Difference between revisions of "Positrons"

From New IAC Wiki
Jump to navigation Jump to search
 
(172 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
http://www.8020.net/
 +
 +
= Liquid PbBi Target in Solenoid Magnetic Field =
 +
* [[Liquid PbBi Target in Solenoid Magnetic Field]]
 +
 
=Proposals=
 
=Proposals=
 
*[[Positrons_Using_The HRRL]]
 
*[[Positrons_Using_The HRRL]]
Line 18: Line 23:
 
* [[HRRL_Positron_Rotating_W_Target]]
 
* [[HRRL_Positron_Rotating_W_Target]]
 
* [[90 degree beamline extension]]
 
* [[90 degree beamline extension]]
 +
* [[Beamline design drawing]]
 +
* [[G4beamline_PbBi2015]]
  
 
==HRRL beam Line installation ==
 
==HRRL beam Line installation ==
Line 26: Line 33:
  
 
*[[HRRLPos_Timeline_Summary]]
 
*[[HRRLPos_Timeline_Summary]]
 +
 +
*[[HRRL_BeamLine_orders]]
 +
 +
*[[HRRL_Alignment_25Jun2012]]
  
 
==Experiments==
 
==Experiments==
 +
* [[HRRL_Experiment_Readiness_Chek_List]]
 
* [[CHIPS_Run_Feb-2008]]
 
* [[CHIPS_Run_Feb-2008]]
 
* [[CHIPS_Run_May-2008]]
 
* [[CHIPS_Run_May-2008]]
Line 39: Line 51:
 
* [[IAC_NaI_Detectors]]
 
* [[IAC_NaI_Detectors]]
 
* [[Coincidence_with_NaI_Detectors]]
 
* [[Coincidence_with_NaI_Detectors]]
 +
* [[Beam_Test_Apr_24_2012]]
 +
* [[Beam_Test_Apr_26_2012]]
 +
* [[Beam_Text_May_17_2012]]
 +
* [[HRRL_July_2012Run]]
 +
* [[HRRL_Dec_2012Run]]
 
* [[PePPO_2011Run]]
 
* [[PePPO_2011Run]]
 
* [[PePPO_2012Run]]
 
* [[PePPO_2012Run]]
 
* [[PePPO_02222012]]
 
* [[PePPO_02222012]]
 +
* [[PePPO_03132012]]
 +
* [[PePPO_03242012]]
 +
* [[PePPO_05302012]]
 +
*[[12_10_2012_HRRL_DetectorTests]]
 +
*[[Positrons_Using_40Mev_Linac]]
 +
 +
[PEPPo_Software]]
  
 
==Simulations==
 
==Simulations==
Line 48: Line 72:
 
* [[HRRL Move_2010]]
 
* [[HRRL Move_2010]]
 
* [[Optimization of Positron Capturing]]
 
* [[Optimization of Positron Capturing]]
 +
* [[July2012PosSimulation]]
 +
* [[TF_G4Beamline]]
 +
* [[PePPO_Annih]]
 +
* [[G4Beamline_PbBi]]
  
 
=Equipment=
 
=Equipment=
Line 57: Line 85:
  
 
=References=
 
=References=
 +
*[[Jlab_Positro_Working_Group]]
 +
*[https://wiki.jlab.org/pwgwiki/index.php/Main_Page JLab Positron Working Group Wiki]
 +
*[https://wiki.iac.isu.edu/images/8/88/Sadiq_hesis_Latex.pdf Sadiq's Thesis]
 
* [https://positron.jlab.org/wiki/index.php/Main_Page JLab Positron Wiki]
 
* [https://positron.jlab.org/wiki/index.php/Main_Page JLab Positron Wiki]
 
* [[JPOS09]]
 
* [[JPOS09]]
Line 63: Line 94:
 
*[[File:SadiqTalkPePPO_4-26-2011.pdf]]
 
*[[File:SadiqTalkPePPO_4-26-2011.pdf]]
 
*[[e+ Gun Beam Line Construction]]
 
