201311 R1ProgressRep
11/04/13
S2: 17 wires; 6 field, 11 sense
SL1 - 6 field, 9 sense
SL2 - 2 sense (done)
S3: 16 wires; 14 field, 2 sense
SL2 - 4 field, 1 sense
Total wires left to replace between both chambers: 16
S2 determine if we are ready to rotate (will continue working on S2 in December) S3 ready to align SL2
Prepare to Ship 2 chambers
S6 is boxed up and ready to go on a pallet
S5: Pictures taken on most sense wires, SL1 has almost 3 Ua of current draw (need to debug), need to box it up unless we ship S1.
Ship back equipment: ship one of the A-Frames and associated equipment for stringing one chamber.