Difference between revisions of "HRRL July 2012Run"

From New IAC Wiki
Jump to navigation Jump to search
 
(32 intermediate revisions by 2 users not shown)
Line 27: Line 27:
 
* [[Beam_Test_Jul_27_2012]]
 
* [[Beam_Test_Jul_27_2012]]
  
= Setups =
+
== Energy Estimation on later day runs ==
  
Detector2 is at beam left. It needs 1080 V. [[IAC_NaI_Detectors#Det2]]
+
[[https://wiki.iac.isu.edu/index.php/Beam_Test_Jul_11_2012#Energy_estimate_RF_Knob_at_4.19 Energy extrapolation ]]
 +
 
 +
When RF knob was at 4.19, the energy is about 11.56 MeV with rms energy spread of 0.66 MeV
 +
 
 +
= Setup =
 +
 
 +
Detector2 (NaI-2 , S/N 60002-8292-I) is at beam left. It needs 1080 V. [[IAC_NaI_Detectors#Det2]]
  
 
Detector3 is at beam right. It needs 1060 V. [[IAC_NaI_Detectors#Det3]]
 
Detector3 is at beam right. It needs 1060 V. [[IAC_NaI_Detectors#Det3]]
  
 +
(When taking down the experiment It was observed that NaI-1, S/N 60002-8454-I was on the Beam right location).
 +
NaI-3 was replaced with NaI-1 after run#3663.
 +
 +
Here are images of setup: [[HRRL_Positrons_Jul_2012_Runs_Setup]]
 +
 +
== Crystal ==
 +
 +
NaI crystal sizes: 3”x3”
 +
 +
SAINT-GOBAIN
 +
 +
CRYSTAL & DETECTORS
 +
 +
MOD. 3M3/3
 +
 +
S/N:60002-8453-I
 +
 +
P/N:IA-1377
 +
 +
BICRON
 +
 +
 +
[[Media:SAINT-GOBAIN_3M33.PDF]]
 +
 +
Detector Efficiency: [[Media:SAINT-GOBAIN_3M33_Efficiency.PDF]]
 +
 +
Detector Efficiency: [[Media:SAINT-GOBAIN_Efficiency.PDF]]
 +
 +
 +
[[File:SAINT-GOBAIN_3M33.png | 400 px]]
  
 
==T1 converter Target spec==
 
==T1 converter Target spec==
  
[[File:CHIPs_T1_TungstenTargetMatCert_0.8mm.pdf]]
+
0.04 inch = 1.016 mm: [[File:CHIPs_T1_TungstenTargetMatCert_1mm.pdf]]
 +
[[File:CHIPs_T1_TungstenTargetMatCert_1mm.png | 300 px]]
 +
 
 +
In the second week we changed T2 to the same target as T1.
 +
 
 +
[[HRRL_Positrons_Jul_2012_Runs_Setup#Targets]]
 +
 
 +
== Shieldings ==
 +
 
 +
[[hrrl_pos_jul2012_shieldings]]
 +
 
 +
= What will I do if I run again =
 +
 
 +
[[Improvements_HRRL_Positron_Runs_July_2012]]
 +
 
 +
= Links =
  
 +
Dipole mapping: [[https://wiki.iac.isu.edu/index.php/Kiwi_Dipole_Mappings#Matrix_Inversion_Method]]
  
 
[[Positrons]]
 
[[Positrons]]

Latest revision as of 21:46, 11 June 2013

Goals

measure the Beam spot size on target

Measure the Transmission

Measure Positrons produced

Runs

Energy Estimation on later day runs

[Energy extrapolation ]

When RF knob was at 4.19, the energy is about 11.56 MeV with rms energy spread of 0.66 MeV

Setup

Detector2 (NaI-2 , S/N 60002-8292-I) is at beam left. It needs 1080 V. IAC_NaI_Detectors#Det2

Detector3 is at beam right. It needs 1060 V. IAC_NaI_Detectors#Det3

(When taking down the experiment It was observed that NaI-1, S/N 60002-8454-I was on the Beam right location).
NaI-3 was replaced with NaI-1 after run#3663. 

Here are images of setup: HRRL_Positrons_Jul_2012_Runs_Setup

Crystal

NaI crystal sizes: 3”x3”

SAINT-GOBAIN

CRYSTAL & DETECTORS

MOD. 3M3/3

S/N:60002-8453-I

P/N:IA-1377

BICRON


Media:SAINT-GOBAIN_3M33.PDF

Detector Efficiency: Media:SAINT-GOBAIN_3M33_Efficiency.PDF

Detector Efficiency: Media:SAINT-GOBAIN_Efficiency.PDF


SAINT-GOBAIN 3M33.png

T1 converter Target spec

0.04 inch = 1.016 mm: File:CHIPs T1 TungstenTargetMatCert 1mm.pdf CHIPs T1 TungstenTargetMatCert 1mm.png

In the second week we changed T2 to the same target as T1.

HRRL_Positrons_Jul_2012_Runs_Setup#Targets

Shieldings

hrrl_pos_jul2012_shieldings

What will I do if I run again

Improvements_HRRL_Positron_Runs_July_2012

Links

Dipole mapping: [[1]]

Positrons