Oldest pages

Jump to navigation Jump to search

Showing below up to 100 results in range #251 to #350.

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)

  1. REU Projects‏‎ (19:24, 4 August 2008)
  2. Phi angle in CM frame for different runs‏‎ (14:21, 13 August 2008)
  3. Experimental setup‏‎ (10:38, 25 August 2008)
  4. Software‏‎ (14:55, 31 August 2008)
  5. Quality Checks‏‎ (10:58, 19 September 2008)
  6. Verifying Neutron Detection‏‎ (15:11, 19 September 2008)
  7. Forest NSF BioSketch‏‎ (11:43, 20 September 2008)
  8. NSF Proposal 2007 AwardNum0653570‏‎ (16:29, 20 September 2008)
  9. Forest Water Consumption‏‎ (20:19, 12 October 2008)
  10. DDP:Detailed Design Phase: Drawing and Assembly Package‏‎ (08:48, 14 October 2008)
  11. PFD:Production of Fabrication Drawings‏‎ (14:36, 16 October 2008)
  12. Progress reports‏‎ (23:26, 25 October 2008)
  13. MiniPrototype SinglesCosmicRuns 2008‏‎ (00:44, 26 October 2008)
  14. Greatfit.m (Matlab program fot fitting)‏‎ (04:53, 30 October 2008)
  15. 10-29-08 GEM HRRL Photon Runs‏‎ (22:29, 30 October 2008)
  16. 10-30-08 GEM HRRL Photon Runs‏‎ (23:04, 30 October 2008)
  17. Cross Sections of Pb,Si,N,O‏‎ (08:50, 1 November 2008)
  18. Transition Form Factors‏‎ (18:03, 5 November 2008)
  19. DOE 2008 Proposal‏‎ (23:20, 8 November 2008)
  20. Qweak PAC2008 Writeup‏‎ (15:46, 11 November 2008)
  21. Qweak Related documents‏‎ (15:48, 11 November 2008)
  22. Theory Input‏‎ (18:28, 15 November 2008)
  23. Papers‏‎ (18:34, 15 November 2008)
  24. Talks‏‎ (22:51, 15 November 2008)
  25. Lang‏‎ (03:27, 1 December 2008)
  26. Ruskim‏‎ (08:30, 3 December 2008)
  27. Figures‏‎ (00:33, 4 December 2008)
  28. Doppler Broadening‏‎ (07:48, 7 December 2008)
  29. 10-31-08 GEM HRRL Photon Runs‏‎ (07:52, 7 December 2008)
  30. GEM HRRL Photons‏‎ (07:57, 7 December 2008)
  31. 12-GeV NSTAR‏‎ (00:26, 13 December 2008)
  32. New Proposal‏‎ (03:24, 15 December 2008)
  33. MiniPrototype Operation Regions 2008‏‎ (23:34, 16 December 2008)
  34. GEM Cosmic V792 Measurements‏‎ (03:11, 19 December 2008)
  35. Plagiarism‏‎ (23:13, 25 December 2008)
  36. October Fission HRRL Measurements 2008‏‎ (04:07, 9 January 2009)
  37. Analysis‏‎ (18:49, 13 January 2009)
  38. LCS Experiment.C‏‎ (23:34, 14 January 2009)
  39. Caen775Lib.c Code‏‎ (18:32, 16 January 2009)
  40. CAEN V1495 ADC‏‎ (18:53, 16 January 2009)
  41. NucPhys I Syllabus‏‎ (16:55, 21 January 2009)
  42. Gasket Design‏‎ (15:32, 22 January 2009)
  43. TF Management‏‎ (04:08, 26 January 2009)
  44. Detector.pdf‏‎ (23:45, 27 January 2009)
  45. PLX‏‎ (21:11, 28 January 2009)
  46. Gumstix Crapola‏‎ (06:04, 5 February 2009)
  47. Plot‏‎ (06:17, 5 February 2009)
  48. B-field calculation‏‎ (06:17, 5 February 2009)
  49. TDC Calibration‏‎ (06:18, 5 February 2009)
  50. Conversion TDC to Energy‏‎ (06:18, 5 February 2009)
  51. Peaks fitting‏‎ (06:19, 5 February 2009)
  52. PhotoFis.C (ROOT program to analyse data)‏‎ (06:22, 5 February 2009)
