Difference between revisions of "CLAS12 R1 Progress Reports"
Line 141: | Line 141: | ||
===ISU Tasks:=== | ===ISU Tasks:=== | ||
+ | |||
+ | 1.) Install cover on top of chamber, top could be made from home insulation sheets that has been covered with paper or plastic sheeting. | ||
===JLab Tasks=== | ===JLab Tasks=== |
Revision as of 22:21, 3 December 2012
The Drift Chamber Wiki at JLab
1) Dial toll free, 866-740-1260 2) Enter the 7 digit Access Code, 6074391, followed by the "#" key.
service httpd start
Clean room Prep
Clean room Construction 2011
Jlab Shipment 8/8/2011
Jlab Stringing Prep
September 2011
October 2011
November 2011
December 2011
January 2012
February 2012
March 2012
ISU - Clean Room Particle Count Log
April 2012
ISU - Clean Room Particle Count Log
May 2012
June 2012
July 2012
August 2012
September 2012
JLab Shipment
October 2012
Potting
Epoxy Ratio 2.33:1 (Epon 828 Resin : Versamid 140).
November 2012
December 2012
12/3/12 Meeting Notes with Mac and George at ISU
Construction Proceedures:
Chambers outside cleanroom should have covers to keep dust off buss wires
Cap 113 (Brown one) needs to be replaced on STB board.
Need 2 amp fuse on 5 Volt supply to pre-amps.
Chamber grounding (ground through HV cable)
Chamber operating procedures
ISU Tasks:
1.) Install cover on top of chamber, top could be made from home insulation sheets that has been covered with paper or plastic sheeting.
JLab Tasks
1.) What are the fault conditions on the STB board when the power supply exceeds voltage/current
2.) Need signal cables with strain relief connects that have the shielding wrap grounded on the STB board but not grounded on the DAQ cabinet