Difference between revisions of "Positrons"

From New IAC Wiki
Jump to navigation Jump to search
 
(97 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
http://www.8020.net/
 +
 +
= Liquid PbBi Target in Solenoid Magnetic Field =
 +
* [[Liquid PbBi Target in Solenoid Magnetic Field]]
 +
 
=Proposals=
 
=Proposals=
 
*[[Positrons_Using_The HRRL]]
 
*[[Positrons_Using_The HRRL]]
Line 18: Line 23:
 
* [[HRRL_Positron_Rotating_W_Target]]
 
* [[HRRL_Positron_Rotating_W_Target]]
 
* [[90 degree beamline extension]]
 
* [[90 degree beamline extension]]
 +
* [[Beamline design drawing]]
 +
* [[G4beamline_PbBi2015]]
  
 
==HRRL beam Line installation ==
 
==HRRL beam Line installation ==
Line 26: Line 33:
  
 
*[[HRRLPos_Timeline_Summary]]
 
*[[HRRLPos_Timeline_Summary]]
 +
 +
*[[HRRL_BeamLine_orders]]
 +
 +
*[[HRRL_Alignment_25Jun2012]]
  
 
==Experiments==
 
==Experiments==
 +
* [[HRRL_Experiment_Readiness_Chek_List]]
 
* [[CHIPS_Run_Feb-2008]]
 
* [[CHIPS_Run_Feb-2008]]
 
* [[CHIPS_Run_May-2008]]
 
* [[CHIPS_Run_May-2008]]
Line 40: Line 52:
 
* [[Coincidence_with_NaI_Detectors]]
 
* [[Coincidence_with_NaI_Detectors]]
 
* [[Beam_Test_Apr_24_2012]]
 
* [[Beam_Test_Apr_24_2012]]
 +
* [[Beam_Test_Apr_26_2012]]
 +
* [[Beam_Text_May_17_2012]]
 +
* [[HRRL_July_2012Run]]
 +
* [[HRRL_Dec_2012Run]]
 
* [[PePPO_2011Run]]
 
* [[PePPO_2011Run]]
 
* [[PePPO_2012Run]]
 
* [[PePPO_2012Run]]
Line 45: Line 61:
 
* [[PePPO_03132012]]
 
* [[PePPO_03132012]]
 
* [[PePPO_03242012]]
 
* [[PePPO_03242012]]
[[PEPPo_Software]]
+
* [[PePPO_05302012]]
 +
*[[12_10_2012_HRRL_DetectorTests]]
 +
*[[Positrons_Using_40Mev_Linac]]
 +
 
 +
[PEPPo_Software]]
  
 
==Simulations==
 
==Simulations==
Line 52: Line 72:
 
* [[HRRL Move_2010]]
 
* [[HRRL Move_2010]]
 
* [[Optimization of Positron Capturing]]
 
* [[Optimization of Positron Capturing]]
 +
* [[July2012PosSimulation]]
 +
* [[TF_G4Beamline]]
 +
* [[PePPO_Annih]]
 +
* [[G4Beamline_PbBi]]
  
 
=Equipment=
 
=Equipment=
Line 61: Line 85:
  
 
=References=
 
=References=
 +
*[[Jlab_Positro_Working_Group]]
 +
*[https://wiki.jlab.org/pwgwiki/index.php/Main_Page JLab Positron Working Group Wiki]
 +
*[https://wiki.iac.isu.edu/images/8/88/Sadiq_hesis_Latex.pdf Sadiq's Thesis]
 
* [https://positron.jlab.org/wiki/index.php/Main_Page JLab Positron Wiki]
 
* [https://positron.jlab.org/wiki/index.php/Main_Page JLab Positron Wiki]
 
* [[JPOS09]]
 
* [[JPOS09]]
Line 69: Line 96:
 
*[http://www.positronannihilation.net/index.htm Positron Annihilation]
 
*[http://www.positronannihilation.net/index.htm Positron Annihilation]
 
* Quad Scan Method [[File:Emit_Meas_DAFNE_Linac_e_Beam.pdf]]
 
* Quad Scan Method [[File:Emit_Meas_DAFNE_Linac_e_Beam.pdf]]
 +
*[[IPAC_2012]]
 +
 +
= Vendors =
 +
*[[HRRL_Positron_Vendors_Targets]]
 +
 +
= Calculations =
 +
[[ Positron_Yield_Estimate]]
 +
 +
[[511 keV photon attenuation in tungsten]]
  
 
==Neutron production==
 
==Neutron production==
Line 74: Line 110:
 
[[File:Huang_NIMB229_2005.pdf]]
 
[[File:Huang_NIMB229_2005.pdf]]
  
