Pages without language links

Jump to navigation Jump to search

The following pages do not link to other language versions.

Showing below up to 250 results in range #101 to #350.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. 1945:D2O Beam-up ND TOF
  2. 1945:D2O Beam-up ND TOF calibration
  3. 1945:D2O Beam-up ND energy
  4. 1945:D2O Beam-up ND energy neutronsOnly
  5. 1946:D2O Beam-up Rad-out
  6. 1946:D2O Beam-up Rad-out ND TOF
  7. 1946:D2O Beam-up Rad-out ND TOF calibration
  8. 1946:D2O Beam-up Rad-out ND energy
  9. 1946:D2O Beam-up Rad-out ND energy neutronsOnly
  10. 1947:H2O Beam-up
  11. 1947:H2O Beam-up ND TOF
  12. 1947:H2O Beam-up ND TOF calibration
  13. 1947:H2O Beam-up ND energy
  14. 1947:H2O Beam-up ND energy neutronsOnly
  15. 1948:H2O Beam-down
  16. 1948:H2O Beam-down ND TOF
  17. 1948:H2O Beam-down ND TOF calibration
  18. 1948:H2O Beam-down ND energy
  19. 1948:H2O Beam-down ND energy neutronsOnly
  20. 1949:DU
  21. 1949:DU ND TOF
  22. 1949:DU ND TOF calibration
  23. 1949:DU ND energy
  24. 1949:DU ND energy neutronsOnly
  25. 1 credit vs 9 credits
  26. 2-LTD-brick x-pinch driver
  27. 2-LTD-brick x-pinch driver notes
  28. 2-Neutron Correlation
  29. 2-Neutron Correlation Setup Stuff
  30. 2007 Interns
  31. 2007 Proposal
  32. 2008 NSF Proposal
  33. 2009
  34. 2010
  35. 20101019 BlackRockCanyon
  36. 2011
  37. 20110131 OxfordPeak
  38. 20110626 MirriamLakeIdaho
  39. 201109 R1ProgressRep
  40. 201110 R1ProgressRep
  41. 201111 R1ProgressRep
  42. 201112 R1ProgressRep
  43. 2011 44MeV Analysis 2011
  44. 2011 NSF Proposal
  45. 2012
  46. 201201 R1ProgressRep
  47. 201202 R1ProgressRep
  48. 201203 R1ProgressRep
  49. 201204 R1ProgressRep
  50. 201205 R1ProgressRep
  51. 201206 R1ProgressRep
  52. 201207 R1ProgressRep
  53. 201208 R1ProgressRep
  54. 201209 R1ProgressRep
  55. 201210 R1ProgressRep
  56. 201211 R1ProgressRep
  57. 201212 R1ProgressRep
  58. 2012AnnihCountrRateEstimate
  59. 2012 NSF Proposal
  60. 2012 run DAQ malfunction
  61. 201301 R1ProgressRep
  62. 201302 R1ProgressRep
  63. 201303 R1ProgressRep
  64. 201304 R1ProgressRep
  65. 201305 R1ProgressRep
  66. 201306 R1ProgressRep
  67. 201307 R1ProgressRep
  68. 201308 R1ProgressRep
  69. 201309 R1ProgressRep
  70. 201310 R1ProgressRep
  71. 201311 R1ProgressRep
  72. 201312 R1ProgressRep
  73. 2013 MRI CLAS12 LeveL2Trig
  74. 201401 R1ProgressRep
  75. 201402 R1ProgressRep
  76. 201403 R1ProgressRep
  77. 2015 NSF Proposal
  78. 2018 NSF Proposal
  79. 2020 NSF Proposal
  80. 20min run peak sensing histograms
  81. 252CF
  82. 25MeV Neutron Detector Set-up
  83. 25MeV Neutron Detector Setup
  84. 25mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  85. 25mA, 100ns pulse width, 25cm from beam pipe
  86. 25mA, 100ns pulse width, 50cm from beam pipe
  87. 25mA, 100ns pulse width, 50cm from beam pipe, tungsten target with aluminum beamstop
  88. 2D Faraday Cup Data Analysis
  89. 2NCorr E1 E2 correlations VS theta abs
  90. 2NCorr Forward Detectors
  91. 2NCorr Photon flux estimate
  92. 2NCorr Rates 2017
  93. 2NCorr SPDP Introduction
  94. 2NCorr SP DP analysis
  95. 2NCorr neutron ToF cut
  96. 2 Bricks Fabrication
  97. 2 LTD bricks driver progress
  98. 2cm XLineTarg 270 Degree Rotation 09/23/16
  99. 2cm XLineTarg 90 Degree Rotation 09/23/16
  100. 2cm XYTarg Z=0 Vx and Vy Differences 09/23/16
  101. 2cm XZTarg Y=0 Vx and Vz Differences 09/23/16
  102. 2cm YLineTarg 0 Degree Rotation 09/23/16
  103. 2cm YLineTarg 180 Degree Rotation 09/23/16
  104. 2cm YLineTarg 210 Degree Rotation 09/23/16
  105. 2cm YLineTarg 30 Degree Rotation 09/23/16
  106. 2cm YZTarg X=0 Vz and Vy Difference 09/23/16
  107. 2nCor 44
  108. 2nCor Equipment
  109. 2n ASCII files
  110. 2n BKG data
  111. 2n Corr JeffsPlots
  112. 2n D2O/H2O/Empty target data
  113. 2n DU data
  114. 2n Detector efficiency test
  115. 2n Equipment
  116. 2n Neutron signal attenuation
