CLAS12 R1 Progress Reports: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Foretony (talk | contribs)
Foretony (talk | contribs)
Line 28: Line 28:


[[File:1CLAS12DC_Platform_08092011.jpg| 200 px]][[File:2CLAS12DC_Platform_08092011.jpg| 200 px]]
[[File:1CLAS12DC_Platform_08092011.jpg| 200 px]][[File:2CLAS12DC_Platform_08092011.jpg| 200 px]]
Bring down the scissor lifts
[[File:2CLAS12DC_scissorLift_08092011.jpg| 200 px]]


==Changing Room==
==Changing Room==

Revision as of 21:12, 23 August 2011

The Drift Chamber Wiki at JLab

Clean room Prep

CleanRoomPrep2009-2011

Clean room Construction 2011

CleanRoomConstruction2011

Jlab Shipment 8/8/2011

JLabShipment08082011

Jlab Stringing Prep

Install fixtures

8/9/11

Installed the crane


Brought down the platforms


Bring down the scissor lifts

Changing Room

8/23/11

Finished installing the changing room. The changing room is used to put on clean room apparel prior to entering the clean room. A HEPA filter is placed on top of the room and set to high in order to blow particles off a person before they enter the clean room.

We still need to install a hard door between the changing room and the clean room.

CLAS12_R1