Line 28: | Line 28: | ||
[[File:1CLAS12DC_Platform_08092011.jpg| 200 px]][[File:2CLAS12DC_Platform_08092011.jpg| 200 px]] | [[File:1CLAS12DC_Platform_08092011.jpg| 200 px]][[File:2CLAS12DC_Platform_08092011.jpg| 200 px]] | ||
+ | |||
+ | ==Changing Room== | ||
+ | |||
+ | ===8/23/11=== | ||
+ | |||
+ | Finished installing the changing room. The changing room is used to put on clean room apparel prior to entering the clean room. A HEPA filter is placed on top of the room and set to high in order to blow particles off a person before they enter the clean room. | ||
+ | |||
+ | [[File:2CLAS12DC_ChanginRoom_08232011.jpg| 200 px]] | ||
[[ CLAS12_R1]] | [[ CLAS12_R1]] |
Revision as of 20:56, 23 August 2011
The Drift Chamber Wiki at JLab
Clean room Prep
Clean room Construction 2011
Jlab Shipment 8/8/2011
Jlab Stringing Prep
Install fixtures
8/9/11
Installed the crane
Brought down the platforms
Changing Room
8/23/11
Finished installing the changing room. The changing room is used to put on clean room apparel prior to entering the clean room. A HEPA filter is placed on top of the room and set to high in order to blow particles off a person before they enter the clean room.