Difference between revisions of "Niowave Pb-Bi target"

From New IAC Wiki
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
  
 +
[[Liquid_PbBi_Target_in_Solenoid_Magnetic_Field]]
  
 +
=Niowave Pb-Bi liquid target=
 +
== operation==
  
PB-Bi liquid target operation
+
1.) pump down chamber
  
1.) pump down chamber
 
 
2.) backfill with argon to 1atm
 
2.) backfill with argon to 1atm
 +
 
3.) heat top at full power by plugging into wall directly, the other heaters use a rheostat
 
3.) heat top at full power by plugging into wall directly, the other heaters use a rheostat
 +
 
4.) 360 watts applied to mid center until temperature at bottom flange is 120 C
 
4.) 360 watts applied to mid center until temperature at bottom flange is 120 C
 +
 
5.) turn on the other heaters at 20 % of 120 volts until the temperature warms to at least 40 C
 
5.) turn on the other heaters at 20 % of 120 volts until the temperature warms to at least 40 C
6.) vent if the pressure go above 2 ATM
+
 
 +
6.) vent if the pressure goes above 2 ATM
 +
 
 
7.) once loop is about 40 C or more, increase rheostats to 40% of 120 volts
 
7.) once loop is about 40 C or more, increase rheostats to 40% of 120 volts
 +
 
8.) top reservoir will be kept heating at full power until maxing out at 300 C then you can turn it off when bottom well is liquid
 
8.) top reservoir will be kept heating at full power until maxing out at 300 C then you can turn it off when bottom well is liquid
 +
 
9.) at 70 C  in the well increase reostat to 60%
 
9.) at 70 C  in the well increase reostat to 60%
 +
 
10.) unplugged top heater when it hits 289 C, temp in middle of loop was 280
 
10.) unplugged top heater when it hits 289 C, temp in middle of loop was 280
 +
 
11.) when well temp was 170 C , the high power heater (right side) is increased to 100 % while all other heaters are turned off
 
11.) when well temp was 170 C , the high power heater (right side) is increased to 100 % while all other heaters are turned off
12.)
 
  
Once well is the hottest you can turn off top reservoir heater
+
 
  
 
20 C difference between top center and well right
 
20 C difference between top center and well right
Line 26: Line 36:
 
1=well left
 
1=well left
  
 
+
==target description==
 
20 mill windows
 
20 mill windows
 
4mm  target window
 
4mm  target window

Latest revision as of 14:43, 8 December 2014

Liquid_PbBi_Target_in_Solenoid_Magnetic_Field

Niowave Pb-Bi liquid target

operation

1.) pump down chamber

2.) backfill with argon to 1atm

3.) heat top at full power by plugging into wall directly, the other heaters use a rheostat

4.) 360 watts applied to mid center until temperature at bottom flange is 120 C

5.) turn on the other heaters at 20 % of 120 volts until the temperature warms to at least 40 C

6.) vent if the pressure goes above 2 ATM

7.) once loop is about 40 C or more, increase rheostats to 40% of 120 volts

8.) top reservoir will be kept heating at full power until maxing out at 300 C then you can turn it off when bottom well is liquid

9.) at 70 C in the well increase reostat to 60%

10.) unplugged top heater when it hits 289 C, temp in middle of loop was 280

11.) when well temp was 170 C , the high power heater (right side) is increased to 100 % while all other heaters are turned off


20 C difference between top center and well right

4 = top center 3=center left 2 = well right 1=well left

target description

20 mill windows 4mm target window


5 kg of eutectic 45/55 ratio

Heat tape is rated at120 volts at 300 watts


User_talk:Foretony