Difference between revisions of "Positrons"

From New IAC Wiki
Jump to navigation Jump to search
Line 88: Line 88:
  
 
==2. 5-6 way cross for 90 degree line ==
 
==2. 5-6 way cross for 90 degree line ==
 +
 +
Do we need Faraday Cup at the end of 90 degree?
  
 
We have one 3-way cross for this. But it is preferred to use 5-6 way cross, since we attach NaI detectors to it like we did in JLab PEPPo.
 
We have one 3-way cross for this. But it is preferred to use 5-6 way cross, since we attach NaI detectors to it like we did in JLab PEPPo.
Line 100: Line 102:
 
|-
 
|-
 
|  Blank off ||    Need to count    || [Blank off]
 
|  Blank off ||    Need to count    || [Blank off]
 +
|-
 +
|  Faraday Cup ||        ||
 
|-
 
|-
 
|}
 
|}

Revision as of 22:21, 8 March 2012

Proposals

Collaboration

Work

Designs

HRRL beam Line installation

Experiments

Simulations

Equipment

References

Neutron production

File:Huang NIMB229 2005.pdf


MDC Parts list

1. 4-6way cross for 45 degree line

5 cross for the 45 degree beam line flag.

Parts Quantity Link
5-way cross 1 5-way cross
View Port 1 Where did we ordered last one. [View Port]

2. 5-6 way cross for 90 degree line

Do we need Faraday Cup at the end of 90 degree?

We have one 3-way cross for this. But it is preferred to use 5-6 way cross, since we attach NaI detectors to it like we did in JLab PEPPo.

Parts Quantity Link
5-way cross either one 6-way or 5-way cross. 5-way cross
6-way cross either one 6-way or 5-way cross. 6-way cross
Blank off Need to count [Blank off]
Faraday Cup

3. Double side Flange for Jlab Flag 3

Parts Quantity Link
Double side Flange 1 Double Side Flange 458

4. Flanges for 90 degree beam line

Parts Quantity Link
Flng, 4.5"x2.5"Rotatable 2 Flange 450-250

5. Ion pump parts

Ion pump parts

Parts Parts Label Quantity Link
Reduced 3-way Cross (T) ReducingTee, 4.5"x2.75" 1 Reduced T

6. Target chamber parts

Target chamber parts (HV = 10^{-8} Torr)

a.) 10- pin wiring feedthrough

http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.1.1.2.1

b.) 4 flexible hoses for cooling lines (at least nitrogen gas hopefully liquid nitrogen)

http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=m.6.2.4.1

c.) IR optical window for target temperature measurement

http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.7.1.1.1

Parts Quantity Link
10 - pin wiring feedthrough Pin Through
4 flexible hoses for cooling lines Cooling Hoses
IR optical window Optical Window

User_talk:foretony


User:Setisadi