Dead-end pages

Jump to navigation Jump to search

The following pages do not link to other pages in New IAC Wiki.

Showing below up to 500 results in range #501 to #1,000.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. Geant4
  2. Geometry (25 MeV LINAC exit port)
  3. Geometry (44 MeV LINAC exit port)
  4. Geometry (44 Mev LINAC exit port)
  5. Geometry for different beam energies
  6. Go, baby, go
  7. Goals
  8. Google Books
  9. Google Docs
  10. Google Scholar
  11. Google Sites
  12. Google Tricks
  13. GradOverheadDisbursement
  14. Graduate Seminar Dr. Cole Spring 2013
  15. Greatfit.m (Matlab program fot fitting)
  16. Greenka
  17. Gumstix
  18. Gumstix Crapola
  19. Gumstix Installation
  20. HAM Beta extras
  21. HEDP notes
  22. HR-FN-0712-EDU7
  23. HRRL-03-17-2011-fit-error-ana
  24. HRRL/Egamma
  25. HRRL/EgammaVsD20Probability5cm
  26. HRRL/RadiatorLocation
  27. HRRL 16 MeV setup geometry
  28. HRRL 7-31-09
  29. HRRL Alignment 25Jun2012
  30. HRRL BeamLine orders
  31. HRRL Dec 15 2012Run
  32. HRRL Dec 19 2012Run
  33. HRRL Dec 20 2012Run
  34. HRRL Dec 21 2012Run
  35. HRRL Electron OSA
  36. HRRL Experiment Readiness Chek List
  37. HRRL Move 2010
  38. HRRL OSA SAMPLE
  39. HRRL Pos Test 26Jul2012 Data Ana Sub Spcs
  40. HRRL Pos Test 26Jul2012 Data Ana com r3686 r3687
  41. HRRL Pos Test 26Jul2012 Data Ana com r3688 r3689
  42. HRRL Pos Test 27Jul2012 Data Ana 1 MeV
  43. HRRL Pos Test 27Jul2012 Data Ana 2 MeV
  44. HRRL Pos Test 27Jul2012 Data Ana 3 MeV
  45. HRRL Pos Test 27jul2012 Data Ana 4 MeV
  46. HRRL Pos Test 27jul2012 Data Ana 5 MeV
  47. HRRL Positron Vendors Targets
  48. HRRL Positrons Jul 2012 Runs Setup
  49. HRRL RS
  50. HRRL RUN 29-07-2009
  51. HRRL Simulations
  52. HRRL VS. IAC
  53. HRRL jitter study
  54. HRRL room dimensions
  55. HRRLrun 3-22-26-2010
  56. HV-Circuit For TGEM-Detector
  57. HalBpaperReview
  58. High Voltage Units
  59. Histograms for Increasing Radii, Z = (-0.25cm,-0.5cm)
  60. Histograms for Increasing Radii, Z = (-0.25cm,0.0cm)
  61. Histograms for Increasing Radii, Z = (-0.5cm,-0.25cm)
  62. Histograms for Increasing Radii, Z = (-0.75cm,-0.5cm)
  63. Histograms for Increasing Radii, Z = (-1.0cm,-0.75cm)
  64. Histograms for Increasing Radii, Z = (-1.25cm,-1.0cm)
  65. Histograms for Increasing Radii, Z = (-1.25cm,-1.5cm)
  66. Histograms for Increasing Radii, Z = (-1.5cm,-1.25cm)
  67. Histograms for Increasing Radii, Z = (-1.75cm,-1.5cm)
  68. Histograms for Increasing Radii, Z = (-2.25cm,-2.0cm)
  69. Histograms for Increasing Radii, Z = (0.0cm,0.25cm)
  70. Histograms for Increasing Radii, Z = (0.0cm,0.5cm)
  71. Histograms for Increasing Radii, Z = (0.25cm,0.5cm)
  72. Histograms for Increasing Radii, Z = (0.5cm,0.75cm)
  73. Histograms for Increasing Radii, Z = (0.75cm,1.0cm)
  74. Histograms for Increasing Radii, Z = (1.0cm,1.25cm)
  75. Histograms for Increasing Radii, Z = (1.25cm,1.5cm)
  76. Histograms for Increasing Radii, Z = (1.5cm,1.75cm)
  77. Histograms for Increasing Radii, Z = (1.75cm,2.0cm)
  78. Histograms for Increasing Radii, Z = (2.0cm,2.25cm)
  79. Histograms for Increasing Radii, Z = (2.25cm,2.5cm)
  80. Histograms for Increasing Radii, Z = (2.5cm,2.75cm)
