Dead-end pages
Jump to navigation
Jump to search
The following pages do not link to other pages in New IAC Wiki.
Showing below up to 500 results in range #501 to #1,000.
View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)
- Geant4
- Geometry (25 MeV LINAC exit port)
- Geometry (44 MeV LINAC exit port)
- Geometry (44 Mev LINAC exit port)
- Geometry for different beam energies
- Go, baby, go
- Goals
- Google Books
- Google Docs
- Google Scholar
- Google Sites
- Google Tricks
- GradOverheadDisbursement
- Graduate Seminar Dr. Cole Spring 2013
- Greatfit.m (Matlab program fot fitting)
- Greenka
- Gumstix
- Gumstix Crapola
- Gumstix Installation
- HAM Beta extras
- HEDP notes
- HR-FN-0712-EDU7
- HRRL-03-17-2011-fit-error-ana
- HRRL/Egamma
- HRRL/EgammaVsD20Probability5cm
- HRRL/RadiatorLocation
- HRRL 16 MeV setup geometry
- HRRL 7-31-09
- HRRL Alignment 25Jun2012
- HRRL BeamLine orders
- HRRL Dec 15 2012Run
- HRRL Dec 19 2012Run
- HRRL Dec 20 2012Run
- HRRL Dec 21 2012Run
- HRRL Electron OSA
- HRRL Experiment Readiness Chek List
- HRRL Move 2010
- HRRL OSA SAMPLE
- HRRL Pos Test 26Jul2012 Data Ana Sub Spcs
- HRRL Pos Test 26Jul2012 Data Ana com r3686 r3687
- HRRL Pos Test 26Jul2012 Data Ana com r3688 r3689
- HRRL Pos Test 27Jul2012 Data Ana 1 MeV
- HRRL Pos Test 27Jul2012 Data Ana 2 MeV
- HRRL Pos Test 27Jul2012 Data Ana 3 MeV
- HRRL Pos Test 27jul2012 Data Ana 4 MeV
- HRRL Pos Test 27jul2012 Data Ana 5 MeV
- HRRL Positron Vendors Targets
- HRRL Positrons Jul 2012 Runs Setup
- HRRL RS
- HRRL RUN 29-07-2009
- HRRL Simulations
- HRRL VS. IAC
- HRRL jitter study
- HRRL room dimensions
- HRRLrun 3-22-26-2010
- HV-Circuit For TGEM-Detector
- HalBpaperReview
- High Voltage Units
- Histograms for Increasing Radii, Z = (-0.25cm,-0.5cm)
- Histograms for Increasing Radii, Z = (-0.25cm,0.0cm)
- Histograms for Increasing Radii, Z = (-0.5cm,-0.25cm)
- Histograms for Increasing Radii, Z = (-0.75cm,-0.5cm)
- Histograms for Increasing Radii, Z = (-1.0cm,-0.75cm)
- Histograms for Increasing Radii, Z = (-1.25cm,-1.0cm)
- Histograms for Increasing Radii, Z = (-1.25cm,-1.5cm)
- Histograms for Increasing Radii, Z = (-1.5cm,-1.25cm)
- Histograms for Increasing Radii, Z = (-1.75cm,-1.5cm)
- Histograms for Increasing Radii, Z = (-2.25cm,-2.0cm)
- Histograms for Increasing Radii, Z = (0.0cm,0.25cm)
- Histograms for Increasing Radii, Z = (0.0cm,0.5cm)
- Histograms for Increasing Radii, Z = (0.25cm,0.5cm)
- Histograms for Increasing Radii, Z = (0.5cm,0.75cm)
- Histograms for Increasing Radii, Z = (0.75cm,1.0cm)
- Histograms for Increasing Radii, Z = (1.0cm,1.25cm)
- Histograms for Increasing Radii, Z = (1.25cm,1.5cm)
- Histograms for Increasing Radii, Z = (1.5cm,1.75cm)
- Histograms for Increasing Radii, Z = (1.75cm,2.0cm)
- Histograms for Increasing Radii, Z = (2.0cm,2.25cm)
- Histograms for Increasing Radii, Z = (2.25cm,2.5cm)
- Histograms for Increasing Radii, Z = (2.5cm,2.75cm)
- Histograms for Increasing Radii, Z = (2.75cm,3.0cm)
- Histograms for Increasing Radii, Z = 0cm
- Housing
- How the B-Field Affects PMTs
- How to make the file name in cycle
- Hrrl pos jul2012 shieldings
- Hub001
- I2C expander chip
- IAC-Peak Sensing Measurements
- IAC-QDC Measurements
- IAC 1-4-08
- IAC 1-7-08
- IAC 1-8-08
- IAC 2-28-08
- IAC 2-29-08
- IAC FC Scanner AmineSyed
- IAC FC Scanner Amine and Syed
