Difference between revisions of "CLAS12 R1 Progress Reports"

From New IAC Wiki
Jump to navigation Jump to search
 
(249 intermediate revisions by 6 users not shown)
Line 1: Line 1:
 
[http://clasweb.jlab.org/wiki/index.php/CLAS12_Drift_Chambers The Drift Chamber Wiki at JLab]  
 
[http://clasweb.jlab.org/wiki/index.php/CLAS12_Drift_Chambers The Drift Chamber Wiki at JLab]  
 +
 +
[http://wwwold.jlab.org/Hall-B/clas12-web/  CLAS12 Web page]
 +
 +
1) Dial toll free, 866-740-1260
 +
2) Enter the 7 digit Access Code, 6074391, followed by the "#" key.
 +
 +
 +
[http://128.82.116.28:2342/ODU+DAQ/ ODUs logbook]
 +
 +
 +
[http://daq1.physics.isu.edu/cgi-bin/r1dc_dbPlotter.pl Database Viewer]
 +
 +
 +
or if the DAQ computer is at the IAC
 +
 +
[http://daq1.iac.isu.edu/cgi-bin/r1dc_dbPlotter.pl Database Viewer]
 +
 +
service httpd start
  
 
=Clean room Prep=
 
=Clean room Prep=
Line 5: Line 23:
 
[[CleanRoomPrep2009-2011]]
 
[[CleanRoomPrep2009-2011]]
  
=7/14/11=
+
=Clean room Construction 2011=
 +
 
 +
[[CleanRoomConstruction2011]]
 +
 
 +
=Jlab Shipment 8/8/2011=
 +
 
 +
[[JLabShipment08082011]]
 +
 
 +
= Jlab Stringing Prep=
 +
 
 +
[[CLAS12_CleaRoomPrep_2011]]
 +
 
 +
=September 2011=
 +
 
 +
[[201109_R1ProgressRep]]
 +
 
 +
=October 2011 =
 +
[[201110_R1ProgressRep]]
 +
 
 +
=November 2011=
 +
[[201111_R1ProgressRep]]
 +
 
 +
=December 2011=
 +
[[201112_R1ProgressRep]]
 +
 
 +
=January 2012=
 +
[[201201_R1ProgressRep]]
 +
 
 +
=February 2012=
 +
[[201202_R1ProgressRep]]
 +
 
 +
=March 2012=
 +
[[201203_R1ProgressRep]]
 +
 
 +
 
 +
[[ CLAS12_R1]]
 +
 
 +
[[ PhysicsCleanRoomParticleCountLog | ISU - Clean Room Particle Count Log]]
 +
 
 +
 
 +
=April 2012=
 +
[[201204_R1ProgressRep]]
 +
 
 +
 
 +
[[ CLAS12_R1]]
 +
 
 +
[[ PhysicsCleanRoomParticleCountLog | ISU - Clean Room Particle Count Log]]
 +
 
 +
 
 +
=May 2012=
 +
[[201205_R1ProgressRep]]
 +
 
 +
 
 +
[[ CLAS12_R1]]
 +
 
 +
 
 +
=June 2012=
 +
[[201206_R1ProgressRep]]
 +
 
 +
 
 +
[[ CLAS12_R1]]
 +
 
 +
 
 +
=July 2012=
 +
[[201207_R1ProgressRep]]
 +
 
 +
 
 +
[[ CLAS12_R1]]
 +
 
 +
 
 +
=August 2012=
 +
[[201208_R1ProgressRep]]
 +
 
 +
 
 +
[[ CLAS12_R1]]
 +
 
 +
 
 +
=September 2012=
 +
[[201209_R1ProgressRep]]
 +
 
 +
==JLab Shipment==
 +
 
 +
[[09122012_JlabShipment]]
 +
 
 +
[[File:925R1SL1S5_FieldTensionCompare.png || 200 px]]
 +
 
 +
[[File:925R1SL1S6_SenseTensionCompare.png || 200 px]]
 +
 
 +
[[ CLAS12_R1]]
 +
 
 +
 
 +
=October 2012=
 +
[[201210_R1ProgressRep]]
 +
 
 +
 
 +
==Potting==
 +
 
 +
Epoxy Ratio 2.33:1 (Epon 828 Resin : Versamid 140).
 +
 
 +
 
  
 +
[[ CLAS12_R1]]
  
Preparing to raise the clean room.
 
  
1.) Floor protective mats from  [http://www.ramboard.com/index.php Ram Board].  BMC West in Idaho Falls has 2 rolls (38" x 100' @ $57.03 each)
+
=November 2012=
 +
[[201211_R1ProgressRep]]
  
2.) Rent 2 scissor lifts from pro rental (233-4770).  $150/weeks each
+
=December 2012=
 +
[[201212_R1ProgressRep]]
  
3.) Rent a crane from Rick @Partner Steel (233-2371) $85/hr to lower the lifts into the basement.  (Partner steel gives ISU hourly rates)
+
==12/3/12 Meeting Notes with Mac and George at ISU==
  
  
Below are pictures of the freshly painted clean room floor.
+
===Construction Proceedures:===
  
 +
Chambers outside cleanroom should have covers to keep dust off buss wires
  
 +
Cap 113 (Brown one) needs to be replaced on STB board.
  