  81. Histograms for Increasing Radii, Z = (2.75cm,3.0cm)
  82. Histograms for Increasing Radii, Z = 0cm
  83. Housing
  84. How the B-Field Affects PMTs
  85. How to make the file name in cycle
  86. Hrrl pos jul2012 shieldings
  87. Hub001
  88. I2C expander chip
  89. IAC-Peak Sensing Measurements
  90. IAC-QDC Measurements
  91. IAC 1-4-08
  92. IAC 1-7-08
  93. IAC 1-8-08
  94. IAC 2-28-08
  95. IAC 2-29-08
  96. IAC FC Scanner AmineSyed
  97. IAC FC Scanner Amine and Syed
  98. IAC LeadFlourideCherenkovCrystalTests 12-09
  99. IAC Network Configurations
  100. IAC RFP
  101. IAC Radiator Specs
  102. IAC Wireless
  103. IAC data analysis for GEM
  104. IAC experimental cell
  105. ICF overview
  106. IGEM MRI
  107. IR camera selection
  108. ISIS LTSpice simulation
  109. ISIS simulations
  110. ISU Health Physics
  111. ISU Network Memo
  112. ISU Policies
  113. Ideas
  114. Image Analysis
  115. Images
  116. Imperial College
  117. Improvements HRRL Positron Runs July 2012
  118. In the wire frame
  119. Indiana University
  120. Inertial Confinement Fusion ICF
  121. InnerShieldAndFlange
  122. Installing A Cluster
  123. Installing GEANT4.9.3 Fsim
  124. Installing cMsg
  125. Insulators under a high voltage
  126. Integrated asymmetry
  127. Interim Report 5-18-08 AwardNum0653570
  128. Internet consulting
  129. Inverse Problem
  130. Investigation of Centroid Shift in Vz Differences
  131. Ion Diffusion
  132. Ion Interactions with Matter
  133. Ionization and Number of the the electrons produced
  134. Isotropic Spread in Lab Frame for 5 to 40 degrees in Theta and for Phi between -30 and 30 Degrees
  135. Isotropic Weighted Moller Distribution in GEMC
  136. JLAB Positron Source DOE Award DE-SC0002600
  137. JPOS09
  138. JacksonLDSwork
  139. Jasen's Presentations
  140. Jenny Lake, Grand Teton National Park
  141. Journals
  142. Jule 3,2007 Cf-252 without lead container measurements with HpGe & fast plastic scintillators in coincidence
  143. July, 6, 2007 Investigations of Geometry Influence on the Fission Fragments Behaviour
  144. July2012PosSimulation
  145. July 10, 2007 Division of gated to ungated spectra of Cf-252
  146. July 11, 2007 Experimental setup
  147. July 3,2007 Cf-252 without lead container measurements with HpGe & fast plastic scintillators in coincidence
  148. July 6, 2007 Neutron Capture in lead
  149. June,18,2007 Teachers in lab
  150. June, 11, 2007 Cosmic Ray measurements using HpGe Detector
  151. June, 18, 2007 Background measurements using HpGe detector
  152. June, 21, Cosmic background BC408 on top of HpGe
  153. June, 6, 2007 Scintillator Signals from source
  154. June, 7, 2007 Cf rate measurements using Photonics PMT
  155. June 15,2007 Cf-252 measurements with HpGe & neutron sensitive scintillators in coincidence
  156. June 19,2007 Cf-252 measurements of gamma-spectrum using HpGe ungated
  157. June 19,2007 Cf-252 measurements with HpGe & neutron sensitive scintillators in coincidence
  158. June 19, gamma-singles spectra of a Cf-252 source
  159. June 25,2007 Cf-252 measurements of gamma-spectrum using HpGe ungated
  160. June 25,2007 Cf-252 measurements of total gamma-spectrum using HpGe ungated