*[[e+ Gun Beam Line Construction]]
 +
*[http://www.positronannihilation.net/index.htm Positron Annihilation]
 +
* Quad Scan Method [[File:Emit_Meas_DAFNE_Linac_e_Beam.pdf]]
 +
*[[IPAC_2012]]
  
==Neutron production==
+
= Vendors =
 +
*[[HRRL_Positron_Vendors_Targets]]
  
[[File:Huang_NIMB229_2005.pdf]]
+
= Calculations =
 +
[[ Positron_Yield_Estimate]]
  
 +
[[511 keV photon attenuation in tungsten]]
  
=MDC Parts list=
+
==Neutron production==
  
 +
[[File:Huang_NIMB229_2005.pdf]]
  
== 1. Flanges for 90 degree beam line ==
+
=Task list=
  
=== 450-250 ===
 
  
100021 - Flng, 4.5"x2.5"Rotatable
+
{| border="1"  |cellpadding="20" cellspacing="0
 +
|-
 +
|  Priority || task
 +
|-
 +
|  1  ||    Order target chamber
 +
|-
 +
|  1||    Order 8 tungsten targets, 2 mm thick
 +
|-
 +
|  1  ||    Order cooling lines for target chamber
 +
|-
 +
|  1||    Order 8 tungsten targets, 2 mm thick
  
# MODEL REFERENCE: REF# F450250R
+
|-
 +
|  2||    Build box to hold target motor controls, pull cables
 +
|-
 +
| 3|| enclose HRRL cavity with 1/4" lead
  
# PART NUMBER: 100021
+
|-
 +
| || check all connectors are in hand for target control
 +
|-
 +
| || check camera pulse trigger synchronization
 +
|-
 +
| || check beam line alignment , are energy slits centered, is 90degree line going straight through wall
 +
|-
 +
| || bolt last flange to girder after last set of quads
 +
|-
 +
| || tungsten target holder for rotating target
 +
|-
 +
| 1
 +
| | Ta or W re-conversion target for Flag 3
  
# PART NAME: Flng, 4.5"x2.5"Rotatable
+
|-
 +
|
 +
| | check flag 2 yag optics & setup, need way to switch internet between cameras so one computer can record images from each separately
 +
|-
 +
|
 +
| | two sets of steering magnets for 90 degree line
 +
|-
 +
| || pull cable for FCC signals and fan out to control room and DAQ room
  
http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=100021
 
  
Quantity needed: 1
 
 
=== 458-250 ===
 
 
# MODEL REFERENCE: REF# F458250R
 
 
# PART NUMBER: 100023
 
 
# PART NAME: Flng, 4.58"x2.5"Rotatable
 
 
http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=100023
 
 
Quantity needed: 1
 
 
== 4-6way cross ==
 
 
5 cross for the 45 degree beam line flag
 
 
http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=406005
 
 
Quantity needed: 1
 
 
== 3 Ion pump parts ==
 
 
Ion pump parts
 
 
{| border="1"  |cellpadding="20" cellspacing="0
 
 
|-
 
|-
| Parts    ||  Parts Label || Quantity || Link
+
| in progress || Check the alignment.
 +
|-
 +
| done || Find DAQ hard-wares from Dr. McNalty's lab.
 +
|-
 +
| done ||  Ask Chad to make FC cooler.
 +
|-
 +
| in progres||  Work on Table design.
 +
|-
 +
| in progres||  Align YAG at the center of the 5-way cross.
 +
|-
 +
| ||  Check the JAI camera trigger and trig it synchronously with LED.
 +
|-
 +
| in progres|| Order W-targets -- Just order them online.
 
|-
 
|-
3-way cross (T)  || TE-450  || 1 || http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=404038
+
| done |Order Prosilica camera cable -- Waiting for the confirmation.
 
|-
 
|-
| Flange (8 hole)  ||  F450-250R || 2 || http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=100021
+
| in progres||  Install beam parts. (Ens, Flag2 Dipole2, Long beampipe, FC2, Flag2 gas.)
 
