(Created page with ' =Problem unloading Spit= The spit, when standing on the pallet, was between 3-5 inches too high. We laid it down on its side to get it in the dock door. [[CLAS12_R1_Progres…') |
|||
Line 5: | Line 5: | ||
+ | =Pallet #1 Drift Chamber and Strong back= | ||
+ | |||
+ | =Pallet #2 Stringing Fixture= | ||
+ | |||
+ | =Pallet 3 Loading Platform= | ||
+ | |||
+ | =Pallet #4 Manget= | ||
+ | |||
+ | =Pallet #5 Loading platform= | ||
+ | |||
+ | =Pallet #6 & 7 Scissor lifts= | ||
[[CLAS12_R1_Progress_Reports]] | [[CLAS12_R1_Progress_Reports]] |
Revision as of 23:08, 8 August 2011
Problem unloading Spit
The spit, when standing on the pallet, was between 3-5 inches too high. We laid it down on its side to get it in the dock door.