Difference between revisions of "Positrons"

From New IAC Wiki
Jump to navigation Jump to search
 
(42 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
http://www.8020.net/
 +
 +
= Liquid PbBi Target in Solenoid Magnetic Field =
 +
* [[Liquid PbBi Target in Solenoid Magnetic Field]]
 +
 
=Proposals=
 
=Proposals=
 
*[[Positrons_Using_The HRRL]]
 
*[[Positrons_Using_The HRRL]]
Line 18: Line 23:
 
* [[HRRL_Positron_Rotating_W_Target]]
 
* [[HRRL_Positron_Rotating_W_Target]]
 
* [[90 degree beamline extension]]
 
* [[90 degree beamline extension]]
 +
* [[Beamline design drawing]]
 +
* [[G4beamline_PbBi2015]]
  
 
==HRRL beam Line installation ==
 
==HRRL beam Line installation ==
Line 26: Line 33:
  
 
*[[HRRLPos_Timeline_Summary]]
 
*[[HRRLPos_Timeline_Summary]]
 +
 +
*[[HRRL_BeamLine_orders]]
 +
 +
*[[HRRL_Alignment_25Jun2012]]
  
 
==Experiments==
 
==Experiments==
Line 43: Line 54:
 
* [[Beam_Test_Apr_26_2012]]
 
* [[Beam_Test_Apr_26_2012]]
 
* [[Beam_Text_May_17_2012]]
 
* [[Beam_Text_May_17_2012]]
 +
* [[HRRL_July_2012Run]]
 +
* [[HRRL_Dec_2012Run]]
 
* [[PePPO_2011Run]]
 
* [[PePPO_2011Run]]
 
* [[PePPO_2012Run]]
 
* [[PePPO_2012Run]]
Line 49: Line 62:
 
* [[PePPO_03242012]]
 
* [[PePPO_03242012]]
 
* [[PePPO_05302012]]
 
* [[PePPO_05302012]]
 +
*[[12_10_2012_HRRL_DetectorTests]]
 +
*[[Positrons_Using_40Mev_Linac]]
  
 
[PEPPo_Software]]
 
[PEPPo_Software]]
Line 57: Line 72:
 
* [[HRRL Move_2010]]
 
* [[HRRL Move_2010]]
 
* [[Optimization of Positron Capturing]]
 
* [[Optimization of Positron Capturing]]
 +
* [[July2012PosSimulation]]
 +
* [[TF_G4Beamline]]
 +
* [[PePPO_Annih]]
 +
* [[G4Beamline_PbBi]]
  
 
=Equipment=
 
=Equipment=
Line 66: Line 85:
  
 
=References=
 
=References=
 +
*[[Jlab_Positro_Working_Group]]
 +
*[https://wiki.jlab.org/pwgwiki/index.php/Main_Page JLab Positron Working Group Wiki]
 +
*[https://wiki.iac.isu.edu/images/8/88/Sadiq_hesis_Latex.pdf Sadiq's Thesis]
 
* [https://positron.jlab.org/wiki/index.php/Main_Page JLab Positron Wiki]
 
* [https://positron.jlab.org/wiki/index.php/Main_Page JLab Positron Wiki]
 
* [[JPOS09]]
 
* [[JPOS09]]
Line 75: Line 97:
 
* Quad Scan Method [[File:Emit_Meas_DAFNE_Linac_e_Beam.pdf]]
 
* Quad Scan Method [[File:Emit_Meas_DAFNE_Linac_e_Beam.pdf]]
 
*[[IPAC_2012]]
 
*[[IPAC_2012]]
 +
 +
= Vendors =
 +
*[[HRRL_Positron_Vendors_Targets]]
  
 
= Calculations =
 
= Calculations =
 
[[ Positron_Yield_Estimate]]
 
[[ Positron_Yield_Estimate]]
 +
 +
[[511 keV photon attenuation in tungsten]]
  
 
==Neutron production==
 
==Neutron production==
Line 125: Line 152:
 
|-
 
|-
 
| || pull cable for FCC signals and fan out to control room and DAQ room
 
| || pull cable for FCC signals and fan out to control room and DAQ room
|}
 
  
=MDC Parts list=
 
  
== Parts received ==
 
 
===Mar 10th 2012 ===
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
 
|-
 
|-
| Part#  || Quantity ||  Discription || Link
+
| in progress || Check the alignment.
 
|-
 
|-
| 450005  ||   1    ||  view port    || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=450005 big viewport for corosses]
+
| done || Find DAQ hard-wares from Dr. McNalty's lab.
 
|-
 
|-
| 110022  ||   1    || Blank off      || [http://www.mdcvacuum.com/Search.aspx?q=110022 Blank off]
+
| done || Ask Chad to make FC cooler.
 
|-
 
|-
| 611005  ||    2    || feedthrough for cooling || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=611005 feedthrough for cooling]
+
| in progres||  Work on Table design.
 
|-
 
|-
| 404048  ||   1    || Reduced T || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=404048 reduec T for ion pump]
+
| in progres|| Align YAG at the center of the 5-way cross.
 
|-
 
|-
|}
+
| || Check the JAI camera trigger and trig it synchronously with LED.
 
