R1S6 SL2 HVB5 BurnIn

From New IAC Wiki
Jump to navigation Jump to search
Date Time (24h) HV Board ID Guard (V) Field (V) Sense (V) Sense ([math]\mu[/math]A) Field ([math]\mu[/math]A) comments
03/11/13 16:50 S6 SL2 HVB5 50 -50 50 0.000 0.065 Probed traces and pins connected to boots for fields/guard, all are showing voltage.
03/11/13 16:56 S6 SL2 HVB5 536 -750 1500 11.5 11.7 Peaked around 13 [math]\mu[/math]A initially, but is rapidly decreasing after sense wires stabilized at operating voltage. Trip is set to 50 [math]\mu[/math]A, no wires tripped during voltage rise at 5 V/s.
03/11/13 17:11 S6 SL2 HVB5 536 -750 1500 10.7 10.8
03/11/13 17:32 S6 SL2 HVB5 536 -750 1500 10.2 10.3
03/11/13 17:47 S6 SL2 HVB5 536 -750 1500 10.1 10.2 Left HV on overnight
03/12/13 07:34 S6 SL2 HVB5 536 -750 1500 7.5 7.6
03/12/13 10:38 S6 SL2 HVB5 536 -750 1500 7.1 7.2
03/12/13 13:54 S6 SL2 HVB5 536 -750 1500 6.9 7.0
03/12/13 16:55 S6 SL2 HVB5 536 -750 1500 6.8 6.9 Left HV on overnight
03/13/13 07:30 S6 SL2 HVB5 536 -750 1500 5.8 5.9
03/13/13 09:55 S6 SL2 HVB5 536 -750 1500 5.6 5.7
03/13/13 16:45 S6 SL2 HVB5 536 -750 1500 5.3 5.4
03/13/13 17:45 S6 SL2 HVB5 536 -750 1500 5.3 5.4 Left HV on overnight
03/14/13 10:37 S6 SL2 HVB5 536 -750 1500 3.6 3.7
03/14/13 13:43 S6 SL2 HVB5 536 -750 1500 3.4 3.5
03/14/13 16:18 S6 SL2 HVB5 536 -750 1500 3.1 3.2

Turned off HV immediately after reading to put on STB

03/14/13 16:46 S6 SL2 HVB5 536 -750 1500 3.2 3.3

STB put on. Voltage rise completed, no excess current compared to before STB was installed. HV left on over the weekend.

03/18/13 10:31 S6 SL2 HVB5 536 -750 1500 0.48 0.57
03/18/13 15:48 S6 SL2 HVB5 536 -750 1500 0.35 0.45 HV left on overnight
03/19/13 07:29 S6 SL2 HVB5 536 -750 1500 0.1 0.2