201311 R1ProgressRep

From New IAC Wiki
Revision as of 17:06, 4 November 2013 by Foretony (talk | contribs) (Created page with "=11/04/13= S2: 17 wires; 6 field, 11 sense SL1 - 6 field, 9 sense SL2 - 2 sense '''(done)''' S3: 16 wires; 14 field, 2 sense SL2 - 4 field, 1 sense Total wires left to replac…")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

11/04/13

S2: 17 wires; 6 field, 11 sense SL1 - 6 field, 9 sense SL2 - 2 sense (done)

S3: 16 wires; 14 field, 2 sense SL2 - 4 field, 1 sense

Total wires left to replace between both chambers: 16

S2 determine if we are ready to rotate (will continue working on S2 in December) S3 ready to align SL2


Prepare to Ship 2 chambers

S6 is boxed up and ready to go on a pallet

S5: Pictures taken on most sense wires, SL1 has almost 3 Ua of current draw (need to debug), need to box it up unless we ship S1.

Ship back equipment: ship one of the A-Frames and associated equipment for stringing one chamber.




CLAS12_R1_Progress_Reports