- IAC LeadFlourideCherenkovCrystalTests 12-09
- IAC Network Configurations
- IAC RFP
- IAC Radiator Specs
- IAC Wireless
- IAC data analysis for GEM
- IAC experimental cell
- ICF overview
- IGEM MRI
- IR camera selection
- ISIS LTSpice simulation
- ISIS simulations
- ISU Health Physics
- ISU Network Memo
- ISU Policies
- Ideas
- Image Analysis
- Images
- Imperial College
- Improvements HRRL Positron Runs July 2012
- In the wire frame
- Indiana University
- Inertial Confinement Fusion ICF
- InnerShieldAndFlange
- Installing A Cluster
- Installing GEANT4.9.3 Fsim
- Installing cMsg
- Insulators under a high voltage
- Integrated asymmetry
- Interim Report 5-18-08 AwardNum0653570
- Internet consulting
- Inverse Problem
- Investigation of Centroid Shift in Vz Differences
- Ion Diffusion
- Ion Interactions with Matter
- Ionization and Number of the the electrons produced
- Isotropic Spread in Lab Frame for 5 to 40 degrees in Theta and for Phi between -30 and 30 Degrees
- Isotropic Weighted Moller Distribution in GEMC
- JLAB Positron Source DOE Award DE-SC0002600
- JPOS09
- JacksonLDSwork
- Jasen's Presentations
- Jenny Lake, Grand Teton National Park
- Journals
- Jule 3,2007 Cf-252 without lead container measurements with HpGe & fast plastic scintillators in coincidence
- July, 6, 2007 Investigations of Geometry Influence on the Fission Fragments Behaviour
- July2012PosSimulation
- July 10, 2007 Division of gated to ungated spectra of Cf-252
- July 11, 2007 Experimental setup
- July 3,2007 Cf-252 without lead container measurements with HpGe & fast plastic scintillators in coincidence
- July 6, 2007 Neutron Capture in lead
- June,18,2007 Teachers in lab
- June, 11, 2007 Cosmic Ray measurements using HpGe Detector
- June, 18, 2007 Background measurements using HpGe detector
- June, 21, Cosmic background BC408 on top of HpGe
- June, 6, 2007 Scintillator Signals from source
- June, 7, 2007 Cf rate measurements using Photonics PMT
- June 15,2007 Cf-252 measurements with HpGe & neutron sensitive scintillators in coincidence
- June 19,2007 Cf-252 measurements of gamma-spectrum using HpGe ungated
- June 19,2007 Cf-252 measurements with HpGe & neutron sensitive scintillators in coincidence
- June 19, gamma-singles spectra of a Cf-252 source
- June 25,2007 Cf-252 measurements of gamma-spectrum using HpGe ungated
- June 25,2007 Cf-252 measurements of total gamma-spectrum using HpGe ungated
- June 27,2007 Cf-252 measurements with HpGe detector and BC408
- KAERI Daejeon
- KVM Virtualization
- Kalyan 16 may 08
- Kalyan 23 May 08
- Kalyan 23 May 08 2.1
- Kalyan 23 May 08 2.2
- Kalyan 23 May 08 2.3
- Kalyan 23 may 08
- Kalyan 30 May 08
- Kicker Magnet Tests 2012
- Kicker Magnets
- KiwiDipole
- Kiwi Dipole Mappings
- LBE Paper
- LB 170048 Nickel Foil Consistency Check
- LB April DetB DetA Calibration
- LB Calibration 2/12/17
- LB DAQ
- LB DetLimits Thesis
- LB Det A Dead Time
- LB Efficiency Plots Feb 2017
- LB IAC Radiator Specs
- LB January Flux Simulations
- LB MDA/Se Mass Calculations
- LB Manganese Work
- LB March 2017 Runlist
- LB May 2017 Det A Efficiency
- LB May 2017 Det B Efficiency
- LB May 2017 Nickel Investigations
- LB May Calibration 2017
- LB May Runlist 2017
- LB PAA Runlist 4/01/16 - 06/02/16
- LB Photon Flux Sim Feb 2017
- LB Rotating Sample Holder
- LB SageBrushWork PostDefense
- LB Se-79 Soil Analysis
