=Stringing Begins 9/26/11=
[[File:092511_1CLAS12R1StringingBegins.jpg| 200 px]]


[[ CLAS12_R1]]
[[ CLAS12_R1]]

Revision as of 17:21, 26 September 2011

The Drift Chamber Wiki at JLab

Clean room Prep

CleanRoomPrep2009-2011

Clean room Construction 2011

CleanRoomConstruction2011

Jlab Shipment 8/8/2011

JLabShipment08082011

Jlab Stringing Prep

Install fixtures

8/9/11

Installed the crane


Brought down the platforms


Bring down the scissor lifts

8/17/11

Install A-Frame for mounting DCs

Mounting Sector 1 DC

Changing Room

8/23/11

Finished installing the changing room. The changing room is used to put on clean room apparel prior to entering the clean room. A HEPA filter is placed on top of the room and set to high in order to blow particles off a person before they enter the clean room.

We still need to install a hard door between the changing room and the clean room.

Clean Room 8/23/11


9/22/11

The doors into the clean room have been sealed by temporary walls for the renovation project which will start in the room next door. Below is a picture of the wall which has sheet rock on top of a plastic cover surrounding metal studs. The wall has been calked on the outside to prevent dust from coming through.


Also note that the HVAC temperature setpoint was changed to 70° F around noon.

9/23/11

2 - 480 V outlets have been installed.

Cleanroom fans were turned on this afternoon around 2:30 PM.

Stringing Begins 9/26/11

CLAS12_R1