|-
 
|-
| Bellow || FX-450 || 1 || http://www.mdcvacuum.com/DisplayPart.aspx?d=MDC&p=400005
+
|  || Find W-Target and target holder.
 
|-
 
|-
| Adapter || A800X450T || 1 ||
+
|  || Find a pipe (or 3-way cross) to replace 5-way cross.
 
|-
 
|-
 +
|  || Install 45-deg Flag to W-target position.
 
|}
 
|}
  
== 4 ==
+
= Things to do for the next run =
 +
 
 +
1. W target holder and W target desinge
 +
 
 +
2. hose from copper cooling lines to feedtrough. (swagelok, simlar with target cooling).
 +
 
 +
3. chamber: 6 week lead time.
  
4.) Target chamber parts (HV = 10^{-8} Torr)
+
4. cooling connection, check valve, nitrogen bottles, plastic pipes.
  
a.) 10- pin wiring feedthrough
+
5. light emitting diode and detecting photo diode.
  
http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.1.1.2.1
+
6. theromo-copler to on the things to monitor temperture. (thermestors glue on copper line, stanless steel line). thermestors need to be in the range of the parts they are on. Check the document of the motor for its temperature range.
  
b.) 4 flexible hoses for cooling lines (at least nitrogen gas hopefully liquid nitrogen)
 
  
c.) IR optical window for target temperature measurement
+
=[[Positron_Emon_Paper]]=
  
 +
=[[LBE_Paper]]=
  
 
[[User_talk:foretony]]
 
[[User_talk:foretony]]

Latest revision as of 19:41, 16 December 2016

http://www.8020.net/

Liquid PbBi Target in Solenoid Magnetic Field

Proposals

Collaboration

Work

Designs

HRRL beam Line installation

Experiments

[PEPPo_Software]]

Simulations

Equipment

References

Vendors

Calculations

Positron_Yield_Estimate

511 keV photon attenuation in tungsten

Neutron production

File:Huang NIMB229 2005.pdf

Task list

Priority task
1 Order target chamber
1 Order 8 tungsten targets, 2 mm thick
1 Order cooling lines for target chamber
1 Order 8 tungsten targets, 2 mm thick
2 Build box to hold target motor controls, pull cables
3 enclose HRRL cavity with 1/4" lead
check all connectors are in hand for target control
check camera pulse trigger synchronization
check beam line alignment , are energy slits centered, is 90degree line going straight through wall
bolt last flange to girder after last set of quads
tungsten target holder for rotating target
1 Ta or W re-conversion target for Flag 3
check flag 2 yag optics & setup, need way to switch internet between cameras so one computer can record images from each separately
two sets of steering magnets for 90 degree line
pull cable for FCC signals and fan out to control room and DAQ room


in progress Check the alignment.
done Find DAQ hard-wares from Dr. McNalty's lab.
done Ask Chad to make FC cooler.
in progres Work on Table design.
in progres Align YAG at the center of the 5-way cross.
Check the JAI camera trigger and trig it synchronously with LED.
in progres Order W-targets -- Just order them online.
done Order Prosilica camera cable -- Waiting for the confirmation.
in progres Install beam parts. (Ens, Flag2 Dipole2, Long beampipe, FC2, Flag2 gas.)
Find W-Target and target holder.
Find a pipe (or 3-way cross) to replace 5-way cross.
Install 45-deg Flag to W-target position.

Things to do for the next run

1. W target holder and W target desinge

2. hose from copper cooling lines to feedtrough. (swagelok, simlar with target cooling).

3. chamber: 6 week lead time.

4. cooling connection, check valve, nitrogen bottles, plastic pipes.

5. light emitting diode and detecting photo diode.

6. theromo-copler to on the things to monitor temperture. (thermestors glue on copper line, stanless steel line). thermestors need to be in the range of the parts they are on. Check the document of the motor for its temperature range.


Positron_Emon_Paper

LBE_Paper

User_talk:foretony


User:Setisadi