Difference between revisions of "HRRL July 2012Run"
Jump to navigation
Jump to search
(→Setup) |
(→Runs) |
||
Line 26: | Line 26: | ||
* [[Beam_Test_Jul_26_2012]] | * [[Beam_Test_Jul_26_2012]] | ||
* [[Beam_Test_Jul_27_2012]] | * [[Beam_Test_Jul_27_2012]] | ||
+ | |||
+ | == Energy Estimation on later day runs == | ||
+ | |||
+ | [[https://wiki.iac.isu.edu/index.php/Beam_Test_Jul_11_2012#Energy_estimate_RF_Knob_at_4.19]] | ||
= Setup = | = Setup = |
Revision as of 06:10, 18 October 2012
Goals
measure the Beam spot size on target
Measure the Transmission
Measure Positrons produced
Runs
- Beam_Test_Jul_16_2012
- Beam_Test_Jul_17_2012
- Beam_Test_Jul_18_2012
- Beam_Test_Jul_19_2012
- Beam_Test_Jul_20_2012
- Beam_Test_Jul_23_2012
- Beam_Test_Jul_24_2012
- Beam_Test_Jul_25_2012
- Beam_Test_Jul_26_2012
- Beam_Test_Jul_27_2012
Energy Estimation on later day runs
[[1]]
Setup
Detector2 (NaI-2 , S/N 60002-8292-I) is at beam left. It needs 1080 V. IAC_NaI_Detectors#Det2
Detector3 is at beam right. It needs 1060 V. IAC_NaI_Detectors#Det3
(When taking down the experiment It was observed that NaI-1, S/N 60002-8454-I was on the Beam right location). NaI-3 was replaced with NaI-1 after run#3663.
Here are images of setup: HRRL_Positrons_Jul_2012_Runs_Setup
T1 converter Target spec
0.04 inch = 1.016 mm: File:CHIPs T1 TungstenTargetMatCert 1mm.pdf
In the second week we changed T2 to the same target as T1.
HRRL_Positrons_Jul_2012_Runs_Setup#Targets
Shieldings
What will I do if I run again
Improvements_HRRL_Positron_Runs_July_2012
Links
Dipole mapping: [[2]]