 7 April 2009)
- Quantum Mechanics Review Forest NucPhys I (03:20, 8 April 2009)
- NuclearProperties Forest NucPhys I (03:25, 8 April 2009)
- VFAT board mirror (05:05, 9 April 2009)
- CAPSDAQ (17:57, 12 April 2009)
- LDS shopping List (22:56, 17 April 2009)
- Forest ElemPhysics (04:48, 20 April 2009)
- Forest ElemPhysics Optics ThinFilms (05:36, 20 April 2009)
- Spectra (02:41, 21 April 2009)
- Tasks March 31, 2009 (00:12, 22 April 2009)
- NaI spectra (00:13, 22 April 2009)
- Spectra Analysis (03:22, 22 April 2009)
- Forest ElemPhysics Optics (03:45, 22 April 2009)
- Forest ElemPhysics Optics ThinLenses (05:49, 24 April 2009)
- Forest FermiGoldenRule Notes (21:14, 26 April 2009)
- Flux from NaI vs. Gamma Flash (21:45, 30 April 2009)
- Syed LCS G4ModelPaper (15:28, 1 May 2009)
- A kind of analysis (04:58, 10 May 2009)
- NuclearForce Forest NucPhys I (16:27, 11 May 2009)
- Old Breakout Board Design (22:29, 13 May 2009)
- Qweak V1495 FPGA Programming (17:04, 14 May 2009)
- WarrenParsensLogbook (19:11, 14 May 2009)
- IAC LeadFlourideCherenkovCrystalTests 5-09 (17:44, 15 May 2009)
- Big Red (21:20, 15 May 2009)
- Qweak TaskList (13:44, 18 May 2009)
- Qweak R1 Proj Management (13:56, 18 May 2009)
- Bremsstrahlung lineshape for E0 = 16 MeV, Ti radiator (17:04, 18 May 2009)
- Pair Spectrometer Calculations (16:14, 22 May 2009)
- New Magnets (16:23, 22 May 2009)
- Power Supply (16:35, 22 May 2009)
- Magnet (18:05, 22 May 2009)
- Specs (18:24, 22 May 2009)
- KiwiDipole (16:02, 26 May 2009)
- HPBv2 CoSn.eps (18:19, 26 May 2009)
- HPBv2 phase.eps (18:20, 26 May 2009)
- HPBv2 prof.eps (18:21, 26 May 2009)
- Forest Detectors (15:36, 27 May 2009)
- LVDS Pulses (22:40, 27 May 2009)
- CHIPS collaboration (16:37, 28 May 2009)
- LaTeX source (17:05, 28 May 2009)
- DXF (17:06, 28 May 2009)
- MAD input file (17:06, 28 May 2009)
- Twiss table (17:07, 28 May 2009)
- HPBv3 CoSn.eps (17:07, 28 May 2009)
- HPBv3 phase.eps (17:08, 28 May 2009)
- HPBv3 prof.eps (17:08, 28 May 2009)
- PCB HomeEtching (02:37, 6 June 2009)
- JPOS09 (16:14, 9 June 2009)
- Beamline design (G. Stancari) (23:07, 9 June 2009)
- HRRL 4-13-09 (22:19, 10 June 2009)
- VxWorks References (19:56, 11 June 2009)
- GEM HV Distribution Network (20:39, 17 June 2009)
- Particle Trajectory Code (22:29, 17 June 2009)
- RDYNLAB (17:54, 18 June 2009)
- Simulating Particle Trajectories (17:56, 18 June 2009)
- RDYNLAB Code (18:06, 18 June 2009)
- New Particle Trajectory Code (18:16, 18 June 2009)
- Forest He-3 Tubes (23:33, 22 June 2009)
- V1495 CODA CRL File (20:11, 25 June 2009)
- WarrensVFATRuns (16:05, 29 June 2009)
- V1495Lib.c (17:24, 29 June 2009)
- V1495Lib.h (17:25, 29 June 2009)
- Qweak R1 GEM DNP2009 (20:38, 30 June 2009)
- Pulse Recording Ideas (22:09, 13 July 2009)
- Ionization Chamber (22:14, 23 July 2009)
- Experimental set-up pictures (18:11, 28 July 2009)
- HRRL 7/2009 Test (18:12, 28 July 2009)
- Report of Results (18:14, 28 July 2009)
- HRRL RUN 29-07-2009 (13:33, 30 July 2009)
- HRRL 7-30-09 (12:41, 31 July 2009)
- VFAT Parts List (22:39, 4 August 2009)