[[File:ACleanRoomPrep_4-14-11A.jpg | 200 px]][[File:BCleanRoomPrep_4-14-11.jpg | 200 px]]
 
  
 +
Need 2 amp fuse on 5 Volt supply to pre-amps.
  
=7/15/11=
+
operate chamber STB voltage at 6 Volts
  
Removing the 1 ton crane:
 
  
[[File:CR_crane_7-14-2011a.jpg| 200 px]][[File:CR_crane_7-14-2011b.jpg| 200 px]][[File:CR_crane_7-14-2011c.jpg| 200 px]][[File:CR_crane_7-14-2011d.jpg| 200 px]]
 
  
 +
Chamber grounding (ground through HV cable)
  
=7/18/11=
+
===Chamber operating procedures===
  
Got organized to install the main frame
+
1.) post amplifier in VME crate had 150 mV peak-peak noise
  
 +
2.) Stop using the current ADB crate
  
[[File:CR_Frame_7-18-2011a.jpg| 200 px]]
+
3.) New nominal Voltages from Mac are
  
=7/19/11=
+
S:F:G = 1300:-650:
  
3-D removed water lines that were in the way.
+
S/F = 2
  
=7/20/11=
+
S/G = 5/7
  
ISU's facilities people remove the  ceiling  lights (Kent 380-9814 his boss is Ed Cash : 242-8192)
+
Signal output doubles every 75 Volts difference between sense and field
  
[[File:CR_Lights_7-20-2011a.jpg| 200 px]][[File:CR_Lights_7-20-2011b.jpg| 200 px]]
 
  
Put up 2  main frame beams.
 
  
[[File:CR_Frame_7-20-2011a.jpg| 200 px]][[File:CR_Frame_7-18-2011c.jpg| 200 px]][[File:CR_Frame_7-18-2011b.jpg| 200 px]]
+
4.) Discriminator level for signals:  
  
=7/21/11=
+
5.) Need to lower the HV trip current back to 1 microA.  May increase it to 5 micro Amps when burning in.
  
Main support frame is up
+
6.) Change trip speed to 0.1 sec
  
[[File:CR_Frame_7-21-2011a.jpg| 200 px]][[File:CR_Frame_7-21-2011c.jpg| 200 px]][[File:CR_Frame_7-21-2011b.jpg| 200 px]][[File:CR_Frame_7-21-2011d.jpg| 200 px]]
 
  
=7/22/11=
 
  
Install corner braces
 
  
[[File:CR_CornerBraces_7-22-2011.jpg| 200 px]]
+
===ISU Tasks:===
  
Install Center Beam tubes to support Fans
+
1.) Install cover on top of chamber,  top could be made from home insulation sheets that has been covered with paper or plastic sheeting.
  
  
[[File:CR_CenterBeam_7-22-2011a.jpg| 200 px]][[File:CR_CenterBeam_7-22-2011b.jpg| 200 px]][[File:CR_CenterBeam_7-22-2011c.jpg| 200 px]][[File:CR_CenterBeam_7-22-2011d.jpg| 200 px]]
+
2.) Install 208 Volts for ADB crates that will be sent by JLab to replace the one they have given us.
  
Install Fan and light mounts on one side, we will put the fans up on this one side, install the remaining mounts, and then slide the fans out into the proper locations along the center beams.
+
3.) solder jumpers onto HV boards, install them in January when George returns
  
 +
4.) Mylar window on S1 chamber needs to have some tape and weather stripping redone or modified
  
[[File:CR_FanLightMounts_7-22-2011a.jpg| 200 px]]
+
5.) Get allen head 3/32 for torque wrench, remember to replace brass screws if they are removed for some reason
[[File:CR_FanLightMounts_7-22-2011b.jpg| 200 px]]
 
[[File:CR_FanLightMounts_7-22-2011c.jpg| 200 px]]
 
  
 +
6.) do not do final instrumentation, purge covers, and dust covers on the last 2 chambers until checking with JLab, the may want to survey them after delivery
  
==Blemish ==
 
  
There is a spot on the top of the Center beams (outside the clean room ceiling which appears to be where the powdercoat failed to adhere.
 
