Neutron production

File:Huang NIMB229 2005.pdf

MDC Parts list

Parts received

Mar 10th 2012

Part# Quantity Discription Link
450005 1 view port big viewport for corosses
110022 1 Blank off Blank off
611005 2 feedthrough for cooling feedthrough for cooling
404048 1 Reduced T

Apr 17th 2012

Part# Quantity Discription Link
450005 1 view port big viewport for corosses
100021 2 Flng, 4.5"x2.5"Rotatable [long beam pipe flanges]

Apr 23 2012

Long beam pipe through the wall is ready.


Apr 30th 2012

Part# Quantity Discription
1 Installation kit for chaber vacuum window

May 14th 2012

Part# Quantity Discription Link
9712007 1 Viewport for vaccum chamber viewport

1. 4-6way cross for 45 degree line

1) 5 way cross for 45 degree.

2) Blank-off or view port. (If we borrow the view port 0 degree, we need to buy a blank-off for 0 degree.)

HRRL order 45deg.png

Parts Quantity Link Delevary status
5-way cross 1 5-way cross
View Port 1 VPQ-300, quote from last time File:Hrrl-view-port-quote.pdf This item chaged to [MDC viewport for corosses] Delevered
Blank off 1 Blank off Delevered

2. 5-6 way cross for 90 degree line

HRRL order 90deg.png


Do we need Faraday Cup at the end of 90 degree?


Parts Quantity Link Delevary status
6-way cross 1 6-way cross
Faraday Cup 2 (1 for 45 degree and 1 for 90 degree) Faraday Cup, Buy this one Faraday Cup
View Port 1 VPQ-300, quote from last time File:Hrrl-view-port-quote.pdf This item chaged to [MDC viewport for corosses] Delevered

4. Flanges for 90 degree beam line

Parts Quantity Link Deleveray status
Flng, 4.5"x2.5"Rotatable 2 Flange 450-250 Delevered

5. Ion pump parts

Ion pump parts

Parts Parts Label Quantity Link Delevaray status
Reduced 3-way Cross (T) ReducingTee, 4.5"x2.75" 1 Reduced T Delevared.

6. Target chamber parts

Target chamber parts (HV = 10^{-8} Torr)

a.) 10- pin wiring feedthrough

http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.1.1.2.1

b.) 4 flexible hoses for cooling lines (at least nitrogen gas hopefully liquid nitrogen)

http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=m.6.2.4.1

c.) IR optical window for target temperature measurement

http://www.mdcvacuum.com/displayproductcontent.aspx?d=MDC&p=i.7.1.1.1

Parts Quantity Link Delevary status
10 - pin wiring feedthrough 1 Pin Through
4 flexible hoses for cooling lines 2 Cooling Hoses deleraved
IR optical window 1 Optical Window delevared