HRRL July 2012Run
Jump to navigation
Jump to search
Goals
measure the Beam spot size on target
Measure the Transmission
Measure Positrons produced
Runs
- Beam_Test_Jul_16_2012
- Beam_Test_Jul_17_2012
- Beam_Test_Jul_18_2012
- Beam_Test_Jul_19_2012
- Beam_Test_Jul_20_2012
- Beam_Test_Jul_23_2012
- Beam_Test_Jul_24_2012
- Beam_Test_Jul_25_2012
- Beam_Test_Jul_26_2012
- Beam_Test_Jul_27_2012
Energy Estimation on later day runs
When RF knob was at 4.19, the energy is about 11.56 MeV with rms energy spread of 0.66 MeV
Setup
Detector2 (NaI-2 , S/N 60002-8292-I) is at beam left. It needs 1080 V. IAC_NaI_Detectors#Det2
Detector3 is at beam right. It needs 1060 V. IAC_NaI_Detectors#Det3
(When taking down the experiment It was observed that NaI-1, S/N 60002-8454-I was on the Beam right location). NaI-3 was replaced with NaI-1 after run#3663.
Here are images of setup: HRRL_Positrons_Jul_2012_Runs_Setup
Crystal
NaI crystal sizes: 3”x3”
SAINT-GOBAIN
CRYSTAL & DETECTORS
MOD. 3M3/3
S/N:60002-8453-I
P/N:IA-1377
BICRON
Detector Efficiency: Media:SAINT-GOBAIN_3M33_Efficiency.PDF
T1 converter Target spec
0.04 inch = 1.016 mm: File:CHIPs T1 TungstenTargetMatCert 1mm.pdf
In the second week we changed T2 to the same target as T1.
HRRL_Positrons_Jul_2012_Runs_Setup#Targets
Shieldings
What will I do if I run again
Improvements_HRRL_Positron_Runs_July_2012
Links
Dipole mapping: [[1]]