Line 4: Line 4:
  
  
 +
==Measure the Transmission ==
 +
 +
 +
==Measure Positrons produced==
 +
 +
= Runs =
 +
 +
* [[Beam_Test_Jul_5_2012]]
 +
* [[Beam_Test_Jul_11_2012]]
 +
* [[Beam_Test_Jul_12_2012]]
 +
 +
* [[Beam_Test_Jul_16_2012]]
 +
* [[Beam_Test_Jul_17_2012]]
 +
* [[Beam_Test_Jul_18_2012]]
 +
* [[Beam_Test_Jul_19_2012]]
 +
* [[Beam_Test_Jul_20_2012]]
  
==Measure the Transmission ==
+
* [[Beam_Test_Jul_23_2012]]
 +
* [[Beam_Test_Jul_24_2012]]
 +
* [[Beam_Test_Jul_25_2012]]
 +
* [[Beam_Test_Jul_26_2012]]
 +
* [[Beam_Test_Jul_27_2012]]
 +
 
 +
== Energy Estimation on later day runs ==
 +
 
 +
[[https://wiki.iac.isu.edu/index.php/Beam_Test_Jul_11_2012#Energy_estimate_RF_Knob_at_4.19 Energy extrapolation ]]
 +
 
 +
When RF knob was at 4.19, the energy is about 11.56 MeV with rms energy spread of 0.66 MeV
 +
 
 +
= Setup =
 +
 
 +
Detector2 (NaI-2 , S/N 60002-8292-I) is at beam left. It needs 1080 V. [[IAC_NaI_Detectors#Det2]]
 +
 
 +
Detector3 is at beam right. It needs 1060 V. [[IAC_NaI_Detectors#Det3]]
 +
 
 +
(When taking down the experiment It was observed that NaI-1, S/N 60002-8454-I was on the Beam right location).
 +
NaI-3 was replaced with NaI-1 after run#3663.
 +
 
 +
Here are images of setup: [[HRRL_Positrons_Jul_2012_Runs_Setup]]
 +
 
 +
== Crystal ==
 +
 
 +
NaI crystal sizes: 3”x3”
 +
 
 +
SAINT-GOBAIN
 +
 
 +
CRYSTAL & DETECTORS
 +
 
 +
MOD. 3M3/3
 +
 
 +
S/N:60002-8453-I
 +
 
 +
P/N:IA-1377
 +
 
 +
BICRON
 +
 
 +
 
 +
[[Media:SAINT-GOBAIN_3M33.PDF]]
 +
 
 +
Detector Efficiency: [[Media:SAINT-GOBAIN_3M33_Efficiency.PDF]]
 +
 
 +
Detector Efficiency: [[Media:SAINT-GOBAIN_Efficiency.PDF]]
  
  
=== 1st Tuning ===
+
[[File:SAINT-GOBAIN_3M33.png | 400 px]]
  
{| border="1"
+
==T1 converter Target spec==
| Energy Switch || Out (High En Range)
 
|-
 
| Solenoid 1    || 12  A 
 
|-
 
| Solenoid 2      || 10.5    A
 
|-
 
| Gun Hor        ||  0  A
 
|-
 
| Gun Ver        || 0 A
 
|-
 
|Output Hor      ||  0 A
 
|-
 
| Output Ver    || 0.5  A
 
|-
 
| Rep Rate    || 10
 
|-
 
|  Gun HV  ||  10 (Knob Setting)
 
|-
 
|  Gun Grid Voltage  ||  10(Knob Setting)
 
|-
 
|  RF frequency  ||2856.268 MHz
 
|-
 
|  Modulator HV Power Supply  || 4.2 (Knob Setting)
 
|-
 
|  RF macro Pulse Length (FWHM)  || 300 ns
 
|- 
 
|Q1  (A)||0
 
|- 
 
|Q2  (A)|| 0
 
|- 
 
|Q3  (A)|| 0
 
|- 
 
|Q4  (A)|| 0
 
|- 
 
|Q5  (A)|| 0
 
|- 
 
|Q6  (A)|| 0
 
|-
 
|}
 
  
 +
0.04 inch = 1.016 mm: [[File:CHIPs_T1_TungstenTargetMatCert_1mm.pdf]]
 +
[[File:CHIPs_T1_TungstenTargetMatCert_1mm.png | 300 px]]
  
=== 2nd Tuning ===
+
In the second week we changed T2 to the same target as T1.
  