- LB Se PAA Horse Feed Experiment
- LB Se PAA Horse Feed IAC Detector Effiencies
- LB Target Prep May 2017
- LB Thesis NewSNR Corrections
- LB Thesis Post Defense
- LB Thesis SNR
- LCS Experiment.C
- LDAP Ramblings
- LDS Equipment/Detectors
- LDS Equipment/Detectors/HPGe
- LDS Equipment/Detectors/HPGe/Dewars
- LDS Equipment/Detectors/HPGe/PopTops
- LDS Equipment/Detectors/Sodium Iodide
- LDS Equipment/Detectors/Sodium Iodide/Ospreys
- LDS Equipment/HV Power Supplies
- LDS Equipment/HV Power Supplies/Bias Supplies
- LDS Equipment/HV Power Supplies/Bias Supplies/Ortec 459
- LDS Equipment/HV Power Supplies/Bias Supplies/Ortec 478
- LDS Equipment/HV Power Supplies/Bias Supplies/Ortec 495
- LDS Equipment/HV Power Supplies/Bias Supplies/Ortec 659
- LDS Equipment/HV Power Supplies/Bias Supplies/Princeton Gamma-Tech BS-LN2
- LDS Equipment/HV Power Supplies/Bias Supplies/Tennelec 950
- LDS Equipment/HV Power Supplies/Bias Supplies/Tennelec 950A
- LDS Equipment/HV Power Supplies/Canberra 3002D
- LDS Equipment/HV Power Supplies/Canberra 3102D
- LDS Equipment/HV Power Supplies/Canberra 3106D
- LDS Equipment/HV Power Supplies/ORTEC 456
- LDS Equipment/HV Power Supplies/ORTEC 556
- LDS Equipment/HV Power Supplies/Tennelec 909
- LDS Equipment/HV Power Supplies/Tennelec 952
- LDS Equipment/NIM Bins
- LDS Equipment/NIM Bins/Number Eight
- LDS Equipment/NIM Bins/Number Eleven
- LDS Equipment/NIM Bins/Number Five
- LDS Equipment/NIM Bins/Number Four
- LDS Equipment/NIM Bins/Number Fourteen
- LDS Equipment/NIM Bins/Number Nine
- LDS Equipment/NIM Bins/Number One
- LDS Equipment/NIM Bins/Number Seven
- LDS Equipment/NIM Bins/Number Six
- LDS Equipment/NIM Bins/Number Ten
- LDS Equipment/NIM Bins/Number Thirteen
- LDS Equipment/NIM Bins/Number Three
- LDS Equipment/NIM Bins/Number Twelve
- LDS Equipment/NIM Bins/Number Two
- LDS Equipment/NIMs
- LDS Equipment/NIMs/ADC
- LDS Equipment/NIMs/ADC/Canberra 8076
- LDS Equipment/NIMs/ADC/Canberra 8713
- LDS Equipment/NIMs/ADC/ND 575
- LDS Equipment/NIMs/Amplifier SCA/Canberra 2015A
- LDS Equipment/NIMs/Amplifier SCA/Tennelec 216
- LDS Equipment/NIMs/Amplifiers
- LDS Equipment/NIMs/Amplifiers/Canberra 1457
- LDS Equipment/NIMs/Amplifiers/Canberra 2012
- LDS Equipment/NIMs/Amplifiers/Canberra 2021
- LDS Equipment/NIMs/Amplifiers/Canberra 2022
- LDS Equipment/NIMs/Amplifiers/Canberra 2026
- LDS Equipment/NIMs/Amplifiers/ORTEC 408A
- LDS Equipment/NIMs/Amplifiers/ORTEC 427
- LDS Equipment/NIMs/Amplifiers/ORTEC 450
- LDS Equipment/NIMs/Amplifiers/ORTEC 460
- LDS Equipment/NIMs/Amplifiers/ORTEC 474
- LDS Equipment/NIMs/Amplifiers/ORTEC 572
- LDS Equipment/NIMs/Amplifiers/ORTEC 575
- LDS Equipment/NIMs/Amplifiers/Tennelec 202
- LDS Equipment/NIMs/Amplifiers/Tennelec 205A
- LDS Equipment/NIMs/Amplifiers/Tennelec 245
- LDS Equipment/NIMs/Counter-Timers
- LDS Equipment/NIMs/Counter-Timers/Canberra 1468
- LDS Equipment/NIMs/Counter-Timers/Canberra 1772
- LDS Equipment/NIMs/Counter-Timers/Canberra 2071A
- LDS Equipment/NIMs/Counter-Timers/Ortec 770
- LDS Equipment/NIMs/Counter-Timers/Tennelec 566A
- LDS Equipment/NIMs/Delays
- LDS Equipment/NIMs/Delays/Canberra 2055
- LDS Equipment/NIMs/Delays/Ortec 416A
- LDS Equipment/NIMs/Delays/Ortec 425
- LDS Equipment/NIMs/Delays/Ortec 425A
- LDS Equipment/NIMs/Discriminators
- LDS Equipment/NIMs/Discriminators/Canberra 1428
