Difference between revisions of "HRRL July 2012Run"

From New IAC Wiki
Jump to navigation Jump to search
Line 43: Line 43:
  
 
In the second week we changed T2 to the same target as T1.
 
In the second week we changed T2 to the same target as T1.
 +
 +
 +
 +
== Shieldings ==
 +
  
  
 
[[Positrons]]
 
[[Positrons]]

Revision as of 21:49, 30 July 2012

Goals

measure the Beam spot size on target

Measure the Transmission

Measure Positrons produced

Runs

Setup

Detector2 (NaI-2 , S/N 60002-8292-I) is at beam left. It needs 1080 V. IAC_NaI_Detectors#Det2

Detector3 is at beam right. It needs 1060 V. IAC_NaI_Detectors#Det3

(When taking down the experiment It was observed that NaI-1, S/N 60002-8454-I was on the Beam right location)

HRRL_Positrons_Jul_2012_Runs_Setup

T1 converter Target spec

File:CHIPs T1 TungstenTargetMatCert 0.8mm.pdf


In the second week we changed T2 to the same target as T1.


Shieldings

Positrons