Positrons
Proposals
Collaboration
Work
Designs
- IAC positron beamline
- OptiM32_HRRL_PositronDesign
- Beamline design (G. Stancari)
- Beamline design (Y. Kim)
- Beamline_Drawing_2011_J.Ellis
- HRRL_Positron_Rotating_W_Target
- 90 degree beamline extension
HRRL beam Line installation
Experiments
- HRRL_Experiment_Readiness_Chek_List
- CHIPS_Run_Feb-2008
- CHIPS_Run_May-2008
- HRRL radiation tests
- Emittance Test
- HRRL OTR Test Feb 16th 2011
- HRRL OTR Test Mar 3rd 2011
- HRRL_Emittance_Measurements_March14-18-2011
- Emittance Measurement with Optical transition Radiation (OTR)
- PePPO_NaI_PositronDetector_4_JLab
- IAC_NaI_Detectors
- Coincidence_with_NaI_Detectors
- Beam_Test_Apr_24_2012
- Beam_Test_Apr_26_2012
- Beam_Text_May_17_2012
- HRRL_July_2012Run
- PePPO_2011Run
- PePPO_2012Run
- PePPO_02222012
- PePPO_03132012
- PePPO_03242012
- PePPO_05302012
[PEPPo_Software]]
Simulations
- HRRL radiation footprint simulations
- HRRL Move_2010
- Optimization of Positron Capturing
- July2012PosSimulation
Equipment
References
- JLab Positron Wiki
- JPOS09
- Positron_References
- Python
- File:SadiqTalkPePPO 4-26-2011.pdf
- e+ Gun Beam Line Construction
- Positron Annihilation
- Quad Scan Method File:Emit Meas DAFNE Linac e Beam.pdf
- IPAC_2012
Vendors
Calculations
Neutron production
Task list
Priority | task |
1 | Order target chamber |
1 | Order 8 tungsten targets, 2 mm thick |
1 | Order cooling lines for target chamber |
1 | Order 8 tungsten targets, 2 mm thick |
2 | Build box to hold target motor controls, pull cables |
3 | enclose HRRL cavity with 1/4" lead |
check all connectors are in hand for target control | |
check camera pulse trigger synchronization | |
check beam line alignment , are energy slits centered, is 90degree line going straight through wall | |
bolt last flange to girder after last set of quads | |
tungsten target holder for rotating target | |
1 | Ta or W re-conversion target for Flag 3 |
check flag 2 yag optics & setup, need way to switch internet between cameras so one computer can record images from each separately | |
two sets of steering magnets for 90 degree line | |
pull cable for FCC signals and fan out to control room and DAQ room
| |
in progress | Check the alignment. |
done | Find DAQ hard-wares from Dr. McNalty's lab. |
done | Ask Chad to make FC cooler. |
in progres | Work on Table design. |
in progres | Align YAG at the center of the 5-way cross. |
Check the JAI camera trigger and trig it synchronously with LED. | |
in progres | Order W-targets -- Just order them online. |
done | Order Prosilica camera cable -- Waiting for the confirmation. |
in progres | Install beam parts. (Ens, Flag2 Dipole2, Long beampipe, FC2, Flag2 gas.) |
Find W-Target and target holder. | |
Find a pipe (or 3-way cross) to replace 5-way cross. | |
Install 45-deg Flag to W-target position. |