- LDS Equipment/NIMs/Discriminators/Canberra 2032
- LDS Equipment/NIMs/Discriminators/Canberra 2160A
- LDS Equipment/NIMs/Discriminators/Ortec 421
- LDS Equipment/NIMs/MCS
- LDS Equipment/NIMs/MCS/Canberra 578
- LDS Equipment/NIMs/MCS/ND 578
- LDS Equipment/NIMs/MISC
- LDS Equipment/NIMs/MISC/Canberra 556A
- LDS Equipment/NIMs/MISC/ND 589
- LDS Equipment/NIMs/MISC/Ortec 457
- LDS Equipment/NIMs/MISC/Ortec 533
- LDS Equipment/NIMs/MISC/Tennelec 585P
- LDS Equipment/NIMs/MISC/Tennelec 588
- LDS Equipment/NIMs/Mixer-Routers
- LDS Equipment/NIMs/Mixer-Routers/Canberra 8222
- LDS Equipment/NIMs/Mixer-Routers/Canberra 8222A
- LDS Equipment/NIMs/Ratemeters
- LDS Equipment/NIMs/Ratemeters/Canberra 1481
- LDS Equipment/NIMs/Ratemeters/Oretc 441
- LDS Equipment/NIMs/Ratemeters/Oretc 449
- LDS Equipment/NIMs/Ratemeters/Oretc 541
- LDS Equipment/NIMs/SCA
- LDS Equipment/NIMs/SCA/Canberra 2030
- LDS Equipment/NIMs/SCA/ORTEC SCA 550
- LDS Equipment/NIMs/SCA/Ortec 413
- LDS Equipment/NIMs/SCA/Ortec 420
- LDS Equipment/NIMs/SCA/Ortec 455
- LDS Equipment/NIMs/SCA/Tennelec 440
- LDS Equipment/NIMs/SCA/Tennelec 450
- LDS Equipment/PreAmps
- LDS Equipment/PreAmps/Ortec 113
- LDS Equipment/PreAmps/Ortec 142
- LDS Pics
- LDS shopping List
- LTSpice
- LTSpice ISIS simulations
- LUND2ParticleGun.C
- LUND Spread LH2 0Phi.C
- LVDS Pulses
- LabSkills TF
- Lab 2 RS
- Lab Report 1
- Lab Reports 1
- Lang
- Large Deflection Membrane Stiffened Static Analysis
- Last commands.tcsh
- Least fission fragment K.E needed for ionization
- Lecroy Quad discriminator Model 821
- Linux
- List of Programs IAC is liscensed to Use
- Literature review
- Logic Unit
- Long run peak sensing histograms
- Looking for data
- Ludlums Gamma Area Monitor moedl 45-9
- MCNPX Simulations for Neutron Beam
- MCNP Sim of Jack Converter
- MINIDC MinVoltageStudy
- MPA/DAQ Runs 2/13/17
- MT target
- MVME 6100 ROC
- Magnet
- Magnet Calculations
- Main report
- Mallory Williams Schedule
- Mapping of Quadruple Magnets
- March 2010 Run Report
- March 2011 Data Analysis
- March 2017 Runlist
- Matching Detectors
- Mathematica Simulation
- MaxEnt
- McNulty's root codes
- Meadow Lake, Idaho
- Mechanics Qual Problems
- Medical
- Medical and Health Physics
- Megan Homework
- Memberships
- Merging background hits
- Metalica TestPulseoutput 12-20-07
- Metalica TestPulseoutput 12-21-07
- MiniDC PreampOutput 10 10 07
- MiniDC Signals 10-0-07
- MiniDC Signals 4-22-08
- MiniDC Signals 4-25-08
- MiniPrototype CAEN V792 Calibration
- MiniPrototype CoincidenceCosmicRuns 2008
- MiniPrototype CosmicRuns
- MiniPrototype Operation Regions 2008
- MiniPrototype SinglesCosmicRuns 2008
- Minicom
- Minimum accelerator energy to run experiment
- Mo-99 Production
- Monitoring Server
- Monte Carlo Binary Collision Approximation
- More with kitchen
- Mount Rainier National Park, Washington
- Multi-hit data
- Multi hit TDC timing
- Multiple scattering Angle
- My classes
- Mylar Linear Small Deflection
- N's detectors threshold measurements 2/28/11
- ND TOF calibration.C
- ND asymmetry.C
- NDasymStudy1.C
- NDasymStudy2.C
- NEUP 2009 V1
- NI488.2
- NIM Bins
- NIM Modules
- NNSA Center 2012
- NSF 08 FinalReport
- NSF Proposal 2007 AwardNum0653570
- NSF Reviewer 2014
- NWChem
- NaI spectra
- National Ignition Facility (NIF)
- Nerd Group Meeting
- Neutron&photon rates with CF252
- Neutron Detector Setup
