Installed the crane | Installed the crane | ||
− | [[File:1CLAS12DC_Crane_08092011.jpg| 200 px]] | + | [[File:1CLAS12DC_Crane_08092011.jpg| 200 px]][[File:2CLAS12DC_Crane_08092011.jpg| 200 px]] |
Brought down the platforms | Brought down the platforms | ||
− | [[File:1CLAS12DC_Platform_08092011.jpg| 200 px]] | + | [[File:1CLAS12DC_Platform_08092011.jpg| 200 px]][[File:2CLAS12DC_Platform_08092011.jpg| 200 px]] |
[[ CLAS12_R1]] | [[ CLAS12_R1]] |
Revision as of 21:50, 9 August 2011
The Drift Chamber Wiki at JLab
Clean room Prep
Clean room Construction 2011
Jlab Shipment 8/8/2011
Jlab Stringing Prep
Install fixtures
8/9/11
Installed the crane
Brought down the platforms