- Qweak Qsqrd Tracking (15:07, 7 August 2009)
- CLAS apparatus (19:00, 10 August 2009)
- Forest Radiation Program (19:23, 10 August 2009)
- EventTransfer ET for CODA (20:54, 10 August 2009)
- HRRL 7-31-09 (20:22, 12 August 2009)
- Forest SolidState Detectors (14:57, 31 August 2009)
- Software Licensing & Access Information (17:19, 1 September 2009)
- ACCAPP 09 PhotFis Poster (20:35, 10 September 2009)
- NSF Final Report AwardNum0653570 (18:53, 11 September 2009)
- Breakout Board Design (19:15, 16 September 2009)
- Forest Tenure Prom (16:44, 17 September 2009)
- Randy Spaulding (16:58, 21 September 2009)
- Classes (20:06, 29 September 2009)
- Forest ModernPhysics (15:59, 30 September 2009)
- Test (19:59, 15 October 2009)
- October Run (20:01, 15 October 2009)
- Readout Controller (03:09, 19 October 2009)
- TGEM Mask Design (05:31, 26 October 2009)
- Ticket To Ride (02:50, 9 November 2009)
- Forest PMTs (22:31, 19 November 2009)
- Optim2g4beam.pl (16:18, 20 November 2009)
- PhysicsBasementCleanup 2009 (20:20, 20 November 2009)
- DNP 2009 R1 Talk (20:25, 28 November 2009)
- IAC LeadFlourideCherenkovCrystalTests 12-09 (20:05, 6 December 2009)
- IAC FC Scanner AmineSyed (15:49, 8 December 2009)
- IAC FC Scanner Amine and Syed (22:57, 8 December 2009)
- KVM Virtualization (23:02, 16 December 2009)
- LaserComptonScat (16:02, 23 December 2009)
- OptiM32 HRRL PositronDesign (16:12, 4 January 2010)
- TF Talks (19:22, 5 January 2010)
- Forest Scintillators (19:46, 8 January 2010)
- Physics List (03:54, 10 January 2010)
- Forest AngMomRecoupling (21:03, 11 January 2010)
- Schedule (01:23, 12 January 2010)
- Stuff From PhD Proposal (05:12, 17 January 2010)
- Qweak R1 Software (15:23, 22 January 2010)
- Charge Collector Design (15:30, 22 January 2010)
- Clean Room Temp Sensor (22:46, 4 February 2010)
- ForestErrAnal Data.dat (17:29, 22 February 2010)
- Forest Contamination Control (21:00, 25 February 2010)
- NI488.2 (01:49, 3 March 2010)
- TCR manual (01:14, 4 March 2010)
- IAC positron beamline (20:45, 4 March 2010)
- Mini-prototype (21:32, 9 March 2010)
- TF ZhongWen (01:04, 10 March 2010)
- Software Access Information (17:53, 31 March 2010)
- Clusters (01:14, 1 April 2010)
- Project homepage (22:11, 2 April 2010)
- FC Analysis (03:57, 5 April 2010)
- TF Resume (22:13, 5 April 2010)
- HRRLrun 3-22-26-2010 (15:05, 6 April 2010)
- March 2010 Run Report (21:07, 6 April 2010)
- Abstract (22:33, 12 April 2010)
- Introduction (22:35, 12 April 2010)
- V1495 Module by CAEN (22:35, 12 April 2010)
- Readout Controller Library (22:36, 12 April 2010)
- Noise Cancellation Techniques (22:36, 12 April 2010)
- Bibliography (01:07, 13 April 2010)
- Megan Homework (22:42, 13 April 2010)
- Qweak Commissioning 6-2010 (16:17, 24 April 2010)
- TGEM WasteHandling (18:51, 5 May 2010)
- 44 Linac Exit Geometry (04:27, 12 May 2010)
- Geometry (44 Mev LINAC exit port) (05:23, 14 May 2010)
- Counts Rate (44 Mev LINAC) (15:29, 14 May 2010)
- Pair Spectrometer Info (17:00, 21 May 2010)
- Apt-Proxy (22:04, 24 May 2010)