- Neutron Electric Form Factor
- Neutron Energy Distribution
- Neutron Polarimeter
- Neutron Production Thresholds
- Neutron Time of Flight Test
- Neutron energy resolution in NaI detector
- Neutron energy resolution in plastic scintillation detector with start signal from NaI detector
- Neutron energy resolution with start signal from NaI detector
- Neutron time of fligth and energy distribution
- New 4-momentum quantities
- New Proposal
- New iPad
- Nim bin
- Niowave 1-2016
- Niowave 10-2015
- Niowave 11-2015
- Niowave 12-2015
- Niowave 2-2016
- Niowave 3-2016
- Niowave 4-2016
- Niowave 9-2015
- Non fissile targets
- Normal and Membrane Stress approach
- Normal and Membrane Stresses approach
- Normalized and BKG subtracted data
- Normalized and BKG subtracted data for Det E
- Normalized and BKG subtracted data for Det F
- Normalized and BKG subtracted data for Det G
- Normalized and BKG subtracted data for Det H
- Normalized and BKG subtracted data for Det I
- Normalized and BKG subtracted data for Det M
- Not Working
- Notes
- Notes about program of study requirements. From Dr. Wells talk, Aug 26, 2011, graduate student orientation
- Notes for the July 11th, 2008 Meeting
- Notes from July 22nd, 2008 Meeting
- Notes from July 2nd, 2008 Meeting
- November 1, 2007 - Cosmic Telescope
- November 12, 2007 - Cosmic Telescope
- November 13, 2007 - Cosmic Telescope
- November 14, 2007 - Cosmic Telescope
- November 15, 2007 - Cosmic Telescope
- November 16, 2007 - Cosmic Telescope
- November 19, 2007 - Cosmic Telescope
- November 2, 2007 - Cosmic Telescope
- November 20, 2007 - Cosmic Telescope
- November 4, 2007 - Cosmic Telescope
- November 5, 2007 - Cosmic Telescope
- November 6, 2007 - Cosmic Telescope
- November 7, 2007 - Cosmic Telescope
- November 8, 2007 - Cosmic Telescope
- November 9, 2007 - Cosmic Telescope
- NucPhys I Syllabus
- Nuclear data
- Number of electron-positron pairs/sec out of Al converte
- October 1, 2007 - Cosmic Telescope
- October 10, 2007 - Cosmic Telescope
- October 10, 2008 Run-day one
- October 11, 2007 - Cosmic Telescope
- October 11, 2007 - Cosmic Telescope2
- October 12, 2007 - Cosmic Telescope
- October 14, 2008 Double peak problem
- October 15, 2007 - Cosmic Telescope
- October 16, 2007 - Cosmic Telescope
- October 16, 2008
- October 17, 2007 - Cosmic Telescope
- October 17, 2008
- October 18, 2007 - Cosmic Telescope
- October 19, 2007 - Cosmic Telescope
- October 2, 2007 - Cosmic Telescope
- October 22, 2007 - Cosmic Telescope
- October 22, 2008
- October 23, 2007 - Cosmic Telescope
- October 24, 2007 - Cosmic Telescope
- October 25, 2007 - Cosmic Telescope
- October 3, 2007 - Cosmic Telescope
- October 31, 2007 - Cosmic Telescope
- October 4, 2007 - Cosmic Telescope
- October 5, 2007 - Cosmic Telescope
- October 6, 2007 - Cosmic Telescope
- October 7, 2007 - Cosmic Telescope
- October 8, 2007 - Cosmic Telescope
- October 9, 2007 - Cosmic Telescope
- October Run
- Old Breakout Board Design
- Old work
- Olympic Park Lorain Peak
- Once Angles and weight
- Optical coupling compound
- Optimization of Positron Capturing
- Origin licensing
- Ortec Amplifier Model 485
- Ortec Quad Fast Amp Model 535
- Other Images of the apparatus and equipment
- OuterFlange
- OuterMount
- Outside Sector Runs
- PAD Model 814A Amplifier
- PCB HomeEtching
- PEPPo Software