  117. 2n Position resolution
  118. 2n TDC map
  119. 2n corr theta VS n-n energies
  120. 2n corr theta VS n-n energies (1)
  121. 2n corr theta VS n-n energies (2)
  122. 2n corr theta VS n-n energies (3)
  123. 2n corr theta VS n-n energies (4)
  124. 2n correlations
  125. 2n correlations in Photofission
  126. 2n geometry of the setup
  127. 2n opening angle
  128. 2n preliminary data analysis
  129. 2n run list
  130. 3N Corr
  131. 4-gradient
  132. 4-momenta
  133. 4-vectors
  134. 40MeV BeamLineInstall 10252013
  135. 44 Linac Exit Geometry
  136. 44 MeV Beam Line Optimization
  137. 44 Setup
  138. 5-19-08
  139. 511 keV photon attenuation in tungsten
  140. 5252017 Anal
  141. 52x48 Steel Table
  142. 5mA, 100ns pulse width, 100cm from beam pipe with Titanium window
  143. 6cm ZLineTarg 0 Degree Rotation 09/23/16
  144. 6cm ZLineTarg 270 Degree Rotation 09/23/16
  145. 6cm ZLineTarg 90 Degree Rotation 09/23/16
  146. 8-07-2017
  147. 8-08-2017
  148. 8-09-2017
  149. 8-10-2017
  150. 8-11-2017
  151. 8-14-2017
  152. 8-15-2017
  153. 8-16-2017
  154. 8-17-2017
  155. 8-18-2017
  156. 8 Channel CFD
  157. 90 degree beamline extension
  158. ACCAPP 09 PhotFis Poster
  159. ADBcrate CLAS12
  160. ADC
  161. ADC 3 Histogram Table
  162. ADC 7 Histogram Table
  163. ADS
  164. ASCII data files
  165. AW ADC 3 Histogram
  166. AW ADC 7 Histogram
  167. AW CLAS12R1
  168. AW Singles Prob Y88 2015
  169. A W CAA apparatus
  170. A W thesis
  171. A W thesis old
  172. A kind of analysis
  173. Absorbed Dose Information
  174. Abstract
  175. AccApp07
  176. Accelerator-Driven System
  177. Accelerator Driven Nuclear Reactor
  178. Accelerators Physics
  179. Accelerators Physics. Dr Kim Fall 2010
  180. Actinium Production
  181. Adding Apache Shares
  182. Admin Server
  183. Airline internet booking
  184. Airport Network Infrastructure
  185. Aka kaka
  186. Al subtracted ToF/Energy specrta
  187. All 3 detectors working
  188. All D2O Beam-down
  189. All D2O Beam-up
  190. Alpha Ionization
  191. Alpha particle simulation related
  192. Alter Phi Angles
  193. Altering Phi Angles
  194. Aluminum Converter
  195. Aluminum Thickness Tests
  196. Amex Promotion
  197. Analysis
  198. Analysis.groovy
  199. Analysis 03-26-2015
  200. Analysis of evio files
  201. Analysis of may 2017 runs
  202. Analysis scripts
  203. Angular distribution of neutrons from the photodisintegration of deuterium
  204. Anisotropic n's vs. isotropic ones
  205. Apartment
  206. Apex
  207. Api PubCLAS2000
  208. Apparatus Layout
  209. Apply, due: Jan 15 2014
  210. April
  211. April: Threshold Study
  212. April 17th 2017
  213. April 17th 2017 (PAA)
  214. Apt-Proxy
  215. ArCO2 IonizationPhysics
  216. Attenuation Measurements
  217. Attenuation Measurements NaI
  218. Au-196 5-08-22-13
  219. Au-196 Foil-08-22-13
  220. Aug 2017 ChkList
  221. August 10th 2017
  222. August 11th 2017
  223. August 14, 2007 - Cosmic Telescope
  224. August 14th 2017
  225. August 15, 2007 - Cosmic Telescope
  226. August 15th 2017
  227. August 16, 2007 - Cosmic Telescope
  228. August 17, 2007 - Cosmic Telescope
  229. August 23, 2007 - Cosmic Telescope
  230. August 24, 2007 - Cosmic Telescope
  231. August 27, 2007 - Cosmic Telescope
  232. August 28, 2007 - Cosmic Telescope
  233. August 29, 2007 - Cosmic Telescope
  234. August 30, 2007 - Cosmic Telescope
  235. August 31, 2007 - Cosmic Telescope
  236. August 8th 2017
  237. August 9th 2017
  238. B-field calculation
  239. BO-08-22-13
  240. BUILD GEMC SIMULATION.sh
  241. Back of the envelope calculation for e+/e- ratio
  242. Background
  243. BackupPC Notes
  244. Bayesian Nonparametrics
  245. BeamPipeHeating 4mmthick PbBi PositronTarget
  246. Beam Position Monitor Tests in HRRL
  247. Beam Test Apr 24 2012
  248. Beam Test Apr 26 2012
  249. Beam Test Jul 11 2012
  250. Beam Test Jul 12 2012

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)