 
=== Apr 17th 2012 ===
 
 
 
{| border="1" |cellpadding="20" cellspacing="0
 
 
|-
 
|-
| Part#  || Quantity ||  Discription || Link
+
| in progres||  Order W-targets -- Just order them online.
 
|-
 
|-
| 450005  ||    1    ||  view port    || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=450005 big viewport for corosses]
+
| done ||  Order Prosilica camera cable -- Waiting for the confirmation.
 
|-
 
|-
| 100021  ||    2    ||  Flng, 4.5"x2.5"Rotatable    || [http://www.mdcvacuum.com/Search.aspx?q=100021 long beam pipe flanges]
+
| in progres||  Install beam parts. (Ens, Flag2 Dipole2, Long beampipe, FC2, Flag2 gas.)
|}
 
 
 
=== Apr 23 2012 ===
 
 
 
Long beam pipe through the wall is ready.
 
 
 
 
 
=== Apr 30th 2012 ===
 
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
 
|-
 
|-
Part#  || Quantity ||  Discription
+
|  || Find W-Target and target holder.
 
|-
 
|-
|    ||    1    |Installation kit for chaber vacuum window   
+
|  || Find a pipe (or 3-way cross) to replace 5-way cross.
|}
 
 
 
 
 
 
 
=== May 14th 2012 ===
 
 
 
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
 
|-
 
|-
Part#  || Quantity ||  Discription || Link
+
|  || Install 45-deg Flag to W-target position.
|-
 
|  9712007  ||    1    ||  Viewport for vaccum chamber    || [http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.7.1.1.1 viewport]
 
 
|}
 
|}
  
=== May 18th 2012 ===
+
= Things to do for the next run =
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
|-
 
|  Part#  || Quantity ||  Discription || Link
 
|-
 
| 407005    ||    1    ||  6-way cross for Flag 3  || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=407005 6-way cross]
 
|-
 
| 9132004  ||    1    ||  10 pin electric feed through    || [http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.1.1.2.1 feed through]
 
|}
 
  
=== May 26th 2012 ===
+
1. W target holder and W target desinge
2 Faraday cups
 
  
== Parts expecting ==
+
2. hose from copper cooling lines to feedtrough. (swagelok, simlar with target cooling).
  
1) One 5 way cross;
+
3. chamber: 6 week lead time.
  
==1. 4-6way cross for 45 degree line ==
+
4. cooling connection, check valve, nitrogen bottles, plastic pipes.
  
1) 5 way cross for 45 degree.
+
5. light emitting diode and detecting photo diode.
  
2) Blank-off or view port. (If we borrow the view port 0 degree, we need to buy a blank-off for 0 degree.)
+
6. theromo-copler to on the things to monitor temperture. (thermestors glue on copper line, stanless steel line). thermestors need to be in the range of the parts they are on. Check the document of the motor for its temperature range.
  
[[File:HRRL_order_45deg.png | 300 px]]
 
  
{| border="1"  |cellpadding="20" cellspacing="0
+
=[[Positron_Emon_Paper]]=
|-
 
| Parts        || Quantity || Link || Delevary status
 
|-
 
| 5-way cross  ||    1    || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=406005 5-way cross] ||
 
|-
 
| View Port  ||    1    || [http://www.huntvac.com/products.php?t=series&id=616 VPQ-300], quote from last time  [[File:hrrl-view-port-quote.pdf]] This item chaged to [[http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=450005 MDC viewport for corosses]] || Delevered
 
|-
 
|  Blank off ||    1    || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=110022 Blank off] || Delevered
 
|-
 
|}
 
  
==2. 5-6 way cross for 90 degree line ==
+
=[[LBE_Paper]]=
 
 
[[File:HRRL_order_90deg.png | 500 px]]
 
 
 
 
 
Do we need Faraday Cup at the end of 90 degree?
 