  161. June 27,2007 Cf-252 measurements with HpGe detector and BC408
  162. KAERI Daejeon
  163. KVM Virtualization
  164. Kalyan 16 may 08
  165. Kalyan 23 May 08
  166. Kalyan 23 May 08 2.1
  167. Kalyan 23 May 08 2.2
  168. Kalyan 23 May 08 2.3
  169. Kalyan 23 may 08
  170. Kalyan 30 May 08
  171. Kicker Magnet Tests 2012
  172. Kicker Magnets
  173. KiwiDipole
  174. Kiwi Dipole Mappings
  175. LBE Paper
  176. LB 170048 Nickel Foil Consistency Check
  177. LB April DetB DetA Calibration
  178. LB Calibration 2/12/17
  179. LB DAQ
  180. LB DetLimits Thesis
  181. LB Det A Dead Time
  182. LB Efficiency Plots Feb 2017
  183. LB IAC Radiator Specs
  184. LB January Flux Simulations
  185. LB MDA/Se Mass Calculations
  186. LB Manganese Work
  187. LB March 2017 Runlist
  188. LB May 2017 Det A Efficiency
  189. LB May 2017 Det B Efficiency
  190. LB May 2017 Nickel Investigations
  191. LB May Calibration 2017
  192. LB May Runlist 2017
  193. LB PAA Runlist 4/01/16 - 06/02/16
  194. LB Photon Flux Sim Feb 2017
  195. LB Rotating Sample Holder
  196. LB SageBrushWork PostDefense
  197. LB Se-79 Soil Analysis
  198. LB Se PAA Horse Feed Experiment
  199. LB Se PAA Horse Feed IAC Detector Effiencies
  200. LB Target Prep May 2017
  201. LB Thesis NewSNR Corrections
  202. LB Thesis Post Defense
  203. LB Thesis SNR
  204. LCS Experiment.C
  205. LDAP Ramblings
  206. LDS Equipment/Detectors
  207. LDS Equipment/Detectors/HPGe
  208. LDS Equipment/Detectors/HPGe/Dewars
  209. LDS Equipment/Detectors/HPGe/PopTops
  210. LDS Equipment/Detectors/Sodium Iodide
  211. LDS Equipment/Detectors/Sodium Iodide/Ospreys
  212. LDS Equipment/HV Power Supplies
  213. LDS Equipment/HV Power Supplies/Bias Supplies
  214. LDS Equipment/HV Power Supplies/Bias Supplies/Ortec 459
  215. LDS Equipment/HV Power Supplies/Bias Supplies/Ortec 478
  216. LDS Equipment/HV Power Supplies/Bias Supplies/Ortec 495
  217. LDS Equipment/HV Power Supplies/Bias Supplies/Ortec 659
  218. LDS Equipment/HV Power Supplies/Bias Supplies/Princeton Gamma-Tech BS-LN2
  219. LDS Equipment/HV Power Supplies/Bias Supplies/Tennelec 950
  220. LDS Equipment/HV Power Supplies/Bias Supplies/Tennelec 950A
  221. LDS Equipment/HV Power Supplies/Canberra 3002D
  222. LDS Equipment/HV Power Supplies/Canberra 3102D
  223. LDS Equipment/HV Power Supplies/Canberra 3106D
  224. LDS Equipment/HV Power Supplies/ORTEC 456
  225. LDS Equipment/HV Power Supplies/ORTEC 556
  226. LDS Equipment/HV Power Supplies/Tennelec 909
  227. LDS Equipment/HV Power Supplies/Tennelec 952
  228. LDS Equipment/NIM Bins
  229. LDS Equipment/NIM Bins/Number Eight
  230. LDS Equipment/NIM Bins/Number Eleven
  231. LDS Equipment/NIM Bins/Number Five
  232. LDS Equipment/NIM Bins/Number Four
  233. LDS Equipment/NIM Bins/Number Fourteen
  234. LDS Equipment/NIM Bins/Number Nine
  235. LDS Equipment/NIM Bins/Number One
  236. LDS Equipment/NIM Bins/Number Seven
  237. LDS Equipment/NIM Bins/Number Six
  238. LDS Equipment/NIM Bins/Number Ten
  239. LDS Equipment/NIM Bins/Number Thirteen
  240. LDS Equipment/NIM Bins/Number Three
  241. LDS Equipment/NIM Bins/Number Twelve
