Oldest pages

Jump to navigation Jump to search

Showing below up to 50 results in range #2,191 to #2,240.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)

  1. Initial CM Frame 4-momentum components‏‎ (18:53, 15 May 2018)
  2. Special Case of Equal Mass Particles‏‎ (18:53, 15 May 2018)
  3. Total Energy in CM Frame‏‎ (18:54, 15 May 2018)
  4. Scattered and Moller Electron Energies in CM Frame‏‎ (18:54, 15 May 2018)
  5. Final Lab Frame Moller Electron 4-momentum components in XZ Plane‏‎ (18:54, 15 May 2018)
  6. Determining wire-theta correspondence‏‎ (20:12, 15 May 2018)
  7. CED Verification of DC Angle Theta and Wire Correspondance‏‎ (20:13, 15 May 2018)
  8. DC Super Layer 1:Layer 1‏‎ (20:14, 15 May 2018)
  9. DC Binning Based On Wire Numbers‏‎ (20:14, 15 May 2018)
  10. Detector Geometry Simulation‏‎ (20:21, 15 May 2018)
  11. Conic Sections‏‎ (20:22, 15 May 2018)
  12. Circular Cross Sections‏‎ (20:22, 15 May 2018)
  13. Elliptical Cross Sections‏‎ (20:23, 15 May 2018)
  14. Determing Elliptical Components‏‎ (20:23, 15 May 2018)
  15. Determing Elliptical Equations‏‎ (20:23, 15 May 2018)
  16. Test for Theta at 20 degrees and Phi at 0‏‎ (20:24, 15 May 2018)
  17. In the Detector Plane‏‎ (20:24, 15 May 2018)
  18. Test in Plane for Theta at 20 degrees and Phi at 0‏‎ (20:28, 15 May 2018)
  19. Test in Plane for Theta at 20 degrees and Phi at 1 degree‏‎ (20:28, 15 May 2018)
  20. Function for change in x', Lab frame‏‎ (20:28, 15 May 2018)
  21. Wire Number Function‏‎ (20:29, 15 May 2018)
  22. In the Detector Frame‏‎ (20:32, 15 May 2018)
  23. The Wires‏‎ (20:32, 15 May 2018)
  24. Right Hand Wall‏‎ (20:33, 15 May 2018)
  25. Left Hand Wall‏‎ (20:33, 15 May 2018)
  26. The Ellipse‏‎ (20:33, 15 May 2018)
  27. Plotting Different Frames‏‎ (20:34, 15 May 2018)
  28. Parameterizing the Ellipse Equation‏‎ (20:38, 15 May 2018)
  29. Change in Wire Bin Number‏‎ (20:39, 15 May 2018)
  30. One Hit Per Wire Bin‏‎ (20:39, 15 May 2018)
  31. Wire Bin Number as a function of Theta and Phi for Right Side‏‎ (20:40, 15 May 2018)
  32. Wire Bin Number as a function of Theta and Phi for Left Side‏‎ (20:40, 15 May 2018)
  33. Phi and Theta Limits of wire bins‏‎ (20:41, 15 May 2018)
  34. Preparing Drift Chamber Efficiency Tests‏‎ (20:44, 15 May 2018)
  35. Uniform distribution in Energy and Theta LUND files‏‎ (20:44, 15 May 2018)
  36. 1000 Events per degree in the range 5 to 40 degrees for Lab Frame‏‎ (20:49, 15 May 2018)
  37. Isotropic Spread in CM for 5 to 40 degrees in Lab Frame‏‎ (20:50, 15 May 2018)
  38. LB May 2017 Irradiation Day‏‎ (22:08, 16 May 2018)
  39. PhysicsThesis Standards Procedures‏‎ (21:28, 18 May 2018)
  40. Occupancy for Sector 1‏‎ (02:24, 22 May 2018)
  41. LB May Runlist 2017‏‎ (17:41, 22 May 2018)
  42. 100mA, 100ns pulse width, 25cm from beam pipe‏‎ (19:17, 29 May 2018)
  43. 25mA, 100ns pulse width, 25cm from beam pipe‏‎ (19:18, 29 May 2018)
  44. 25mA, 100ns pulse width, 50cm from beam pipe‏‎ (19:18, 29 May 2018)
  45. 25mA, 100ns pulse width, 50cm from beam pipe, tungsten target with aluminum beamstop‏‎ (19:19, 29 May 2018)
  46. 25mA, 100ns pulse width, 100cm from beam pipe, with Titanium window‏‎ (03:42, 30 May 2018)
  47. 5mA, 100ns pulse width, 100cm from beam pipe with Titanium window‏‎ (04:07, 30 May 2018)
  48. 10mA, 100ns pulse width, 100cm from beam pipe, with Titanium window‏‎ (04:17, 30 May 2018)
  49. 100mA, 100ns pulse width, 100cm from beam pipe, with Titanium window‏‎ (19:01, 30 May 2018)
  50. LB Thesis Outline‏‎ (21:07, 30 May 2018)

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)