CLAS12 R1 Progress Reports

From New IAC Wiki
Revision as of 16:08, 25 August 2011 by Foretony (talk | contribs) (→Ranking)
Jump to navigation Jump to search

The Drift Chamber Wiki at JLab

Clean room Prep

CleanRoomPrep2009-2011

Clean room Construction 2011

CleanRoomConstruction2011

Jlab Shipment 8/8/2011

JLabShipment08082011

Jlab Stringing Prep

Install fixtures

8/9/11

Installed the crane


Brought down the platforms


Bring down the scissor lifts

8/17/11

Install A-Frame for mounting DCs

Mounting Sector 1 DC

Changing Room

8/23/11

Finished installing the changing room. The changing room is used to put on clean room apparel prior to entering the clean room. A HEPA filter is placed on top of the room and set to high in order to blow particles off a person before they enter the clean room.

We still need to install a hard door between the changing room and the clean room.

Clean Room 8/23/11

Ranking

374 (accountant,)

201 (custodian, 9 years of watch repair, Nixon)

2337(biology tech)

402 (electrical,

612 (mature, duct work,


517 (programmer, GED)

4454(electrician)

1180 (Plant operator)

920 (landscaper, welder)

1222 (fisheries, ranger)

163(No delicate, Papke)

246(No close up work, Larson)


CLAS12_R1