Difference between revisions of "201306 R1ProgressRep"
(→6/5/13) |
(→6/5/13) |
||
Line 39: | Line 39: | ||
Carlos: analyze cosmic data | Carlos: analyze cosmic data | ||
+ | |||
+ | =6/6/13= | ||
+ | |||
+ | Dion: String S3 with Debbie | ||
+ | |||
+ | Haitham: String S2 with David | ||
+ | |||
+ | David: String S2 with Haitham (left early) | ||
+ | |||
+ | Debbie: string S3 with Dion | ||
+ | |||
+ | Carlos: analyze cosmic data | ||
=6/10/13= | =6/10/13= |
Revision as of 17:35, 10 June 2013
6/3/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham
Debbie: string S3 with Dion
Carlos: analyze cosmic data
6/4/13
Dion: Look for S5 signals then String S3 with Debbie in the afternoon
Haitham: String S2 with David
David: String S2 with Haitham then look for S5 signals
Debbie: Organize work area in the morning string S3 with Dion in the afternoon
Carlos: analyze cosmic data
Changed flow rate from 30 down to 50.
6/5/13
Dion: bring shipping crates from airport then String S3 with Debbie in the afternoon
Haitham: String S2 with David
David: String S2 with Haitham (left early)
Debbie: bring shipping crates from airport in the morning string S3 with Dion in the afternoon
Carlos: analyze cosmic data
6/6/13
Dion: String S3 with Debbie
Haitham: String S2 with David
David: String S2 with Haitham (left early)
Debbie: string S3 with Dion
Carlos: analyze cosmic data
6/10/13
Dion: String S2 & S3 with Debbie
Haitham: DC pictures
David: sick day
Debbie: String S2 & S3 with Dion
Carlos: Tension measurements & analyze cosmic data
S3: on Field row 154
S2: on Field row 161