=MDC Parts list=
+
=Task list=
 
 
== Parts received ==
 
  
===Mar 10th 2012 ===
 
  
 
{| border="1"  |cellpadding="20" cellspacing="0  
 
{| border="1"  |cellpadding="20" cellspacing="0  
 
|-
 
|-
Part#  || Quantity ||  Discription || Link
+
Priority || task
 +
|-
 +
||   Order target chamber
 
|-
 
|-
450005  ||    1    ||  view port    ||
+
1||    Order 8 tungsten targets, 2 mm thick
 
|-
 
|-
110022 ||    1    || Blank off      ||
+
1 ||    Order cooling lines for target chamber
 
|-
 
|-
611005  ||    2     || feedthrough for cooling  ||
+
1||    Order 8 tungsten targets, 2 mm thick
 +
 
 
|-
 
|-
404048  ||    1    || Reduced T ||
+
2||    Build box to hold target motor controls, pull cables
 
|-
 
|-
|}
+
| 3|| enclose HRRL cavity with 1/4" lead
  
=== Apr 17th 2012 ===
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
 
|-
 
|-
| Part#  || Quantity || Discription || Link
+
| || check all connectors are in hand for target control
 +
|-
 +
| || check camera pulse trigger synchronization
 
|-
 
|-
| 450005  ||    1    ||  view port    ||  
+
| || check beam line alignment , are energy slits centered, is 90degree line going straight through wall
 
|-
 
|-
| 100021  ||   2    ||  Flng, 4.5"x2.5"Rotatable    ||
+
| || bolt last flange to girder after last set of quads
|}
 
 
 
 
 
=== Apr 23 2012 ===
 
 
 
Long beam pipe through the wall is ready.
 
 
 
 
 
==1. 4-6way cross for 45 degree line ==
 
 
 
1) 5 way cross for 45 degree.
 
 
 
2) Blank-off or view port. (If we borrow the view port 0 degree, we need to buy a blank-off for 0 degree.)
 
 
 
[[File:HRRL_order_45deg.png | 300 px]]
 
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
 
|-
 
|-
| Parts        || Quantity || Link
+
| || tungsten target holder for rotating target
 
|-
 
|-
| 5-way cross  ||    1     || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=406005 5-way cross]
+
| 1
 +
| | Ta or W re-conversion target for Flag 3
 +
 
 
|-
 
|-
| View Port  ||   1    || [http://www.huntvac.com/products.php?t=series&id=616 VPQ-300], quote from last time  [[File:hrrl-view-port-quote.pdf]]
+
|
 +
| | check flag 2 yag optics & setup, need way to switch internet between cameras so one computer can record images from each separately
 
|-
 
|-
| Blank off ||   1    || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=110022 Blank off]
+
|
 +
| | two sets of steering magnets for 90 degree line
 
|-
 
|-
|}
+
| || pull cable for FCC signals and fan out to control room and DAQ room
  
==2. 5-6 way cross for 90 degree line ==
 
  
[[File:HRRL_order_90deg.png | 1000 px]]
 
 
 
Do we need Faraday Cup at the end of 90 degree?
 
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
 
|-
 
|-
| Parts        || Quantity || Link
+
| in progress || Check the alignment.
|-  
+
|-
| 6-way cross ||   1    || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=407005 6-way cross]
+
| done || Find DAQ hard-wares from Dr. McNalty's lab.
 
|-
 
|-
| Faraday Cup ||   2 (1 for 45 degree and 1 for 90 degree)    ||[http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=9452000 Faraday Cup, Buy this one] [http://www.mdcvacuum.com/DisplayProductContent.aspx?d=MDC&p=i.4.5.2.1 Faraday Cup]
+
| done || Ask Chad to make FC cooler.
 
|-
 
|-
| Flanges 458 Non-rotatable ||  0 (We don't need any) ||  http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=110024
+
| in progres||  Work on Table design.
 
|-
 
|-
| View Port  ||   1    || [http://www.huntvac.com/products.php?t=series&id=616 VPQ-300], quote from last time [[File:hrrl-view-port-quote.pdf]]
+
| in progres|| Align YAG at the center of the 5-way cross.
 
|-
 
|-
|}
+
| || Check the JAI camera trigger and trig it synchronously with LED.
 
 
==4. Flanges for 90 degree beam line ==
 
 
 
 
 
{| border="1" |cellpadding="20" cellspacing="0
 
 
|-
 
|-
| Parts                    || Quantity || Link
+
| in progres|| Order W-targets -- Just order them online.
 
|-
 
|-
| Flng, 4.5"x2.5"Rotatable ||   2    || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=100021 Flange 450-250]
+
| done || Order Prosilica camera cable -- Waiting for the confirmation.
 
|-
 
|-
|}
+
| in progres|Install beam parts. (Ens, Flag2 Dipole2, Long beampipe, FC2, Flag2 gas.)
 