  
[[File:CR_CenterBeamBlemish_7-22-2011a.jpg| 200 px]]
+
===JLab Tasks===
  
The threaded rod support plate covers the spot.  You can barely see the blemish as a yellow coffee like stain through the crack.
+
1.) What are the fault conditions on the STB board when the power supply exceeds voltage/current
  
[[File:CR_CenterBeamBlemish_7-22-2011b.jpg| 200 px]]
+
2.) Need signal cables with strain relief connects that have the shielding wrap grounded on the STB board but not grounded on the DAQ cabinet
  
=7/25/11=
 
  
Our goal today will be to install the fans and lights.
+
3.) George will send purge covers and come back in January to install
  
First, 4 fans are positioned on the center beam mounts.  Care is taken to keep from soiling the filters.  Plastic is left over them and a cardboard layer is inserted between the filter base and the lifting forks.
 
  
[[File:CR_FanInstall_7-25-2011a.jpg| 200 px]]
+
=January 2013=
 +
[[201301_R1ProgressRep]]
  
Then the remaining center beam fan supports are put in place
 
  
Then the fans are spaced out into their proper locations and the T-braces are installed.  We placed plastic around the HEPA filters and cardboard between the lift forks and the filters.
+
=February 2013=
  
[[File:CR_FanSpacing_7-25-2011a.jpg| 200 px]]
+
[[201302_R1ProgressRep]]
  
Finally the lights are put in place.  The lens covers are removed to keep from scratching.
+
=March 2013=
  
[[File:CR_LightInstall_7-25-2011a.jpg| 200 px]]
+
[[201303_R1ProgressRep]]
  
=7/27/11=
 
  
The lights and fans are in place now.
+
[[File:PCR_Temps_Sept2012-March2013.png | 200 px]]
  
We had plastic of the filters for protection.  You can see one before we finished removing it in the picture below.
+
=April 2013=
[[File:CR_Ceiling_7-27-11a.jpg | 200 px]]
 
  
We also have plastic covering the pre-filters during installation.
+
[[201304_R1ProgressRep]]
 +
=May 2013=
  
[[File:CR_Ceiling_7-27-11b.jpg | 200 px]]
+
[[201305_R1ProgressRep]]
  
We now have a clean room ceiling
+
=June 2013=
  
 +
[[201306_R1ProgressRep]]
 +
=July 2013=
  
[[File:CR_Ceiling_7-27-11c.jpg | 200 px]]
+
[[201307_R1ProgressRep]]
  
 +
=August 2013=
  
=7/28/11=
+
[[201308_R1ProgressRep]]
 +
=September 2013=
  
Fans and lights were wired up for electricity by Facilities.
+
[[201309_R1ProgressRep]]
  
=7/29/11=
 
  
no progress, basement cleanup needed attention
+
[[File:PCR_Temps_March-Aug-2013.png | 200 px]]
  
=8/1/11=
+
=October 2013=
  
Put dual lock (velcro) all along the top to hang the walls from
+
[[201310_R1ProgressRep]]
 +
=November 2013=
  
[[File:R1CR_Velcro4SoftWalls.png| 200 px]]
+
[[201311_R1ProgressRep]]
 +
=December 2013=
  
=8/2/11=
+
[[201312_R1ProgressRep]]
 +
=January 2014=
  
Dan and Tony installed most of the strip door. We departed from the design by using 2 anchor bolts on each strip section in addition to the three lag screws.  We also mounted it a little differently so the curtain frame is flush with the end tubes.  This was a 90 degree rotation putting more of the aluminum strip door frame surface along the end frame tube instead of just the edge.  An installer from Clean Air Products suggested this as an installation method.  Given the weight and the metal frame around the vinyl, we thought it would be more secure.
+
[[201401_R1ProgressRep]]
  
  
 +
==JLab shipment==
  
[[File:R1CR_StripDoor1.jpg| 200 px]]
+
Plan: Lift chambers + Pallets out of Physics and carry them to ISU's loading dock using a fork lift on Wednesday January 8 when ISU is on Thanksgiving break.  The chambers will be stored inside a heated building over thanksgiving break and be ready for pickup.
  
[[File:R1CR_StripDoor2.jpg| 200 px]]
+
Rick at Partner Steel needs to be called in December with a final date
  
=8/5/11=
+
A fork lift reservation needs to be confirmed with Wade in December.
  
  
I installed better prefilters last night and turned the HEPA filters on this morning.  They are set to Medium which is identified as a flow of 675 CFM in the manual.[[File:Clean_Air_FilterDescript_10-15-10.pdf]]
 
  
The walls are up.
+
[[CLAS12_R1]]
  
[[File:CR_8-5-11_a.jpg| 200 px]][[File:CR_8-5-11_b.jpg| 200 px]][[File:CR_8-5-11_c.jpg| 200 px]]
+
=February 2014=
  
Next step, build the changing room.  We chose to use ODUs model of putting a fan in the changing room.
+
[[201402_R1ProgressRep]]
 +
=March 2014=
  
 +
[[201403_R1ProgressRep]]
  
[http://wiki.iac.isu.edu/index.php/CLAS12_R1]  [[ CLAS12_R1]]
+
[[CLAS12_R1]]

Latest revision as of 16:27, 7 March 2014

The Drift Chamber Wiki at JLab

CLAS12 Web page

1) Dial toll free, 866-740-1260 2) Enter the 7 digit Access Code, 6074391, followed by the "#" key.


