Pages without language links

Jump to navigation Jump to search

The following pages do not link to other language versions.

Showing below up to 250 results in range #21 to #270.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. 05/10/2011
  2. 05/10/2011 source test continue
  3. 05/11/2011
  4. 05/11/2011 n's detector threshold calibration
  5. 05/11/2011 neutron detector threshold calibration
  6. 05/12/2011
  7. 05/12/2011 2n correlation test
  8. 05/12/2011 random coincidence cosmic test
  9. 05/13/2011 PS1 (Tiana) detector threshold calibration
  10. 05/13/2011 coincidence rate test (PS1+PS2 and PS1+PS2+Det1)
  11. 05/13/2011 coincidence test
  12. 05/13/2011 timing test
  13. 05/16/2011 coincidence test
  14. 05/19/2011 n's detector threshold calibration source/(w/source)
  15. 071213
  16. 08/21-22/13
  17. 09-07-2016
  18. 09-07-2017
  19. 09-08-2016
  20. 09-08-2017
  21. 09-09-2016
  22. 09-09-2017
  23. 09-10-2017
  24. 09-11-2017
  25. 09-14-2017
  26. 09-15-2017
  27. 09-16-2017
  28. 09-17-2017
  29. 09-18-2017
  30. 09/23-27/2013
  31. 09122012 JlabShipment
  32. 1-2-07 Tuning
  33. 1-8-08 PrelimResults
  34. 10-29-08 GEM HRRL Photon Runs
  35. 10-30-08 GEM HRRL Photon Runs
  36. 10-31-08 GEM HRRL Photon Runs
  37. 10/30/13 Mayir
  38. 1000 Events per degree in the range 5 to 40 degrees for Lab Frame
  39. 100mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  40. 100mA, 100ns pulse width, 25cm from beam pipe
  41. 10312013 TestRun
  42. 10mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  43. 11-10-2016
  44. 11-11-2016
  45. 11/21/2013 Be source
  46. 12-23-2016
  47. 12-GeV NSTAR
  48. 12/09/2013
  49. 12 10 2012 HRRL DetectorTests
  50. 137Cs Shot Log
  51. 170047 50% Se Soil Mixture Analysis
  52. 170048 10% Se Soil Mixture Analysis
  53. 170049 1% Se Soil Mixture Analysis
  54. 170050 0.1% Se Soil Mixture Analysis
  55. 1938:D2O Beam-down
  56. 1938:D2O Beam-down ND TOF
  57. 1938:D2O Beam-down ND TOF calibration
  58. 1938:D2O Beam-down ND energy
  59. 1938:D2O Beam-down ND energy neutronsOnly
  60. 1939:D2O Beam-down
  61. 1939:D2O Beam-down ND TOF
  62. 1939:D2O Beam-down ND TOF calibration
  63. 1939:D2O Beam-down ND energy
  64. 1939:D2O Beam-down ND energy neutronsOnly
  65. 1940:D2O Beam-down
  66. 1940:D2O Beam-down ND TOF
  67. 1940:D2O Beam-down ND TOF calibration
  68. 1940:D2O Beam-down ND energy
  69. 1940:D2O Beam-down ND energy neutronsOnly
  70. 1941:D2O Beam-up
  71. 1941:D2O Beam-up ND TOF
  72. 1941:D2O Beam-up ND TOF calibration
  73. 1941:D2O Beam-up ND energy
  74. 1941:D2O Beam-up ND energy neutronsOnly
  75. 1944:D2O Beam-down
  76. 1944:D2O Beam-down ND TOF
  77. 1944:D2O Beam-down ND TOF calibration
  78. 1944:D2O Beam-down ND energy
  79. 1944:D2O Beam-down ND energy neutronsOnly
  80. 1945:D2O Beam-up
  81. 1945:D2O Beam-up ND TOF
  82. 1945:D2O Beam-up ND TOF calibration
  83. 1945:D2O Beam-up ND energy
  84. 1945:D2O Beam-up ND energy neutronsOnly
  85. 1946:D2O Beam-up Rad-out
  86. 1946:D2O Beam-up Rad-out ND TOF
  87. 1946:D2O Beam-up Rad-out ND TOF calibration
  88. 1946:D2O Beam-up Rad-out ND energy
  89. 1946:D2O Beam-up Rad-out ND energy neutronsOnly
  90. 1947:H2O Beam-up
  91. 1947:H2O Beam-up ND TOF
  92. 1947:H2O Beam-up ND TOF calibration
  93. 1947:H2O Beam-up ND energy
  94. 1947:H2O Beam-up ND energy neutronsOnly
  95. 1948:H2O Beam-down
  96. 1948:H2O Beam-down ND TOF
  97. 1948:H2O Beam-down ND TOF calibration
  98. 1948:H2O Beam-down ND energy
  99. 1948:H2O Beam-down ND energy neutronsOnly
  100. 1949:DU
  101. 1949:DU ND TOF
  102. 1949:DU ND TOF calibration
  103. 1949:DU ND energy
  104. 1949:DU ND energy neutronsOnly
  105. 1 credit vs 9 credits
  106. 2-LTD-brick x-pinch driver
  107. 2-LTD-brick x-pinch driver notes
  108. 2-Neutron Correlation
  109. 2-Neutron Correlation Setup Stuff
  110. 2007 Interns
  111. 2007 Proposal
  112. 2008 NSF Proposal
  113. 2009
  114. 2010
  115. 20101019 BlackRockCanyon
  116. 2011
  117. 20110131 OxfordPeak
  118. 20110626 MirriamLakeIdaho
  119. 201109 R1ProgressRep
