Difference between revisions of "PAS Experiment"
Jump to navigation
Jump to search
(24 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
=[[CH_PAS_Master_Timeline]]= | =[[CH_PAS_Master_Timeline]]= | ||
+ | ==[[CH Weekly Reports]]== | ||
= Materials = | = Materials = | ||
Line 17: | Line 18: | ||
[[PAS_Experiment_Attenuation_Measurements]] | [[PAS_Experiment_Attenuation_Measurements]] | ||
+ | |||
+ | [[CH Clean Room Renovations]] | ||
= DAQ = | = DAQ = | ||
+ | |||
+ | |||
+ | [[CH_Reading_CODA_Data]] | ||
+ | |||
+ | |||
+ | [[DAQ2_Upgrade_Summer_2021]] | ||
+ | |||
+ | [[CAEN V785N ADC]] | ||
+ | |||
+ | [[VME modules]] | ||
+ | |||
+ | [[Data Acquisition]] | ||
+ | |||
+ | [[LB Thesis DAQ Writeup]] | ||
+ | |||
+ | [[Readout Controller]] | ||
+ | |||
+ | [[Readout Controller Configuration]] | ||
+ | |||
+ | [[Readout Controller Library]] | ||
+ | |||
+ | [[File:Readout Controller Library.pdf]] | ||
+ | |||
+ | [[File:MastersThesis.pdf]] By Warren Parsons | ||
==6/1/21== | ==6/1/21== | ||
Line 27: | Line 54: | ||
*Second nim bin causing errors with modules when bin is close to full. Could be drawing too much current, Dr. Dale is sourcing new nim bin from IAC to replace. We have extras here but need <math>\pm</math>6V and all tested are either non-functioning or have <math>\pm</math>12V & 24 but no 6V | *Second nim bin causing errors with modules when bin is close to full. Could be drawing too much current, Dr. Dale is sourcing new nim bin from IAC to replace. We have extras here but need <math>\pm</math>6V and all tested are either non-functioning or have <math>\pm</math>12V & 24 but no 6V | ||
+ | |||
+ | =Experiment= | ||
+ | |||
+ | [[PAS_Feasibility_Study_Runs]] | ||
+ | |||
+ | [[CaGaS Phase II]] | ||
=CH_Resources= | =CH_Resources= | ||
[[CH_Code_Repository]] | [[CH_Code_Repository]] | ||
+ | |||
+ | [[CH_Isotope_Table]] | ||
+ | |||
+ | [[CH_ROOT_Nonuniform_Binning]] | ||
= Related Papers = | = Related Papers = | ||
See google drive for now | See google drive for now | ||
− | |||
− | |||
---- | ---- | ||
− | |||
− | |||
[[User:Harpconn]] | [[User:Harpconn]] | ||
[[UnderGraduate_Neutron_Correlations_Lab]] | [[UnderGraduate_Neutron_Correlations_Lab]] |
Latest revision as of 16:49, 22 September 2022
CH Task List
CH_PAS_Master_Timeline
CH Weekly Reports
Materials
PAS_Experiment_Attenuation_Measurements
DAQ
CH_Reading_CODA_Data
Readout Controller Configuration
File:Readout Controller Library.pdf
File:MastersThesis.pdf By Warren Parsons
6/1/21
- ADC/TDC readout still not functioning. Dr. Forest is going to work on rebuilding the setup
- I will attempt to hunt down manuals for each module and I will compile them here if found - need to look at Jeff Burggraf's wiki entries as this issue may already have a solution
- Second nim bin causing errors with modules when bin is close to full. Could be drawing too much current, Dr. Dale is sourcing new nim bin from IAC to replace. We have extras here but need 6V and all tested are either non-functioning or have 12V & 24 but no 6V
Experiment
CH_Resources
Related Papers
See google drive for now