  53. Neutron Time of Flight Test‏‎ (06:22, 5 February 2009)
  54. Cosmic Ray Shielding Test‏‎ (06:22, 5 February 2009)
  55. Matching Detectors‏‎ (06:23, 5 February 2009)
  56. Current Conceptual Design of Beamline‏‎ (06:23, 5 February 2009)
  57. Notes from July 22nd, 2008 Meeting‏‎ (06:24, 5 February 2009)
  58. Magnet Calculations‏‎ (06:25, 5 February 2009)
  59. Constant Fraction Discriminator Details‏‎ (06:25, 5 February 2009)
  60. Compton Scattering‏‎ (06:25, 5 February 2009)
  61. Electronics We Need to Collect‏‎ (06:25, 5 February 2009)
  62. Finding the Space Between Lead Shots‏‎ (06:26, 5 February 2009)
  63. Column of Water Length‏‎ (06:26, 5 February 2009)
  64. Notes for the July 11th, 2008 Meeting‏‎ (06:26, 5 February 2009)
  65. Brems Intensity Spectrum (without Collimation Factors) Plots‏‎ (06:26, 5 February 2009)
  66. Brems Intensity Spectrum (with Collimation Factors) Plots‏‎ (06:26, 5 February 2009)
  67. Notes from July 2nd, 2008 Meeting‏‎ (06:26, 5 February 2009)
  68. Things That Still Need to Get Done‏‎ (06:27, 5 February 2009)
  69. Where does the radiator need to be?‏‎ (06:27, 5 February 2009)
  70. Thickness of Lead to block photons‏‎ (06:27, 5 February 2009)
  71. Using Carbon or Aluminum to block photons‏‎ (06:28, 5 February 2009)
  72. Radiator Foil‏‎ (06:28, 5 February 2009)
  73. PhotoFissionOctoberAnalysis‏‎ (06:29, 5 February 2009)
  74. October 22, 2008‏‎ (06:30, 5 February 2009)
  75. October 20, 2008‏‎ (06:30, 5 February 2009)
  76. Uranium target test‏‎ (06:30, 5 February 2009)
  77. October 17, 2008‏‎ (06:31, 5 February 2009)
  78. October 16, 2008‏‎ (06:31, 5 February 2009)
  79. October 15, 2008‏‎ (06:31, 5 February 2009)
  80. All 3 detectors working‏‎ (06:32, 5 February 2009)
  81. Faraday Cup Current and Gamma from NaI detector‏‎ (06:32, 5 February 2009)
  82. October 14, 2008 Double peak problem‏‎ (06:32, 5 February 2009)
  83. October 10, 2008 Run-day one‏‎ (06:32, 5 February 2009)
  84. Apparatus Layout‏‎ (06:33, 5 February 2009)
  85. HRRL room dimensions‏‎ (06:33, 5 February 2009)
  86. HRRL Simulations‏‎ (06:34, 5 February 2009)
  87. Radiators Temperature‏‎ (06:34, 5 February 2009)
  88. Detector Tests Using HRRL‏‎ (06:36, 5 February 2009)
  89. Beam Position Monitor Tests in HRRL‏‎ (06:36, 5 February 2009)
  90. 5-19-08‏‎ (06:36, 5 February 2009)
  91. HRRL OSA Docs‏‎ (06:37, 5 February 2009)
  92. HRRL OSA SAMPLE‏‎ (06:38, 5 February 2009)
  93. Plastic Scintillator Calculation‏‎ (18:11, 5 February 2009)
  94. Qweak Chamber Assembly‏‎ (08:57, 8 February 2009)
  95. Cross Sections of C,N,O,Si,Pb‏‎ (00:06, 10 February 2009)
  96. Qweak Qsqrd Error Code 2Trackers‏‎ (00:57, 14 February 2009)
  97. Radius of Curvature Calculation‏‎ (08:57, 17 February 2009)
  98. ThoriumPlatingTGEMproposal‏‎ (18:37, 20 February 2009)
  99. The Heavy Magnet‏‎ (22:24, 26 February 2009)
  100. New Magnet‏‎ (22:55, 26 February 2009)

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)