ODUs logbook


Database Viewer


or if the DAQ computer is at the IAC

Database Viewer

service httpd start

Clean room Prep

CleanRoomPrep2009-2011

Clean room Construction 2011

CleanRoomConstruction2011

Jlab Shipment 8/8/2011

JLabShipment08082011

Jlab Stringing Prep

CLAS12_CleaRoomPrep_2011

September 2011

201109_R1ProgressRep

October 2011

201110_R1ProgressRep

November 2011

201111_R1ProgressRep

December 2011

201112_R1ProgressRep

January 2012

201201_R1ProgressRep

February 2012

201202_R1ProgressRep

March 2012

201203_R1ProgressRep


CLAS12_R1

ISU - Clean Room Particle Count Log


April 2012

201204_R1ProgressRep


CLAS12_R1

ISU - Clean Room Particle Count Log


May 2012

201205_R1ProgressRep


CLAS12_R1


June 2012

201206_R1ProgressRep


CLAS12_R1


July 2012

201207_R1ProgressRep


CLAS12_R1


August 2012

201208_R1ProgressRep


CLAS12_R1


September 2012

201209_R1ProgressRep

JLab Shipment

09122012_JlabShipment

925R1SL1S5 FieldTensionCompare.png

925R1SL1S6 SenseTensionCompare.png

CLAS12_R1


October 2012

201210_R1ProgressRep


Potting

Epoxy Ratio 2.33:1 (Epon 828 Resin : Versamid 140).


CLAS12_R1


November 2012

201211_R1ProgressRep

December 2012

201212_R1ProgressRep

12/3/12 Meeting Notes with Mac and George at ISU

Construction Proceedures:

Chambers outside cleanroom should have covers to keep dust off buss wires

Cap 113 (Brown one) needs to be replaced on STB board.


Need 2 amp fuse on 5 Volt supply to pre-amps.

operate chamber STB voltage at 6 Volts


Chamber grounding (ground through HV cable)

Chamber operating procedures

1.) post amplifier in VME crate had 150 mV peak-peak noise

2.) Stop using the current ADB crate

3.) New nominal Voltages from Mac are

S:F:G = 1300:-650:

S/F = 2

S/G = 5/7

Signal output doubles every 75 Volts difference between sense and field


4.) Discriminator level for signals:

5.) Need to lower the HV trip current back to 1 microA. May increase it to 5 micro Amps when burning in.

6.) Change trip speed to 0.1 sec



ISU Tasks:

1.) Install cover on top of chamber, top could be made from home insulation sheets that has been covered with paper or plastic sheeting.


2.) Install 208 Volts for ADB crates that will be sent by JLab to replace the one they have given us.

3.) solder jumpers onto HV boards, install them in January when George returns

4.) Mylar window on S1 chamber needs to have some tape and weather stripping redone or modified

5.) Get allen head 3/32 for torque wrench, remember to replace brass screws if they are removed for some reason

6.) do not do final instrumentation, purge covers, and dust covers on the last 2 chambers until checking with JLab, the may want to survey them after delivery


JLab Tasks

1.) What are the fault conditions on the STB board when the power supply exceeds voltage/current

2.) Need signal cables with strain relief connects that have the shielding wrap grounded on the STB board but not grounded on the DAQ cabinet


3.) George will send purge covers and come back in January to install


January 2013

201301_R1ProgressRep


February 2013

201302_R1ProgressRep

March 2013

201303_R1ProgressRep


PCR Temps Sept2012-March2013.png

April 2013

201304_R1ProgressRep

May 2013

201305_R1ProgressRep

June 2013

201306_R1ProgressRep

July 2013

201307_R1ProgressRep

August 2013

201308_R1ProgressRep

September 2013

201309_R1ProgressRep


PCR Temps March-Aug-2013.png

October 2013

201310_R1ProgressRep

November 2013

201311_R1ProgressRep

December 2013

201312_R1ProgressRep

January 2014

201401_R1ProgressRep


JLab shipment

Plan: Lift chambers + Pallets out of Physics and carry them to ISU's loading dock using a fork lift on Wednesday January 8 when ISU is on Thanksgiving break. The chambers will be stored inside a heated building over thanksgiving break and be ready for pickup.

Rick at Partner Steel needs to be called in December with a final date

A fork lift reservation needs to be confirmed with Wade in December.


CLAS12_R1

February 2014

201402_R1ProgressRep

March 2014

201403_R1ProgressRep

CLAS12_R1