  242. LDS Equipment/NIM Bins/Number Two
  243. LDS Equipment/NIMs
  244. LDS Equipment/NIMs/ADC
  245. LDS Equipment/NIMs/ADC/Canberra 8076
  246. LDS Equipment/NIMs/ADC/Canberra 8713
  247. LDS Equipment/NIMs/ADC/ND 575
  248. LDS Equipment/NIMs/Amplifier SCA/Canberra 2015A
  249. LDS Equipment/NIMs/Amplifier SCA/Tennelec 216
  250. LDS Equipment/NIMs/Amplifiers
  251. LDS Equipment/NIMs/Amplifiers/Canberra 1457
  252. LDS Equipment/NIMs/Amplifiers/Canberra 2012
  253. LDS Equipment/NIMs/Amplifiers/Canberra 2021
  254. LDS Equipment/NIMs/Amplifiers/Canberra 2022
  255. LDS Equipment/NIMs/Amplifiers/Canberra 2026
  256. LDS Equipment/NIMs/Amplifiers/ORTEC 408A
  257. LDS Equipment/NIMs/Amplifiers/ORTEC 427
  258. LDS Equipment/NIMs/Amplifiers/ORTEC 450
  259. LDS Equipment/NIMs/Amplifiers/ORTEC 460
  260. LDS Equipment/NIMs/Amplifiers/ORTEC 474
  261. LDS Equipment/NIMs/Amplifiers/ORTEC 572
  262. LDS Equipment/NIMs/Amplifiers/ORTEC 575
  263. LDS Equipment/NIMs/Amplifiers/Tennelec 202
  264. LDS Equipment/NIMs/Amplifiers/Tennelec 205A
  265. LDS Equipment/NIMs/Amplifiers/Tennelec 245
  266. LDS Equipment/NIMs/Counter-Timers
  267. LDS Equipment/NIMs/Counter-Timers/Canberra 1468
  268. LDS Equipment/NIMs/Counter-Timers/Canberra 1772
  269. LDS Equipment/NIMs/Counter-Timers/Canberra 2071A
  270. LDS Equipment/NIMs/Counter-Timers/Ortec 770
  271. LDS Equipment/NIMs/Counter-Timers/Tennelec 566A
  272. LDS Equipment/NIMs/Delays
  273. LDS Equipment/NIMs/Delays/Canberra 2055
  274. LDS Equipment/NIMs/Delays/Ortec 416A
  275. LDS Equipment/NIMs/Delays/Ortec 425
  276. LDS Equipment/NIMs/Delays/Ortec 425A
  277. LDS Equipment/NIMs/Discriminators
  278. LDS Equipment/NIMs/Discriminators/Canberra 1428
  279. LDS Equipment/NIMs/Discriminators/Canberra 2032
  280. LDS Equipment/NIMs/Discriminators/Canberra 2160A
  281. LDS Equipment/NIMs/Discriminators/Ortec 421
  282. LDS Equipment/NIMs/MCS
  283. LDS Equipment/NIMs/MCS/Canberra 578
  284. LDS Equipment/NIMs/MCS/ND 578
  285. LDS Equipment/NIMs/MISC
  286. LDS Equipment/NIMs/MISC/Canberra 556A
  287. LDS Equipment/NIMs/MISC/ND 589
  288. LDS Equipment/NIMs/MISC/Ortec 457
  289. LDS Equipment/NIMs/MISC/Ortec 533
  290. LDS Equipment/NIMs/MISC/Tennelec 585P
  291. LDS Equipment/NIMs/MISC/Tennelec 588
  292. LDS Equipment/NIMs/Mixer-Routers
  293. LDS Equipment/NIMs/Mixer-Routers/Canberra 8222
  294. LDS Equipment/NIMs/Mixer-Routers/Canberra 8222A
  295. LDS Equipment/NIMs/Ratemeters
  296. LDS Equipment/NIMs/Ratemeters/Canberra 1481
  297. LDS Equipment/NIMs/Ratemeters/Oretc 441
  298. LDS Equipment/NIMs/Ratemeters/Oretc 449
  299. LDS Equipment/NIMs/Ratemeters/Oretc 541
  300. LDS Equipment/NIMs/SCA
  301. LDS Equipment/NIMs/SCA/Canberra 2030
  302. LDS Equipment/NIMs/SCA/ORTEC SCA 550
  303. LDS Equipment/NIMs/SCA/Ortec 413
  304. LDS Equipment/NIMs/SCA/Ortec 420
  305. LDS Equipment/NIMs/SCA/Ortec 455
  306. LDS Equipment/NIMs/SCA/Tennelec 440
  307. LDS Equipment/NIMs/SCA/Tennelec 450
  308. LDS Equipment/PreAmps
  309. LDS Equipment/PreAmps/Ortec 113
  310. LDS Equipment/PreAmps/Ortec 142
  311. LDS Pics
  312. LDS shopping List
  313. LTSpice
  314. LTSpice ISIS simulations
  315. LUND2ParticleGun.C
