Difference between revisions of "CLAS12 R1 Progress Reports"
Jump to navigation
Jump to search
Line 55: | Line 55: | ||
[[File:1CLAS12DC_CleanRoom_08232011.jpg| 200 px]][[File:2CLAS12DC_CleanRoom_08232011.jpg| 200 px]] | [[File:1CLAS12DC_CleanRoom_08232011.jpg| 200 px]][[File:2CLAS12DC_CleanRoom_08232011.jpg| 200 px]] | ||
+ | |||
+ | =Ranking= | ||
+ | |||
+ | |||
+ | 374 (accountant) | ||
+ | |||
+ | 201 (custodian, 9 years of watch repair) | ||
+ | |||
+ | 2337(biology tech) | ||
+ | |||
+ | 402 (electrical, | ||
+ | |||
+ | 612 (mature, duct work, | ||
+ | |||
+ | 1222 (fisheries, ranger) | ||
+ | |||
+ | 517 (programmer, GED) | ||
+ | |||
+ | 4454 | ||
+ | |||
+ | 163 | ||
+ | |||
+ | 1180 ( | ||
+ | |||
+ | 920 (landscaper, welder) | ||
+ | |||
+ | 246(No close up work) | ||
+ | |||
[[ CLAS12_R1]] | [[ CLAS12_R1]] |
Revision as of 15:41, 25 August 2011
The Drift Chamber Wiki at JLab
Clean room Prep
Clean room Construction 2011
Jlab Shipment 8/8/2011
Jlab Stringing Prep
Install fixtures
8/9/11
Installed the crane
Brought down the platforms
Bring down the scissor lifts
8/17/11
Install A-Frame for mounting DCs
Mounting Sector 1 DC
Changing Room
8/23/11
Finished installing the changing room. The changing room is used to put on clean room apparel prior to entering the clean room. A HEPA filter is placed on top of the room and set to high in order to blow particles off a person before they enter the clean room.
We still need to install a hard door between the changing room and the clean room.
Clean Room 8/23/11
Ranking
374 (accountant)
201 (custodian, 9 years of watch repair)
2337(biology tech)
402 (electrical,
612 (mature, duct work,
1222 (fisheries, ranger)
517 (programmer, GED)
4454
163
1180 (
920 (landscaper, welder)
246(No close up work)