  120. 201110 R1ProgressRep
  121. 201111 R1ProgressRep
  122. 201112 R1ProgressRep
  123. 2011 44MeV Analysis 2011
  124. 2011 NSF Proposal
  125. 2012
  126. 201201 R1ProgressRep
  127. 201202 R1ProgressRep
  128. 201203 R1ProgressRep
  129. 201204 R1ProgressRep
  130. 201205 R1ProgressRep
  131. 201206 R1ProgressRep
  132. 201207 R1ProgressRep
  133. 201208 R1ProgressRep
  134. 201209 R1ProgressRep
  135. 201210 R1ProgressRep
  136. 201211 R1ProgressRep
  137. 201212 R1ProgressRep
  138. 2012AnnihCountrRateEstimate
  139. 2012 NSF Proposal
  140. 2012 run DAQ malfunction
  141. 201301 R1ProgressRep
  142. 201302 R1ProgressRep
  143. 201303 R1ProgressRep
  144. 201304 R1ProgressRep
  145. 201305 R1ProgressRep
  146. 201306 R1ProgressRep
  147. 201307 R1ProgressRep
  148. 201308 R1ProgressRep
  149. 201309 R1ProgressRep
  150. 201310 R1ProgressRep
  151. 201311 R1ProgressRep
  152. 201312 R1ProgressRep
  153. 2013 MRI CLAS12 LeveL2Trig
  154. 201401 R1ProgressRep
  155. 201402 R1ProgressRep
  156. 201403 R1ProgressRep
  157. 2015 NSF Proposal
  158. 2018 NSF Proposal
  159. 2020 NSF Proposal
  160. 20min run peak sensing histograms
  161. 252CF
  162. 25MeV Neutron Detector Set-up
  163. 25MeV Neutron Detector Setup
  164. 25mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  165. 25mA, 100ns pulse width, 25cm from beam pipe
  166. 25mA, 100ns pulse width, 50cm from beam pipe
  167. 25mA, 100ns pulse width, 50cm from beam pipe, tungsten target with aluminum beamstop
  168. 2D Faraday Cup Data Analysis
  169. 2NCorr E1 E2 correlations VS theta abs
  170. 2NCorr Forward Detectors
  171. 2NCorr Photon flux estimate
  172. 2NCorr Rates 2017
  173. 2NCorr SPDP Introduction
  174. 2NCorr SP DP analysis
  175. 2NCorr neutron ToF cut
  176. 2 Bricks Fabrication
  177. 2 LTD bricks driver progress
  178. 2cm XLineTarg 270 Degree Rotation 09/23/16
  179. 2cm XLineTarg 90 Degree Rotation 09/23/16
  180. 2cm XYTarg Z=0 Vx and Vy Differences 09/23/16
  181. 2cm XZTarg Y=0 Vx and Vz Differences 09/23/16
  182. 2cm YLineTarg 0 Degree Rotation 09/23/16
  183. 2cm YLineTarg 180 Degree Rotation 09/23/16
  184. 2cm YLineTarg 210 Degree Rotation 09/23/16
  185. 2cm YLineTarg 30 Degree Rotation 09/23/16
  186. 2cm YZTarg X=0 Vz and Vy Difference 09/23/16
  187. 2nCor 44
  188. 2nCor Equipment
  189. 2n ASCII files
  190. 2n BKG data
  191. 2n Corr JeffsPlots
  192. 2n D2O/H2O/Empty target data
  193. 2n DU data
  194. 2n Detector efficiency test
  195. 2n Equipment
  196. 2n Neutron signal attenuation
  197. 2n Position resolution
  198. 2n TDC map
  199. 2n corr theta VS n-n energies
  200. 2n corr theta VS n-n energies (1)
  201. 2n corr theta VS n-n energies (2)
  202. 2n corr theta VS n-n energies (3)
  203. 2n corr theta VS n-n energies (4)
  204. 2n correlations
  205. 2n correlations in Photofission
  206. 2n geometry of the setup
  207. 2n opening angle
  208. 2n preliminary data analysis
  209. 2n run list
  210. 3N Corr
  211. 4-gradient
  212. 4-momenta
  213. 4-vectors
  214. 40MeV BeamLineInstall 10252013
  215. 44 Linac Exit Geometry
  216. 44 MeV Beam Line Optimization
  217. 44 Setup
  218. 5-19-08
  219. 511 keV photon attenuation in tungsten
  220. 5252017 Anal
  221. 52x48 Steel Table
  222. 5mA, 100ns pulse width, 100cm from beam pipe with Titanium window
  223. 6cm ZLineTarg 0 Degree Rotation 09/23/16
  224. 6cm ZLineTarg 270 Degree Rotation 09/23/16
  225. 6cm ZLineTarg 90 Degree Rotation 09/23/16
  226. 8-07-2017
  227. 8-08-2017
  228. 8-09-2017
  229. 8-10-2017
  230. 8-11-2017
  231. 8-14-2017
  232. 8-15-2017
  233. 8-16-2017
  234. 8-17-2017
  235. 8-18-2017
  236. 8 Channel CFD
  237. 90 degree beamline extension
  238. ACCAPP 09 PhotFis Poster
  239. ADBcrate CLAS12
  240. ADC
  241. ADC 3 Histogram Table
  242. ADC 7 Histogram Table
  243. ADS
  244. ASCII data files
  245. AW ADC 3 Histogram
  246. AW ADC 7 Histogram
  247. AW CLAS12R1
  248. AW Singles Prob Y88 2015
  249. A W CAA apparatus
  250. A W thesis

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)