CLAS12 R1 Progress Reports
The Drift Chamber Wiki at JLab
Clean room Prep
Clean room Construction 2011
Jlab Shipment 8/8/2011
Jlab Stringing Prep
Install fixtures
8/9/11
Installed the crane
Brought down the platforms
Bring down the scissor lifts
8/17/11
Install A-Frame for mounting DCs
Mounting Sector 1 DC
Changing Room
8/23/11
Finished installing the changing room. The changing room is used to put on clean room apparel prior to entering the clean room. A HEPA filter is placed on top of the room and set to high in order to blow particles off a person before they enter the clean room.
We still need to install a hard door between the changing room and the clean room.
Clean Room 8/23/11
Ranking
374 (accountant, Maxwell)
201 (custodian, 9 years of watch repair, Nixon)
2337(biology tech, Marci)
402 (electricians mate, construction , Gwen)
4454(mature, electrician, Dale)
612 (mature, duct work, Randall)
517 (programmer, GED, bradley)
920 (landscaper, welder, Mathew)
1222 (fisheries, ranger, shiller)
1180 (Plant operator, Gil)
163(No delicate, Papke)
246(No close up work, Larson)