Paste painting procedure
Safety Conditions
Before open the paste please read SDS File:ED7100 OSHA MSDS.pdf for the paste. Be sure that the following are available:
- Ventilation
Working with paste is highly recommended under a good ventilation area, the hood is a good environment for work.
- Poor Ventilation area
Wear a well fitted NIOSH approved or industrial type canister mask.[1], [2]
disposable apron
- Paste Splashing
1- Gloves,goggles.
2- suitable protection clothes.
disposable apron
3- sack of sand or absorber for cleaning the area.
Technical procedure
- Aim
ED7100 paste thickness effect on the electrical resistance of copper based material.
- a- Look at the safety conditions before using the paste.
- b- Equipment And Tools
ER7 reducer, SW100.
- c- Before Processing Measurements
Measure the values of the resistors of each copper shape (if possible)using the multimeter or the multimeter and the power supply.
- d- Paste Processing
1- CLean the paste residues using SW100
3-Let the paste dry, recommended drying conditions are in the table below:
4- Curing for 1 - 2h 30min. at 150 - 165 degrees Celsius.(Contact the company for IR-curing)