Difference between revisions of "CLAS12 R1 Progress Reports"
Jump to navigation
Jump to search
(→8/9/11) |
(→8/9/11) |
||
Line 33: | Line 33: | ||
[[File:2CLAS12DC_scissorLift_08092011.jpg| 200 px]] | [[File:2CLAS12DC_scissorLift_08092011.jpg| 200 px]] | ||
+ | |||
+ | ===8/17/11=== | ||
Install A-Frame for mounting DCs | Install A-Frame for mounting DCs |
Revision as of 21:29, 23 August 2011
The Drift Chamber Wiki at JLab
Clean room Prep
Clean room Construction 2011
Jlab Shipment 8/8/2011
Jlab Stringing Prep
Install fixtures
8/9/11
Installed the crane
Brought down the platforms
Bring down the scissor lifts
8/17/11
Install A-Frame for mounting DCs
Changing Room
8/23/11
Finished installing the changing room. The changing room is used to put on clean room apparel prior to entering the clean room. A HEPA filter is placed on top of the room and set to high in order to blow particles off a person before they enter the clean room.
We still need to install a hard door between the changing room and the clean room.