Revision as of 15:57, 23 July 2012
Goals
measure the Beam spot size on target
Measure the Transmission
Measure Positrons produced
Runs
- Beam_Test_Jul_16_2012
- Beam_Test_Jul_17_2012
- Beam_Test_Jul_18_2012
- Beam_Test_Jul_19_2012
- Beam_Test_Jul_20_2012
Setups
Detector2 is at beam left. It needs 1080 V.
Detector3 is at beam right. It needs 1060 V.