Difference between revisions of "HRRL July 2012Run"
Jump to navigation
Jump to search
(→Runs) |
(→Setups) |
||
Line 25: | Line 25: | ||
= Setups = | = Setups = | ||
− | Detector2 is at beam left. It needs 1080 V. | + | Detector2 is at beam left. It needs 1080 V. [[IAC_NaI_Detectors#Det2]] |
− | Detector3 is at beam right. It needs 1060 V. | + | Detector3 is at beam right. It needs 1060 V. [[IAC_NaI_Detectors#Det3]] |
Revision as of 16:38, 23 July 2012
Goals
measure the Beam spot size on target
Measure the Transmission
Measure Positrons produced
Runs
- Beam_Test_Jul_16_2012
- Beam_Test_Jul_17_2012
- Beam_Test_Jul_18_2012
- Beam_Test_Jul_19_2012
- Beam_Test_Jul_20_2012
Setups
Detector2 is at beam left. It needs 1080 V. IAC_NaI_Detectors#Det2
Detector3 is at beam right. It needs 1060 V. IAC_NaI_Detectors#Det3