 
==5. Ion pump parts ==
 
 
 
Ion pump parts
 
 
 
{| border="1" |cellpadding="20" cellspacing="0
 
 
|-
 
|-
| Parts    |Parts Label || Quantity || Link
+
|  || Find W-Target and target holder.
 
|-
 
|-
| Reduced 3-way Cross (T) ||  ReducingTee, 4.5"x2.75" || 1 || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=404048 Reduced T]
+
| || Find a pipe (or 3-way cross) to replace 5-way cross.
 
|-
 
|-
 +
|  || Install 45-deg Flag to W-target position.
 
|}
 
|}
  
==6. Target chamber parts ==
+
= Things to do for the next run =
  
Target chamber parts (HV = 10^{-8} Torr)
+
1. W target holder and W target desinge
  
a.) 10- pin wiring feedthrough
+
2. hose from copper cooling lines to feedtrough. (swagelok, simlar with target cooling).
  
http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.1.1.2.1
+
3. chamber: 6 week lead time.
  
b.) 4 flexible hoses for cooling lines (at least nitrogen gas hopefully liquid nitrogen)
+
4. cooling connection, check valve, nitrogen bottles, plastic pipes.
  
http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=m.6.2.4.1
+
5. light emitting diode and detecting photo diode.
  
c.) IR optical window for target temperature measurement
+
6. theromo-copler to on the things to monitor temperture. (thermestors glue on copper line, stanless steel line). thermestors need to be in the range of the parts they are on. Check the document of the motor for its temperature range.
  
http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.7.1.1.1
 
  
{| border="1"  |cellpadding="20" cellspacing="0
+
=[[Positron_Emon_Paper]]=
|-
 
| Parts    || Quantity || Link
 
|-
 
|  10 - pin wiring feedthrough ||  || [http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.1.1.2.1 Pin Through]
 
  
|-
+
=[[LBE_Paper]]=
| 4 flexible hoses for cooling lines  ||  || [http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=m.6.2.4.1 Cooling Hoses]
 
|-
 
| IR optical window  ||  || [http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.7.1.1.1 Optical Window]
 
|-
 
|}
 
  
 
[[User_talk:foretony]]
 
[[User_talk:foretony]]

Latest revision as of 19:41, 16 December 2016

http://www.8020.net/

Liquid PbBi Target in Solenoid Magnetic Field

Proposals

Collaboration

Work

Designs

HRRL beam Line installation

Experiments

[PEPPo_Software]]

Simulations

Equipment

References

Vendors

Calculations

Positron_Yield_Estimate

511 keV photon attenuation in tungsten

Neutron production

File:Huang NIMB229 2005.pdf

Task list

Priority task
1 Order target chamber
1 Order 8 tungsten targets, 2 mm thick
1 Order cooling lines for target chamber
1 Order 8 tungsten targets, 2 mm thick
2 Build box to hold target motor controls, pull cables
3 enclose HRRL cavity with 1/4" lead
check all connectors are in hand for target control
check camera pulse trigger synchronization
check beam line alignment , are energy slits centered, is 90degree line going straight through wall
bolt last flange to girder after last set of quads
tungsten target holder for rotating target
1 Ta or W re-conversion target for Flag 3
check flag 2 yag optics & setup, need way to switch internet between cameras so one computer can record images from each separately
two sets of steering magnets for 90 degree line
pull cable for FCC signals and fan out to control room and DAQ room


in progress Check the alignment.
done Find DAQ hard-wares from Dr. McNalty's lab.
done Ask Chad to make FC cooler.
in progres Work on Table design.
in progres Align YAG at the center of the 5-way cross.
Check the JAI camera trigger and trig it synchronously with LED.
in progres Order W-targets -- Just order them online.
done Order Prosilica camera cable -- Waiting for the confirmation.
in progres Install beam parts. (Ens, Flag2 Dipole2, Long beampipe, FC2, Flag2 gas.)
Find W-Target and target holder.
Find a pipe (or 3-way cross) to replace 5-way cross.
Install 45-deg Flag to W-target position.

Things to do for the next run

1. W target holder and W target desinge

2. hose from copper cooling lines to feedtrough. (swagelok, simlar with target cooling).

3. chamber: 6 week lead time.

4. cooling connection, check valve, nitrogen bottles, plastic pipes.

5. light emitting diode and detecting photo diode.

6. theromo-copler to on the things to monitor temperture. (thermestors glue on copper line, stanless steel line). thermestors need to be in the range of the parts they are on. Check the document of the motor for its temperature range.


Positron_Emon_Paper

LBE_Paper

User_talk:foretony


User:Setisadi