Difference between revisions of "HRRL July 2012Run"

From New IAC Wiki
Jump to navigation Jump to search
Line 33: Line 33:
 
Detector3 is at beam right. It needs 1060 V. [[IAC_NaI_Detectors#Det3]]
 
Detector3 is at beam right. It needs 1060 V. [[IAC_NaI_Detectors#Det3]]
  
  (When taking down the experiment It was observed that NaI-1, S/N 60002-8454-I was on the Beam right location)
+
  (When taking down the experiment It was observed that NaI-1, S/N 60002-8454-I was on the Beam right location).
 +
NaI-3 was replaced with NaI-1 after run#3663.
  
 
[[HRRL_Positrons_Jul_2012_Runs_Setup]]
 
[[HRRL_Positrons_Jul_2012_Runs_Setup]]

Revision as of 23:14, 30 July 2012

Goals

measure the Beam spot size on target

Measure the Transmission

Measure Positrons produced

Runs

Setup

Detector2 (NaI-2 , S/N 60002-8292-I) is at beam left. It needs 1080 V. IAC_NaI_Detectors#Det2

Detector3 is at beam right. It needs 1060 V. IAC_NaI_Detectors#Det3

(When taking down the experiment It was observed that NaI-1, S/N 60002-8454-I was on the Beam right location).
NaI-3 was replaced with NaI-1 after run#3663. 

HRRL_Positrons_Jul_2012_Runs_Setup

T1 converter Target spec

File:CHIPs T1 TungstenTargetMatCert 0.8mm.pdf

In the second week we changed T2 to the same target as T1.

HRRL_Positrons_Jul_2012_Runs_Setup#Targets

Shieldings

hrrl_pos_jul2012_shieldings


Positrons