  316. LUND Spread LH2 0Phi.C
  317. LVDS Pulses
  318. LabSkills TF
  319. Lab 2 RS
  320. Lab Report 1
  321. Lab Reports 1
  322. Lang
  323. Large Deflection Membrane Stiffened Static Analysis
  324. Last commands.tcsh
  325. Least fission fragment K.E needed for ionization
  326. Lecroy Quad discriminator Model 821
  327. Linux
  328. List of Programs IAC is liscensed to Use
  329. Literature review
  330. Logic Unit
  331. Long run peak sensing histograms
  332. Looking for data
  333. Ludlums Gamma Area Monitor moedl 45-9
  334. MCNPX Simulations for Neutron Beam
  335. MCNP Sim of Jack Converter
  336. MINIDC MinVoltageStudy
  337. MPA/DAQ Runs 2/13/17
  338. MT target
  339. MVME 6100 ROC
  340. Magnet
  341. Magnet Calculations
  342. Main report
  343. Mallory Williams Schedule
  344. Mapping of Quadruple Magnets
  345. March 2010 Run Report
  346. March 2011 Data Analysis
  347. March 2017 Runlist
  348. Matching Detectors
  349. Mathematica Simulation
  350. MaxEnt
  351. McNulty's root codes
  352. Meadow Lake, Idaho
  353. Mechanics Qual Problems
  354. Medical
  355. Medical and Health Physics
  356. Megan Homework
  357. Memberships
  358. Merging background hits
  359. Metalica TestPulseoutput 12-20-07
  360. Metalica TestPulseoutput 12-21-07
  361. MiniDC PreampOutput 10 10 07
  362. MiniDC Signals 10-0-07
  363. MiniDC Signals 4-22-08
  364. MiniDC Signals 4-25-08
  365. MiniPrototype CAEN V792 Calibration
  366. MiniPrototype CoincidenceCosmicRuns 2008
  367. MiniPrototype CosmicRuns
  368. MiniPrototype Operation Regions 2008
  369. MiniPrototype SinglesCosmicRuns 2008
  370. Minicom
  371. Minimum accelerator energy to run experiment
  372. Mo-99 Production
  373. Monitoring Server
  374. Monte Carlo Binary Collision Approximation
  375. More with kitchen
  376. Mount Rainier National Park, Washington
  377. Multi-hit data
  378. Multi hit TDC timing
  379. Multiple scattering Angle
  380. My classes
  381. Mylar Linear Small Deflection
  382. N's detectors threshold measurements 2/28/11
  383. ND TOF calibration.C
  384. ND asymmetry.C
  385. NDasymStudy1.C
  386. NDasymStudy2.C
  387. NEUP 2009 V1
  388. NI488.2
  389. NIM Bins
  390. NIM Modules
  391. NNSA Center 2012
  392. NSF 08 FinalReport
  393. NSF Proposal 2007 AwardNum0653570
  394. NSF Reviewer 2014
  395. NWChem
  396. NaI spectra
  397. National Ignition Facility (NIF)
  398. Nerd Group Meeting
  399. Neutron&photon rates with CF252
  400. Neutron Detector Setup
  401. Neutron Electric Form Factor
  402. Neutron Energy Distribution
  403. Neutron Polarimeter
  404. Neutron Production Thresholds
  405. Neutron Time of Flight Test
  406. Neutron energy resolution in NaI detector
  407. Neutron energy resolution in plastic scintillation detector with start signal from NaI detector
  408. Neutron energy resolution with start signal from NaI detector
  409. Neutron time of fligth and energy distribution
  410. New 4-momentum quantities
  411. New Proposal
  412. New iPad
  413. Nim bin
  414. Niowave 1-2016
  415. Niowave 10-2015
  416. Niowave 11-2015
  417. Niowave 12-2015
  418. Niowave 2-2016
  419. Niowave 3-2016
  420. Niowave 4-2016
  421. Niowave 9-2015