{| border="1"
+
[[HRRL_Positrons_Jul_2012_Runs_Setup#Targets]]
| Energy Switch || In (Low En Range)
 
|-
 
| Solenoid 1    || 3.0  A 
 
|-
 
| Solenoid 2      || 5.2    A
 
|-
 
| Gun Hor        ||  0.1  A
 
|-
 
| Gun Ver        || 0.1 A
 
|-
 
|Output Hor      ||  -0.1 A
 
|-
 
| Output Ver    || -0.3  A
 
|-
 
| Rep Rate    || 10
 
|-
 
|  Gun HV  ||  10 (Knob Setting)
 
|-
 
|  Gun Grid Voltage  ||  10(Knob Setting)
 
|-
 
|  RF frequency  ||2856.269 MHz
 
|-
 
|  Modulator HV Power Supply  || 4.13 (Knob Setting)
 
|-
 
|  RF macro Pulse Length (FWHM)  || 300 ns
 
|- 
 
|Q1  (A)||0
 
|- 
 
|Q2  (A)|| 0
 
|- 
 
|Q3  (A)|| 0
 
|- 
 
|Q4  (A)|| 0
 
|- 
 
|Q5  (A)|| 0
 
|- 
 
|Q6  (A)|| 0
 
|-
 
|}
 
  
=== 3rd Tuning ===
+
== Shieldings ==
  
{| border="1"
+
[[hrrl_pos_jul2012_shieldings]]
| Energy Switch || In (Low En Range)
 
|-
 
| Solenoid 1    || 16.3  A 
 
|-
 
| Solenoid 2      || 10.3    A
 
|-
 
| Gun Hor        ||  0.2  A
 
|-
 
| Gun Ver        || 0.4 A
 
|-
 
|Output Hor      ||  -0.4 A
 
|-
 
| Output Ver    || 0  A
 
|-
 
| Rep Rate    || 10
 
|-
 
|  Gun HV  ||  10 (Knob Setting)
 
|-
 
|  Gun Grid Voltage  ||  10(Knob Setting)
 
|-
 
|  RF frequency  ||2856.781 MHz
 
|-
 
|  Modulator HV Power Supply  || 3.8 (Knob Setting)
 
|-
 
|  RF macro Pulse Length (FWHM)  || 300 ns
 
|- 
 
|Q1  (A)||0
 
|- 
 
|Q2  (A)|| 0
 
|- 
 
|Q3  (A)|| 0
 
|- 
 
|Q4  (A)|| 0
 
|- 
 
|Q5  (A)|| 0
 
|- 
 
|Q6  (A)|| -0.1
 
|-
 
|}
 
  
==Measure Positrons produced==
+
= What will I do if I run again =
  
= Runs =
+
[[Improvements_HRRL_Positron_Runs_July_2012]]
  
* [[Beam_Test_Jul_5_2012]]
+
= Links =
* [[Beam_Test_Jul_11_2012]]
 
  
 +
Dipole mapping: [[https://wiki.iac.isu.edu/index.php/Kiwi_Dipole_Mappings#Matrix_Inversion_Method]]
  
 
[[Positrons]]
 
[[Positrons]]

Latest revision as of 21:46, 11 June 2013

Goals

measure the Beam spot size on target

Measure the Transmission

Measure Positrons produced

Runs

Energy Estimation on later day runs

[Energy extrapolation ]

When RF knob was at 4.19, the energy is about 11.56 MeV with rms energy spread of 0.66 MeV

Setup

Detector2 (NaI-2 , S/N 60002-8292-I) is at beam left. It needs 1080 V. IAC_NaI_Detectors#Det2

Detector3 is at beam right. It needs 1060 V. IAC_NaI_Detectors#Det3

(When taking down the experiment It was observed that NaI-1, S/N 60002-8454-I was on the Beam right location).
NaI-3 was replaced with NaI-1 after run#3663. 

Here are images of setup: HRRL_Positrons_Jul_2012_Runs_Setup

Crystal

NaI crystal sizes: 3”x3”

SAINT-GOBAIN

CRYSTAL & DETECTORS

MOD. 3M3/3

S/N:60002-8453-I

P/N:IA-1377

BICRON


Media:SAINT-GOBAIN_3M33.PDF

Detector Efficiency: Media:SAINT-GOBAIN_3M33_Efficiency.PDF

Detector Efficiency: Media:SAINT-GOBAIN_Efficiency.PDF


SAINT-GOBAIN 3M33.png

T1 converter Target spec

0.04 inch = 1.016 mm: File:CHIPs T1 TungstenTargetMatCert 1mm.pdf CHIPs T1 TungstenTargetMatCert 1mm.png

In the second week we changed T2 to the same target as T1.

HRRL_Positrons_Jul_2012_Runs_Setup#Targets

Shieldings

hrrl_pos_jul2012_shieldings

What will I do if I run again

Improvements_HRRL_Positron_Runs_July_2012

Links

Dipole mapping: [[1]]

Positrons