+ | =6/12/13= | ||
+ | |||
+ | Dion: String S3 with Debbie | ||
+ | |||
+ | Haitham: String S2 with David | ||
+ | |||
+ | David: String S2 with Haitham | ||
+ | |||
+ | Debbie: String S3 with Dion | ||
+ | |||
+ | Carlos: Tension measurements & analyze cosmic data | ||
+ | |||
+ | |||
+ | |||
+ | =6/13/13= | ||
+ | |||
+ | Dion: String S3 with Debbie | ||
+ | |||
+ | Haitham: String S2 with David | ||
+ | |||
+ | David: String S2 with Haitham, took time off between 11am and 6pm | ||
+ | |||
+ | Debbie: String S3 with Dion | ||
+ | |||
+ | Carlos: Tension measurements & analyze cosmic data | ||
+ | |||
+ | |||
+ | S2: on Field row | ||
+ | S3: on Field row | ||
+ | |||
+ | =6/17/13= | ||
+ | |||
+ | Dion: String S3 with Debbie | ||
+ | |||
+ | Haitham: taking scope pictures | ||
+ | |||
+ | David: day off | ||
+ | |||
+ | Debbie: String S3 with Dion | ||
+ | |||
+ | Carlos: Tension measurements & analyze cosmic data | ||
+ | |||
+ | =6/18/13= | ||
+ | |||
+ | Dion: String S3 with Debbie | ||
+ | |||
+ | Haitham: investigate high S5 high current draw | ||
+ | |||
+ | David: day off | ||
+ | |||
+ | Debbie: String with Dion | ||
+ | |||
+ | S2: on Field row 203 | ||
+ | |||
+ | S3: on Field row 211 | ||
+ | |||
+ | =6/19/13= | ||
+ | |||
+ | Dion: String S3 with Debbie | ||
+ | |||
+ | Haitham: String S2 with David | ||
+ | |||
+ | David: String S2 with Haitham, tension measurements in the afternoon | ||
+ | |||
+ | Debbie: String S3 with Dion | ||
+ | |||
+ | S2: on Field row 202 | ||
+ | |||
+ | S3: on Sense wire 1 | ||
+ | |||
+ | Carlos: work on analyzing data to determine efficiency | ||
+ | |||
+ | HV is off on S5. We will purge it with another gas bottle to see if the current decreases. Signals are still present even though the current is high. | ||
+ | |||
+ | =6/20/13= | ||
+ | |||
+ | Dion: String S3 with Debbie | ||
+ | |||
+ | Haitham: String S2 with David | ||
+ | |||
+ | David: String S2 with Haitham, install the HV on SL1 for one board , Dont use the kraken. | ||
+ | |||
+ | Debbie: String S3 with Dion | ||
+ | |||
+ | Carlos: work on analyzing data to determine efficiency | ||
+ | |||
+ | |||
+ | S2: on Field wire row 213 | ||
+ | |||
+ | S3: on Sense wire row 23 | ||
+ | |||
+ | =6/24/13= | ||
+ | |||
+ | Dion: String S3 with Debbie, taking the afternoon off | ||
+ | |||
+ | Haitham: String S2 with David, turn on S5 and check current draw | ||
+ | |||
+ | David: String S2 with Haitham, arrives at 9am; doctor's appointment | ||
+ | |||
+ | Debbie: String S3 with Dion | ||
+ | |||
+ | Carlos: wire tension measurments, work on analyzing data to determine efficiency | ||
+ | |||
+ | |||
+ | S2: on Field wire row 224 | ||
+ | |||
+ | S3: on Sense wire row 46 | ||
+ | |||
+ | |||
+ | =6/25/13= | ||
+ | |||
+ | Dion: String S3 with Debbie | ||
+ | |||
+ | Haitham: String S2 with David | ||
+ | |||
+ | David: String S2 with Haitham, install octopus on S5 SL2 and start HV burn in | ||
+ | |||
+ | Debbie: String S3 with Dion | ||
+ | |||
+ | Carlos: wire tension measurments, work on analyzing data to determine efficiency | ||
+ | |||
+ | |||
+ | S2: on Sense wire row 6 | ||
+ | |||
+ | S3: on Sense wire row 66 | ||
[[CLAS12_R1_Progress_Reports]] | [[CLAS12_R1_Progress_Reports]] |
Latest revision as of 17:11, 25 June 2013
6/3/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham
Debbie: string S3 with Dion
Carlos: analyze cosmic data
6/4/13
Dion: Look for S5 signals then String S3 with Debbie in the afternoon
Haitham: String S2 with David
David: String S2 with Haitham then look for S5 signals
Debbie: Organize work area in the morning string S3 with Dion in the afternoon
Carlos: analyze cosmic data
Changed flow rate from 30 down to 50.
6/5/13
Dion: bring shipping crates from airport then String S3 with Debbie in the afternoon
Haitham: String S2 with David
David: String S2 with Haitham (left early)
Debbie: bring shipping crates from airport in the morning string S3 with Dion in the afternoon
Carlos: analyze cosmic data
6/6/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham
Debbie: string S3 with Dion
Carlos: analyze cosmic data
6/10/13
Dion: String S2 & S3 with Debbie
Haitham: DC pictures
David: sick day
Debbie: String S2 & S3 with Dion
Carlos: Tension measurements & analyze cosmic data
S3: on Field row 154
S2: on Field row 161
6/11/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham
Debbie: String S3 with Dion
Carlos: Tension measurements & analyze cosmic data
S2: on Field row 169
S3: on Field row 160
6/12/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham
Debbie: String S3 with Dion
Carlos: Tension measurements & analyze cosmic data
6/13/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham, took time off between 11am and 6pm
Debbie: String S3 with Dion
Carlos: Tension measurements & analyze cosmic data
S2: on Field row
S3: on Field row
6/17/13
Dion: String S3 with Debbie
Haitham: taking scope pictures
David: day off
Debbie: String S3 with Dion
Carlos: Tension measurements & analyze cosmic data
6/18/13
Dion: String S3 with Debbie
Haitham: investigate high S5 high current draw
David: day off
Debbie: String with Dion
S2: on Field row 203
S3: on Field row 211
6/19/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham, tension measurements in the afternoon
Debbie: String S3 with Dion
S2: on Field row 202
S3: on Sense wire 1
Carlos: work on analyzing data to determine efficiency
HV is off on S5. We will purge it with another gas bottle to see if the current decreases. Signals are still present even though the current is high.
6/20/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham, install the HV on SL1 for one board , Dont use the kraken.
Debbie: String S3 with Dion
Carlos: work on analyzing data to determine efficiency
S2: on Field wire row 213
S3: on Sense wire row 23
6/24/13
Dion: String S3 with Debbie, taking the afternoon off
Haitham: String S2 with David, turn on S5 and check current draw
David: String S2 with Haitham, arrives at 9am; doctor's appointment
Debbie: String S3 with Dion
Carlos: wire tension measurments, work on analyzing data to determine efficiency
S2: on Field wire row 224
S3: on Sense wire row 46
6/25/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham, install octopus on S5 SL2 and start HV burn in
Debbie: String S3 with Dion
Carlos: wire tension measurments, work on analyzing data to determine efficiency
S2: on Sense wire row 6
S3: on Sense wire row 66