Search results

Jump to navigation Jump to search
  • ...eight 55cm. There is a 1mmx1cm hole (made of Argon) from the center of the lead cask to the outside, pointed toward the middle of the Germanium crystal. ...goal of this gun is to simulate decay from a fuel rod on the inside of the lead cylinder. Angular cuts are made on the gun to limit wasteful gammas from be
    5 KB (741 words) - 19:35, 28 May 2016
  • | Lead || 7.05 || 50 mbarns at <math> E_{\gamma}</math>=8 MeV
    656 bytes (80 words) - 21:02, 20 April 2011
  • Behaviour of lead and borated poly under the neutron radiation: 3) borated poly was placed in between two layers of 1" lead layers;
    6 KB (949 words) - 16:09, 8 June 2015
  • Paraffin wax of thickness 12.6 cm and lead of 10 cm thickness were used as a shielding from neutrons and cosmic rays<b
    525 bytes (77 words) - 00:50, 23 October 2007
  • ...s}</math> <math>\textbf{of}</math> <math>\textbf{the}</math> <math>\textbf{lead = 3.24 cm}</math>
    610 bytes (77 words) - 06:27, 5 February 2009
  • | 4 || May 2,2011|| Hire lead stringer send to JLab for training Lead stringer spends < 5 Months initially at JLab stringing 1/2 of a R1 chamber,
    7 KB (903 words) - 04:56, 25 March 2011
  • Personal information that, if compromised, could lead to identity theft.
    816 bytes (117 words) - 19:45, 1 August 2011
  • ...er of thickness 15 cm was used as a neutron attenuator and for cosmic rays lead of thickness 5 cm in front of <br>HpGe detector. Total time of the run was
    830 bytes (130 words) - 00:46, 23 October 2007
  • *Table is fully assembled and has been holding NaI detector and lead. Should be ready for experimental setup
    449 bytes (71 words) - 00:07, 2 June 2021
  • An introductory paragraph can lay out the contents of Chapter 1 in order to lead into the description contained in Chapter 1.
    1 KB (162 words) - 20:47, 17 April 2015
  • [[July 3,2007 Cf-252 without lead container measurements with HpGe & fast plastic scintillators in coincidenc [[July 6, 2007 Neutron Capture in lead]]<br>
    3 KB (469 words) - 07:48, 7 December 2008
  • ...et, poly, and stand,Installed 3rd collimator wall, D30 has one 1/16" thick lead curtain [[File:Rate2nC_5302.png|40px]] ...r magnet, poly, and stand,Installed 3rd collimator wall, D30 has '''NO''' lead curtain [[File:Rate2nC_5303.png|40px]]
    6 KB (886 words) - 22:45, 7 September 2016
  • 3 week lead time on flanges
    935 bytes (110 words) - 21:49, 28 October 2013
  • ==='''Lead Attenuation Measurements'''=== ===='''Lead Open Source'''====
    16 KB (1,820 words) - 18:21, 17 June 2022
  • This cradle will be used in the lead tunnel to hold the NaI detector in the center of the tunnel. The goal was t
    706 bytes (111 words) - 18:29, 24 June 2021
  • * Move painted lead bricks to clean room (X) * Model cradle for NaI detector for lead tube (X)
    4 KB (587 words) - 00:27, 17 November 2021
  • ...)probe, measuring the B-field with beam off, and then tuning the beam will lead to long beam tuning times. b.) liklihood work will lead to marketable product
    3 KB (578 words) - 17:51, 5 November 2011
  • =Creating Lead Cylinder= For a lead cylinder with outer radius of 60mm, to ensure Moller electrons can clear th
    2 KB (300 words) - 19:00, 3 July 2018
  • For the components of FTOff, starting at the cone-tip and running to the lead shield
    1 KB (136 words) - 15:51, 27 October 2018
  • Target is 2 mm thick Lead-Bismuth target, which yields most positrons.
    1 KB (140 words) - 06:52, 19 July 2015

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)