JLabShipment08082011

From New IAC Wiki
Jump to navigation Jump to search

Truck #1 arrives 8/8/11

1JLabTruck08082011.jpg

Problem unloading Stringing Fixture

The Stringing Fixture, when standing on the pallet, was between 3-5 inches too high. We laid it down on its side to get it in the dock door.

C12 SF Problem2.jpgC12 SF Problem1.jpgC12 SF Problem3.jpg


2011C12 SF Soltn1.jpg2011C12 SF Soltn2.jpg

We will need to use the crane to lay the next fixture on its side or pack it so it is 3" lower in height (don't put it on a pallet but make custum skids for moving it with the pallet jack).

Pallet #1 Drift Chamber and Strong back

Jason Stoks and Larry Lim see how well the Drift chamber shipping box fits through the dock doorway.

1CLAS12R1D1 08082011.jpg2CLAS12R1D1 08082011.jpg


The crane rents for $85/hr. It took 2 hours to unload 7 pallets.

Strongback tie downs to pallet

3CLAS12R1D108082011.jpg

Pallet #2 Stringing Fixture

1CLAS12StrinFixtr08082011.jpg


Pallet 3 Loading Platform

1CLAS12LoadingPlatformA08082011.jpg

A few scrapes on the sides

2CLAS12LoadingPlatformA08082011.jpg

Pallet #4 Magnet

1CLAS12Magnet08082011.jpg2CLAS12Magnet08082011.jpg

some paint has come off

3CLAS12Magnet08082011.jpg

Pallet #5 Loading platform

1CLAS12LoadingPlatformD08082011.jpg

Pallet #6 & 7 Scissor lifts

1CLAS12R1ScissorLift.jpg2CLAS12R1ScissorLift.jpg3CLAS12R1ScissorLift.jpg

CLAS12_R1_Progress_Reports