  422. Non fissile targets
  423. Normal and Membrane Stress approach
  424. Normal and Membrane Stresses approach
  425. Normalized and BKG subtracted data
  426. Normalized and BKG subtracted data for Det E
  427. Normalized and BKG subtracted data for Det F
  428. Normalized and BKG subtracted data for Det G
  429. Normalized and BKG subtracted data for Det H
  430. Normalized and BKG subtracted data for Det I
  431. Normalized and BKG subtracted data for Det M
  432. Not Working
  433. Notes
  434. Notes about program of study requirements. From Dr. Wells talk, Aug 26, 2011, graduate student orientation
  435. Notes for the July 11th, 2008 Meeting
  436. Notes from July 22nd, 2008 Meeting
  437. Notes from July 2nd, 2008 Meeting
  438. November 1, 2007 - Cosmic Telescope
  439. November 12, 2007 - Cosmic Telescope
  440. November 13, 2007 - Cosmic Telescope
  441. November 14, 2007 - Cosmic Telescope
  442. November 15, 2007 - Cosmic Telescope
  443. November 16, 2007 - Cosmic Telescope
  444. November 19, 2007 - Cosmic Telescope
  445. November 2, 2007 - Cosmic Telescope
  446. November 20, 2007 - Cosmic Telescope
  447. November 4, 2007 - Cosmic Telescope
  448. November 5, 2007 - Cosmic Telescope
  449. November 6, 2007 - Cosmic Telescope
  450. November 7, 2007 - Cosmic Telescope
  451. November 8, 2007 - Cosmic Telescope
  452. November 9, 2007 - Cosmic Telescope
  453. NucPhys I Syllabus
  454. Nuclear data
  455. Number of electron-positron pairs/sec out of Al converte
  456. October 1, 2007 - Cosmic Telescope
  457. October 10, 2007 - Cosmic Telescope
  458. October 10, 2008 Run-day one
  459. October 11, 2007 - Cosmic Telescope
  460. October 11, 2007 - Cosmic Telescope2
  461. October 12, 2007 - Cosmic Telescope
  462. October 14, 2008 Double peak problem
  463. October 15, 2007 - Cosmic Telescope
  464. October 16, 2007 - Cosmic Telescope
  465. October 16, 2008
  466. October 17, 2007 - Cosmic Telescope
  467. October 17, 2008
  468. October 18, 2007 - Cosmic Telescope
  469. October 19, 2007 - Cosmic Telescope
  470. October 2, 2007 - Cosmic Telescope
  471. October 22, 2007 - Cosmic Telescope
  472. October 22, 2008
  473. October 23, 2007 - Cosmic Telescope
  474. October 24, 2007 - Cosmic Telescope
  475. October 25, 2007 - Cosmic Telescope
  476. October 3, 2007 - Cosmic Telescope
  477. October 31, 2007 - Cosmic Telescope
  478. October 4, 2007 - Cosmic Telescope
  479. October 5, 2007 - Cosmic Telescope
  480. October 6, 2007 - Cosmic Telescope
  481. October 7, 2007 - Cosmic Telescope
  482. October 8, 2007 - Cosmic Telescope
  483. October 9, 2007 - Cosmic Telescope
  484. October Run
  485. Old Breakout Board Design
  486. Old work
  487. Olympic Park Lorain Peak
  488. Once Angles and weight
  489. Optical coupling compound
  490. Optimization of Positron Capturing
  491. Origin licensing
  492. Ortec Amplifier Model 485
  493. Ortec Quad Fast Amp Model 535
  494. Other Images of the apparatus and equipment
  495. OuterFlange
  496. OuterMount
  497. Outside Sector Runs
  498. PAD Model 814A Amplifier
  499. PCB HomeEtching
  500. PEPPo Software

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)