Difference between revisions of "CLAS12 R1 Progress Reports"

From New IAC Wiki
Jump to navigation Jump to search
Line 73: Line 73:
 
517 (programmer, GED)
 
517 (programmer, GED)
  
4454
+
4454(electrician)
  
163
+
1180 (Plant operator)
  
1180 (
+
920 (landscaper, welder)
  
920 (landscaper, welder)
+
163(No delicate)
  
 
246(No close up work)
 
246(No close up work)

Revision as of 15:54, 25 August 2011

The Drift Chamber Wiki at JLab

Clean room Prep

CleanRoomPrep2009-2011

Clean room Construction 2011

CleanRoomConstruction2011

Jlab Shipment 8/8/2011

JLabShipment08082011

Jlab Stringing Prep

Install fixtures

8/9/11

Installed the crane

1CLAS12DC Crane 08092011.jpg2CLAS12DC Crane 08092011.jpg


Brought down the platforms

1CLAS12DC Platform 08092011.jpg2CLAS12DC Platform 08092011.jpg


Bring down the scissor lifts

2CLAS12DC scissorLift 08092011.jpg

8/17/11

Install A-Frame for mounting DCs

1CLAS12DC Aframe1 08092011.jpg2CLAS12DC Aframe1 08092011.jpg

Mounting Sector 1 DC

1CLAS12DC MountDCS1 08092011.jpg2CLAS12DC MountDCS1 08092011.jpg3CLAS12DC MountDCS1 08092011.jpg4CLAS12DC MountDCS1 08092011.jpg

Changing Room

8/23/11

Finished installing the changing room. The changing room is used to put on clean room apparel prior to entering the clean room. A HEPA filter is placed on top of the room and set to high in order to blow particles off a person before they enter the clean room.

2CLAS12DC ChanginRoom 08232011.jpg

We still need to install a hard door between the changing room and the clean room.

Clean Room 8/23/11

1CLAS12DC CleanRoom 08232011.jpg2CLAS12DC CleanRoom 08232011.jpg

Ranking

374 (accountant)

201 (custodian, 9 years of watch repair)

2337(biology tech)

402 (electrical,

612 (mature, duct work,

1222 (fisheries, ranger)

517 (programmer, GED)

4454(electrician)

1180 (Plant operator)

920 (landscaper, welder)

163(No delicate)

246(No close up work)


CLAS12_R1