= Jlab Stringing Prep=
 
= Jlab Stringing Prep=
  
==Install fixtures==
+
[[CLAS12_CleaRoomPrep_2011]]
 
 
===8/9/11===
 
 
 
 
 
Installed the crane
 
 
 
[[File:1CLAS12DC_Crane_08092011.jpg| 200 px]][[File:2CLAS12DC_Crane_08092011.jpg| 200 px]]
 
 
 
 
 
Brought down the platforms
 
 
 
[[File:1CLAS12DC_Platform_08092011.jpg| 200 px]][[File:2CLAS12DC_Platform_08092011.jpg| 200 px]]
 
 
 
 
 
Bring down the scissor lifts
 
 
 
[[File:2CLAS12DC_scissorLift_08092011.jpg| 200 px]]
 
 
 
===8/17/11===
 
 
 
Install A-Frame for mounting DCs
 
 
 
[[File:1CLAS12DC_Aframe1_08092011.jpg| 200 px]][[File:2CLAS12DC_Aframe1_08092011.jpg| 200 px]]
 
 
 
====Mounting Sector 1 DC ====
 
[[File:1CLAS12DC_MountDCS1_08092011.jpg| 200 px]][[File:2CLAS12DC_MountDCS1_08092011.jpg| 200 px]][[File:3CLAS12DC_MountDCS1_08092011.jpg| 200 px]][[File:4CLAS12DC_MountDCS1_08092011.jpg| 200 px]]
 
 
 
==Changing Room==
 
 
 
===8/23/11===
 
 
 
Finished installing the changing room.  The changing room is used to put on clean room apparel prior to entering the clean room.  A HEPA filter is placed on top of the room and set to high in order to blow particles off a person before they enter the clean room.
 
 
 
[[File:2CLAS12DC_ChanginRoom_08232011.jpg| 200 px]]
 
 
 
We still need to install a hard door between the changing room and the clean room.
 
==Clean Room 8/23/11 ==
 
 
 
[[File:1CLAS12DC_CleanRoom_08232011.jpg| 200 px]][[File:2CLAS12DC_CleanRoom_08232011.jpg| 200 px]]
 
  
 