 
 
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
|-
 
| Parts        || Quantity || Link || Delevary status
 
|-
 
|  6-way cross ||  1    || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=407005 6-way cross] ||
 
|-
 
|  Faraday Cup ||  2 (1 for 45 degree and 1 for 90 degree)    ||[http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=9452000 Faraday Cup, Buy this one] [http://www.mdcvacuum.com/DisplayProductContent.aspx?d=MDC&p=i.4.5.2.1 Faraday Cup] ||
 
|-
 
| View Port  ||    1    || [http://www.huntvac.com/products.php?t=series&id=616 VPQ-300], quote from last time  [[File:hrrl-view-port-quote.pdf]] This item chaged to [[http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=450005 MDC viewport for corosses]] || Delevered
 
|-
 
|}
 
 
 
==4. Flanges for 90 degree beam line ==
 
 
 
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
|-
 
| Parts                    || Quantity || Link || Deleveray status
 
|-
 
| Flng, 4.5"x2.5"Rotatable ||    2    || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=100021 Flange 450-250] || Delevered
 
|-
 
|}
 
 
 
==5. Ion pump parts ==
 
 
 
Ion pump parts
 
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
|-
 
| Parts    ||  Parts Label || Quantity || Link || Delevaray status
 
|-
 
| Reduced 3-way Cross (T)  ||  ReducingTee, 4.5"x2.75" || 1 || [http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=404048 Reduced T] || Delevared.
 
|-
 
|}
 
 
 
==6. Target chamber parts ==
 
 
 
Target chamber parts (HV = 10^{-8} Torr)
 
 
 
a.) 10- pin wiring feedthrough
 
 
 
http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.1.1.2.1
 
 
 
b.) 4 flexible hoses for cooling lines (at least nitrogen gas hopefully liquid nitrogen)
 
 
 
http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=m.6.2.4.1
 
 
 
c.) IR optical window for target temperature measurement
 
 
 
http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.7.1.1.1
 
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
|-
 
| Parts    || Quantity || Link || Delevary status
 
|-
 
|  10 - pin wiring feedthrough || 1 || [http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.1.1.2.1 Pin Through] ||
 
 
 
|-
 
| 4 flexible hoses for cooling lines  ||  2 || [http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=m.6.2.4.1 Cooling Hoses] || deleraved
 
|-
 
| IR optical window  || 1  || [http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.7.1.1.1 Optical Window] || delevared
 
|-
 
|}
 
  
 
[[User_talk:foretony]]
 
[[User_talk:foretony]]

Latest revision as of 19:41, 16 December 2016

http://www.8020.net/

Liquid PbBi Target in Solenoid Magnetic Field

Proposals

Collaboration

Work

Designs

HRRL beam Line installation

Experiments

[PEPPo_Software]]

Simulations

Equipment

References

Vendors

Calculations

Positron_Yield_Estimate

511 keV photon attenuation in tungsten

Neutron production

File:Huang NIMB229 2005.pdf

Task list

Priority task
1 Order target chamber
1 Order 8 tungsten targets, 2 mm thick
1 Order cooling lines for target chamber
1 Order 8 tungsten targets, 2 mm thick
2 Build box to hold target motor controls, pull cables
3 enclose HRRL cavity with 1/4" lead
check all connectors are in hand for target control
check camera pulse trigger synchronization
check beam line alignment , are energy slits centered, is 90degree line going straight through wall
bolt last flange to girder after last set of quads
tungsten target holder for rotating target
1 Ta or W re-conversion target for Flag 3
check flag 2 yag optics & setup, need way to switch internet between cameras so one computer can record images from each separately
two sets of steering magnets for 90 degree line
pull cable for FCC signals and fan out to control room and DAQ room


in progress Check the alignment.
done Find DAQ hard-wares from Dr. McNalty's lab.
done Ask Chad to make FC cooler.
in progres Work on Table design.
in progres Align YAG at the center of the 5-way cross.
Check the JAI camera trigger and trig it synchronously with LED.
in progres Order W-targets -- Just order them online.
done Order Prosilica camera cable -- Waiting for the confirmation.
in progres Install beam parts. (Ens, Flag2 Dipole2, Long beampipe, FC2, Flag2 gas.)
Find W-Target and target holder.
Find a pipe (or 3-way cross) to replace 5-way cross.
Install 45-deg Flag to W-target position.

Things to do for the next run

1. W target holder and W target desinge

2. hose from copper cooling lines to feedtrough. (swagelok, simlar with target cooling).

3. chamber: 6 week lead time.

4. cooling connection, check valve, nitrogen bottles, plastic pipes.

5. light emitting diode and detecting photo diode.

6. theromo-copler to on the things to monitor temperture. (thermestors glue on copper line, stanless steel line). thermestors need to be in the range of the parts they are on. Check the document of the motor for its temperature range.


Positron_Emon_Paper

LBE_Paper

User_talk:foretony


User:Setisadi